ARIEL ANASCO, Project Engineer

ARIEL ANASCO

Project Engineer

Sumitomo Corporation

Location
United Arab Emirates
Education
Bachelor's degree, MECHANICAL ENGINEERING
Experience
19 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :19 years, 11 Months

Project Engineer at Sumitomo Corporation
  • Saudi Arabia - Khobar
  • March 2013 to June 2014

• Created standards, methods, processes and procedures for reviewing, evaluating and inspecting mechanical projects on various Saudi Aramco sites.
• Identified design, process and equipment options to satisfy client needs, minimize costs and limit potential operational problems.
• Maintained timely and accurate oral and written technical reports regarding assigned engineering activities.
• Coordinated contractors and other project team members to deliver high quality projects within specified time frames.
• Recommended design modifications to eliminate machine and system malfunctions
• Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies
• Responsible for coordinating on all technical activities on assigned projects such as HVAC, Instrumentation, Piping, Plumbing, and Fire Detection and Alarm System at various Saudi Aramco facilities.
• Monitor works for compliance to applicable codes and standards.
• Ensures effective communication and coordination on assigned projects between all discipline and all other project participants.
• Participating in client/contractor meetings and resolving client/engineering and management project issues.
• Prepares project status reports by collecting, analyzing, and summarizing information and trends; recommending actions.
• Carry out testing and commissioning of mechanical equipment and systems.

Pre-Commissioning Engineer at Saipem
  • Saudi Arabia - AlKhafji
  • March 2012 to January 2013

• Responsible for the execution of precommissioning activities (pipe cleaning, pressure testing, layup, reinstatement) on newly constructed/erected piping as required on the Test Packages.
• Ensures work permit are applied prior to the execution of any activities on site.
• Responsible for coordinating on all technical activities on assigned projects.
• Monitor works for compliance to applicable codes and standards.
• Ensures effective communication and coordination on assigned projects between all departments and all other project participants.
• Participating in client/contractor meetings and resolving client/engineering and management project issues.
• Prepares project status reports by collecting, analyzing, and summarizing information and trends; recommending actions.

Project Engineer at Berri Gas Plant-Saudi Aramco
  • Saudi Arabia - Jubail
  • February 2011 to February 2012

• Handles and manages multi-discipline projects that requires short form contracts (short term).
• Responsible for preparing scope of work for short form contracts.
• Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates.
• Developed engineering plans, specifications and bid documents.
• Provides project presentation to contractors prior to bidding.
• Responsible for coordinating on all technical activities on assigned projects.
• Monitor works for compliance to applicable codes and standards.
• Ensures effective communication and coordination on assigned projects between all discipline and all other project participants.
• Participating in client/contractor meetings and resolving client/engineering and management project issues.
• Prepares project status reports by collecting, analyzing, and summarizing information and trends; recommending actions
• Coordinated contractors, architects and other project team members to deliver high quality projects within specified time frames.
• Maintained timely and accurate oral and written technical reports regarding assigned engineering activities.

Maintenance Supervisor at Qatar Electricity and Water Co.
  • Qatar - Doha
  • January 2010 to December 2010

• Responsible for directing and supervising the activities of assigned personnel involved in the maintenance of Mechanical Equipments related to Distillers, Boilers and its related auxiliary equipments to Water Station.
• Responsible for Supervising preventive, breakdown and planned overhaul of assigned mechanical equipment.
• To participate in diagnosis and repair of major breakdown and to estimate time of repair and ensure timely return of repaired equipment.
• To supervise on site annual overhaul and to follow work schedule.
• To carryout pre-commissioning, commissioning and testing of pipings and mechanical equipment after repair or overhauling works were completed.
• To check safety, work permit and preventive maintenance plan.
• To plan, check specification and to ensure that maintenance works are carried out according to agreed, schedule, cost estimate and required quality.
• To assist maintenance engineer in organizing spare-parts ordering plan and to check stock list.
• Suggest and carry out necessary modification in the plant to improve its performance.
• To supervise lifting operation in job where assigned.
• Maintain and updates a log of maintenance work done.

