Ashraf Helmy Teleb, Planning Production Engineering

Ashraf Helmy Teleb

Planning Production Engineering

Egypt Gold

Location
Egypt - Cairo
Education
Bachelor's degree, engineering
Experience
19 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :19 years, 11 Months

Planning Production Engineering at Egypt Gold
  • Egypt - Cairo
  • January 2015 to January 2016

back to planning production engineering at "Egypt Gold"

Maintenance Engineer at KGLpts
  • United Arab Emirates - Sharjah
  • August 2012 to October 2014

*KGLpts "Maintenance Engieer"Responcible for 140 Busses 49Passenger Agrale. Brazil Made & MCV Egypt Made plus 20 Busses Mercedes"Elba"52 Passenger under Supervision of Sharja Transportation. Azra Area, Sharja, UAE. Since Aug 08 till Now.
*Production Planning Engineer "Lazurde-Egypt" Establishing P.P.C. Section .Max Capacity of 600kg/month. Preparing Prod. Plans and Monthly & Daily Follow- Up Reports. 9 Data Entry personnel for each sec. are reported to P.P.C. Sec. For 9 Months, Preparing B.O.M. for Cost Accounting Product Pricing, Max Prod. Capacity and preparing all Historical Data Top Management Req. to take decision and for preparing the Yearly Budget. Also, preparing data, calculation for new factory and Short Term Target 3 years 12 ton/year. For three months responsible for "Wax and Casting"60 Workers as Senior Supervisor. Obour city. Since Aug'12 till Oct'14.

Production Planning Engineering at Lazurde-Egypt
  • Egypt - Cairo
  • January 2010 to July 2012

Establishing P.P.C Section. Max Capacity of 600 kg/month.Preparing Prod, Plans and Monthly & Daily Follow-Up Reports.

Production Planning Engineer at "Automacy Envelope Industry"
  • Egypt - Cairo
  • March 2008 to December 2009

*Production Planning Engineer "Automacy Envelope Industry "for Auto mailer Envelope. Market Chare 90% Compatible for Three Types Enveloping m/cs, High Quality Paper and Printing Precision. Individual for Pockets all sizes p&s and adhesive flap. Productivity of 5 million envelopes per month. Max speed of 400 envelopes per min. Labor of 20 personnel 2 shifts 24hrs. Obour City. Since March 2008 till Dec 2009.

Production Planning Engineer at "Techno Egypt" for Stationary Requirements, Filling Systems
  • Egypt - Cairo
  • June 2006 to January 2008

* Production Planning Engineer "Techno Egypt "for Stationary Requirements, Filling Systems. 2 Automated Production Lines. For pp Folder Files and Sheet Protector. Max production rate one million file, two million protectors per month. Also 10 PVC Welding Machines for Loose Leaf Files. Max of 150.000 file per month. Preparing section (Slitter, Sheeter, and Index Sheeter). Labor 70 Male & Female. At free zone Nassr City - Export only. Since June 2005

*Production Planning Engineer "Al Rabwa Co." for Gold and Silver Chain. Max of 300kg per month. Production Plans, Planning Orders. Daily follow up reports, down time, Malfunction Reports. Labor 120 Professional labor, Machinery Italy "sisma". For two years and half. Since june 2006.Obour City.

Engineer at Dextro Misr
  • Egypt - Cairo
  • January 2001 to June 2005

Testing pipe lines, Pumps, Tanks. All utilization Plants of the project (Boilers, Water Treatment, Waste Water Treatment, Fire Fighting System)

Planning Production Engineer at Egypt Gold
  • Egypt - Cairo
  • October 1998 to January 2001

*Engineering Department "Dextro Misr" In Phase of Installation of the Project, Testing pipe lines, Pumps, Tanks. All utlilization Plants of the project (Boilers, Water Treatment, Waste Water Treatment, Fire Fighting System) . Tenth of Ramadan.

*Planning Production Engineer "Egypt Gold" First 8 months I was Head of Wax Section,

Shift Engineer at Castico co
  • Egypt - Cairo
  • December 1997 to August 1998

*Shift Engineer "Castico co." for Film Extrusion. 3 Layer Extrusion Line Producing (Cling Film, Stretch Film. Max of 250 kg per day. Also 4 Injection Machines. Max of 500 kg per day. 12 hrs Shift. Badr City. Since December 1997.

Shift Engineer at Ezz Group
  • Egypt - Cairo
  • November 1994 to June 1996

* Shift Engineer "Ezz Group" for Bar and Rebar Reinforced Steel Bar. 8 hrs Shift, 2 Days off 4 Working Groups. Max of 24000 ton per month. Resbonsible for (Loading area, Preheating Furnaec 1050 degrees) . Rolling Automated Danielle Rolling Line (Cotrolled Speed - 24 stand -Max of 50 m/s speed-Three Flying Shear - Cooling Cconveyor 50 m long - Finishing Area for Coil - Cooling Bed for Rebar) . I received Model Production Department Engineering June 1996. Tenth of Ramadan city. Since November 1994.

Shift Engineer at "Misr Al Nour"
  • Egypt - Cairo
  • August 1994 to October 1994

* Shift Engineer "Misr Al Nour" for Tape Extrusion and Bags textile .2 Extrusion Llines 67 Textile Machines, One Coating Line, Two Priting Machines, Ten Sawing Machines. Max of 250 kg per day. 12 hrs shift. 10Th of Ramadan. Since August 1994.

College Trainee at "Egypt Gas" Technical Office and Installation Section
  • Egypt - Cairo
  • July 1993 to July 1994

*College Trainee at "Egypt Gas" Technical Office and Installation Section. July 1993.

*Training at "Green Valley" PVC Pipes Extrusion. Manufacturing and Maintenance Workshop. Max
Of 400 mm diameter of pipe. Sadat City at km 95 Cairo-Alex Desert Road. June 1992.

Education

Bachelor's degree, engineering
  • at Cairo University
  • January 1994

*B.A. engineering "Mechanical Department - Production Section" from Cairo University 1994. *Graduati

Specialties & Skills

Extrusion
Production
Casting
AUTO BODY
CASTING
COOLING
ENGINEER
EXTRUSION
FINISHING
PRODUCTION ENGINEER
leadership
coordination
Computer

Languages

Arabic
Expert
English
Expert
German
Expert