(ELECTRICAL) involved in erection of 220kV, 220/132kV, 33/11kV Substation under ALSTOM T&D for TAKREER for GUP Expansion Project Phase III.
The Key Performance Matrix includes
•Preparation of technical submittals, BOQ as per IFC drawings, site quantity take-off, & ordered materials at site as approved.
•Hands on experience for each & every stage of HV, MV and MEP scope right from the tendering stage through to designing.
•Installation of Switchgear and panels.
•Laying of 1Cx1200mm2220kV cable between 400/220kV Transco Ruwais Grid Substation and 220kV Takreer Substation(13.3 km)
•Laying of 1Cx1400mm2 132kV cable between Takreer 132kV GIS to GT transformers.
•Laying of 1Cx630smm233kV cables between Takreer 33kV Switchgear and Fertil-2 Transformers.
•Cable laying 11kV between Takreer 11kV switchgear and existing GUP feeders.
•Installation of Lighting and small power, telecommunication and HVAC systems.
•Installation of Grid earthing systems
•Installation of lightning protection systems.
•Drawing & Technical document submission work for consultant approval.
•Monitored and controlled construction activities as per the planning schedule.
•Direct Supervision of Civil Activities such as Trench Excavation, Dune sand filling, RC Construction, HDD works, Cable laying,
•Prepared daily reports on the work progress and verified the work completed.
•Co-ordination with Consultant/TPI for inspection, approval, technical discussion and Progress review.
•Co-ordination with testing team for site Electrical & HV test.
•Acted as MEP co-ordinator and QA/QC Engineer.
•Measurement sheet preparation for Invoicing.
•Actively handled ordering all required electrical materials by coordinating with Purchasing Department and Suppliers
•Preparation and submission of AS BUILT drawing, QTY variation statement, NOSP documents.
•Direct Supervision of substation Equipment installation activities, Inspection & testing
co-ordination work.
•Coordinated all services as per the latest revised drawings, prepared log red marking drawings whenever work at site deviated from the approved construction drawing, & used for final as-built drawings.
•Performed actual site quantity take off, placing & following up these orders with suppliers to ensure materials availability at site on time.
•Overseen consultant/ main contractor inspections & issued clearances to proceed with structural / civil work activities.
•Raised & undertaken together with the consultant, area wise work inspections to ensure work completion as per prescribed quality norms.
•Overseen testing, pre-commissioning, & commissioning stages of all MEP services / systems jointly with the consultant to ensure that all operations meet project specifications & requirements.
•Attended performance review meetings with the client as well as the main contractor
•Prepared & forwarded the operation & maintenance manual in final stage before project handover.
•Steered installation, coordination, inspection & testing of different MEP services like-
•Electrical lighting, power, fire alarm detection and voice alarm, emergency lighting, security, structured cabling, building management system, leak detection and earthing& lightning protection systems;
•Heat ventilation & air conditioning systems;
•Plumbing drainage & plumbing water supply systems;
•Fire fighting& fire protection systems- sprinkler system, wet riser system, NOVEC system, & foam deluge system fire stopping works done for wall & slab penetrations of the above said systems.
As
- مجال الشركة:
- النفط والغاز
- الدور الوظيفي:
-
الهندسة