Sr. Project Engineer at Arjen Industrial Resources, Inc.
  • Philippines
  • March 2006 to January 2010

•• Handles various projects such as HVAC equipment and chiller maintenance, piping and duct fabrication, boiler and heat exchanger descaling, painting, construction and other preventive maintenance and shutdown works.
• Interprets and implements policies established by the management.
• Provides leadership, direction, and guidance of company activities.
• Analyzes and evaluates the effectiveness of all operations.
• Coordinates major activities through subordinates and appraises assigned personnel.
• Represents the company to regulatory agencies, trade associations, community and civic organizations, members, and other financial institutions.
• Regularly visits and monitors projects and immediately corrects any detected problems.
• Collaborated closely with procurement teams and suppliers on purchase and delivery of components and assemblies.
• Developed, coordinated, and monitored all aspects of production, including selection of manufacturing methods, fabrication, and operation of product designs.
• Identified design, process and equipment options to satisfy client needs, minimize costs and limit potential operational problems.

Shift Charge Engineer at Saudi Oger Ltd.
  • Saudi Arabia - Jubail
  • August 2003 to February 2006

• Supervise operation and troubleshooting activities of all process equipment in a desalination plant such as boilers, evaporators, compressors, pumps, etc. during the shift.
• Execute plant start-up and shutdown
• Responsible in preparing shift log reports, production reports, water quality reports and submit to immediate supervisor.
• Conduct safety meeting for the awareness of all subordinates.
• Reports maintenance activities thru SAP.
• Carry out pre-commissioning, commissioning of repaired pipelines and equipment.
• Preparation of SOP’s for the smooth and efficient operation of equipment.

Utilities Senior Supervisor at YOKOHAMA TIRE PHILIPPINES, INC.
  • Philippines
  • January 1997 to May 2003

• In-charge in the operation and maintenance of plant utility equipment such as boilers, compressors, cooling towers, water and wastewater treatment plants, potable water system, power generators, chillers, HVAC, etc.
• Monitoring and testing of boiler water and cooling water to maintain required quality.
• Recommends/specify materials/equipment as required for a certain project or system improvement.
• Preparation of SOP’s and preventive maintenance schedules and activities for utility equipment.
• Conducting in-house seminars/lectures for operators and technicians regarding plant safety and successful engine operation and maintenance.
• Preparation of schedule for shutdown works including materials, tools, and manpower to accomplish each work on a specific period.
• Monitors all activities of contractors for utility piping and equipment from fabrication, installation, pre-commissioning, commissioning and start-up stages.
• Supervision of mechanical equipment installation, testing and commissioning.
• Undertakes study, design, construction or installation of pollution control facilities or device.
• Supervises the proper operation and maintenance of pollution control works, facilities or devices.
• Facilitate compliance of the company with the requirements that may from time to time be prescribed by the government environmental agency.
• Recommend to the management the installation and operation of additional equipment for the pollution abatement facilities.
• Handle others matters of environmental concern as required by the company.
• Conduct environmental auditing and assessment.

Mechanical Engineer at ELECTROBUS CONSOLIDATED INC.
  • Philippines
  • April 1994 to December 1996

• Supervision of mechanical equipment installation, tank & piping works, pre-commissioning and commissioning.
• Preparation of SOP’s and preventive maintenance work for diesel engines and other auxiliary equipment such as boilers, centrifuges, compressors, pumps, etc. to maintain plant reliability and efficiency.
• Analyze engine parts or system troubles and devise steps to prevent the problem from recurring.
• Monitoring and testing of engine lube oil, fuel, and water to maintain required quality.
• Preparations of design and layout for various projects and supervise during actual work.
• Conducting in-house seminars/lectures for operators, mechanics, and duty engineers regarding plant safety and successful engine operation and maintenance.
• Recommends/specify materials/equipment as required for a certain project or system improvement.

Education

Bachelor's degree, MECHANICAL ENGINEERING
  • at HOLY ANGEL UNIVERSITY
  • April 1994

Specialties & Skills

Testing
Preparation
Commissioning
Installation
MACHINE MAINTENANCE
COMPUTER LITERATE
Project Management

Languages

English
Expert

Training and Certifications

Machinery Maintenance (Training)
Training Institute:
Yokohama Rubber Co. - Japan
Date Attended:
January 1997
Duration:
3600 hours