PORE PRESSURE ENGINEER
EXCELLENCE LOGGING/SURFACE DATA LOGGING
Total years of experience :16 years, 5 Months
• Oversaw estimation and evaluation of pore pressure on 24 hour basis.
• Served as key member of management team of several HT/HP wells.
• Provided constant well bore stability monitoring and reservoir analysis.
• Performed detailed gas analysis for reservoir sections and zones of interest.
• Served as field representative for any interactions with client in the field and logistics related to operations.
• Maintained communications between office and field personnel.
• Provided on the job training when required.
• Analyze geochemical data and generate daily reports and logs for clients.
• Provide analytical support to field crews.
• Secured long term contract with Kuwait oil company for use of geoscience equipment.
• Studied geology of region and area of interest, analyzing previous studies, reporting, making geological correlations and interpretations, following operations and wire-line logging, Collected and evaluated geological and geophysical data, and prepared databases.
• Supervised all wellsite geoscience operations on rig-site.
• Provided 24 on call field support for working geoscience operators.
• Diagnosed and troubleshot hardware and software issues.
• Performed preliminary QA/QC on raw data.
• Provided case study data for accurate zonation of several geo-steered wells.
• Oversaw estimation and evaluation of pore pressure on 24 hour basis.
• Served as key member of management team of several HT/HP wells.
• Provided constant well bore stability monitoring and reservoir analysis.
• Performed detailed gas analysis for reservoir sections and zones of interest.
• Managed daily reports and digital plots, unit operation and real-time data monitoring.
• Supervised and managed entire unit crew.
• Served as field representative for any interactions with client in the field and logistics related to operations.
• Maintained communications between office and field personnel.
• Provided on the job training when required.
Provide estimation and evaluation of pore pressure on 24 hour basis.
Generating daily reports and digital plots for pore pressure, unit operation as well as realtime and depth based logs.
Supervise and manage the whole unit crew.
Act as a company field representative for any procedures and dealings with the clients.
Maintain a communication link between office and field personnel.
Monitoring tasks in a safe, timely and accurate manner in order to ensure efficient performance of the mobile laboratory unit onsite
Ensuring the process flow of the drilling operation.
Maintaining sensors and data acquisition equipment.
Gathering and analyzing data during the drilling operation.
As the companys representative onsite acting in charge of the relationship with the client.
Attending daily meetings with the client and providing the client with daily reports on drilling operations.
Managing the daily activities of Mud Loggers and Sample Catchers.
Taking part in mud logging training programs.
Full knowledge of unit equipment (Rig-up, Rig-down, maintenance, & calibration)
Co-ordinate with client for updates on daily basis.
Supervise trainees in the field
Trouble-shooting Mud-logging unit sensors & maintenance
Monitoring Drilling parameters
Sampling and lithological description
Gas sampling analysis
Compiling geologic reports and data sheets
Lag time determination
Sampling and lithological description
Assisting Mud-loggers in compiling reports and Mudlogs
Revising Certificates & Approving Their Issuance.
Revising Reports for Various Operations.
Assisting The Operation Manger In His Duties.
Supervising & Training Junior Staff in the Field.
Receiving Orders from Clients & Relaying To the Appropriate Inspectors.
Co-ordination between Inspectors in the Field & the Operation Department.
Inspection, Weighing, Sampling & Analysis of Metals, Minerals & Ores, Precious Metals, Solid Fuels, Chemicals, Recycling & Scrap Materials.
Ullage & Sampling of Marine Vessel Tanks & Shore Tanks.
Full B.Sc in Geology & Chemistry obtained in 2007