عاصف بدر بدر الين, Manager Planning and Maintainance

عاصف بدر بدر الين

Manager Planning and Maintainance

HTI Pvt. Ltd,.

البلد
باكستان - كراتشي
التعليم
بكالوريوس, Computer Science
الخبرات
13 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 9 أشهر

Manager Planning and Maintainance في HTI Pvt. Ltd,.
  • باكستان - كراتشي
  • أشغل هذه الوظيفة منذ أكتوبر 2017

- Streamlined production processes by implementing lean methodologies, resulting in a 25% reduction in lead time and a 15% increase in overall output.
- Revamped manufacturing procedures through comprehensive analysis, documentation, and process controls; optimized productivity, minimized costs, and met scheduling requirements, resulting in a 15% increase in efficiency and $150k in annual savings.
- Manage manufacturing equipment through maintenance of existing equipment, establishing new equipment requirements, installation of new equipment, etc.
- Determine performance standards. Ensure employees understanding and compliance with performance standards through establishment of accountability for work.
- Manage all engineering projects.
- Project planning and forecasting.
- Plant layout designing on AutoCAD
- Core ERP system management for planning and Maintenance asset management
- Ensure completion of all required paperwork, records, documents, ERP etc.
- Ensure all safety and work rules and regulations are followed. Ensure departmental housekeeping standards.
- Management Representative (MR) and internal auditor for ISO audit preparation

Site Engineer Erection & Installation في LifCon Co, Ltd.
  • المملكة العربية السعودية - جدة
  • ديسمبر 2015 إلى مايو 2016

- Conducted survey of different work sites.
- Preparing fortnight reports of survey.
- Checked the progress of the work.
- Clients Correspondence.

Site Manager Erection & Installation في Quality Maker Co, Ltd.
  • المملكة العربية السعودية - جدة
  • مارس 2012 إلى نوفمبر 2015

Erection & Installation work complete in my Supervision:
- Oversee installation crew members and independent contractors
- Visit work sites to audit processes
- Monitor use of materials and labor
- Work with clients to resolve installation issues
- Ensure installations are completed on time and to code
- Preparation of all relevant documentation prior to the commencement of the installation phase of contracts, including but not limited to:
o Site Management Plans
o Risk Assessments and Method Statements for activities being undertaken by directly employed resources
- Reviewing and approval of subcontractors site documentation including but not limited to:
o Risk Assessments and Method Statements
o Installation programs
o Test and Inspection documentation
- Management and control of all site activities ensuring that all work is undertaken in a safe and timely manner in accordance with all Safety, Health and Environmental legislation, procedures and all relevant contractual timescales and all relevant contract specifications.
- Liaison with the clients engineering and operational staff to ensure all KPIs are met or exceeded.
- To work alongside the Contract Engineers and Planner to regularly review the progress of the works ensuring that adherence to the contract programs dates are maintained. This will include the preparation and maintenance of fortnightly look ahead programs.
- To undertake Site Inductions and regular Tool Box Talks for all resources visiting and working on the site.
- Promoting Near Miss, Positive Intervention and Non Conformance reporting
- Strong leadership with employees and sub-contractors on site
- Ensure that site costs are monitored and controlled.
- Uploading documents to Company systems as and when necessary in line with business requirements
- Preparation of progress reports as required.
- Attendance at site visits / meetings.
- Coordination and liaison with suppliers, specialist sub-contractors, in-house functions, site installation and construction teams.
- Preparation of plant and material requisitions

Project Engineer – VDSL في RMS (Ibrahim Al Asmawi Est.)
  • المملكة العربية السعودية - جدة
  • أكتوبر 2011 إلى ديسمبر 2011

- Conducted survey for VDSL Cabinet installation of 33 Sites in “Jizan, KSA”
- Coordination with contractor
- Arrangement of Permit to work (PTW)
- Site management and VDSL Cabinets storage
- Management of cabinets installation on sites
- Preparing fortnight reports of survey

Network Engineer في Spectators
  • باكستان - كراتشي
  • أغسطس 2008 إلى مارس 2011

- Maintaining 150 end user and 4 servers including web server (Apache), data base server (SQL Server) and active directory.
- Implementing Cisco router 2800 series and Layer 2 Switches.
- Implemented and maintenance CCTV cameras.
- Fault tolerance and troubleshooting of network associated problems.
- Used Wireshark for network performance management.
- Hand on experience on Link tester, Fujikura for fiber optical splicing and jointing.
- Preparing fortnight and monthly reports as per requirement.
- Frequently visited branch offices for network related works.

الخلفية التعليمية

بكالوريوس, Computer Science
  • في Newports Institute Of Communications And Economics
  • ديسمبر 2024

- Network Management. - Network Security and Audit. - Computer Architecture and organization. - Database management system.

دبلوم, Electronics
  • في Zubaida Polytechnic Institute
  • أغسطس 2024

Specialties & Skills

ISO 9001 2015 Documentation
Communications
Management
Site Planning
Work Planning
MS Office
ADOBE ILLUSTRATOR
APP STORE (IOS)
AUTOCAD
CERTIFIED COMPUTER PROGRAMMER
JAVA (PROGRAMMING LANGUAGE)
MANAGEMENT
OPERATIONS
OPTICAL FIBER
QUALITY MANAGEMENT
AutoCAD

اللغات

الانجليزية
متمرّس
العربية
متوسط
الأوردو
اللغة الأم

التدريب و الشهادات

AutoCAD (تدريب)
معهد التدريب:
DigiSkills, Virtual University
تاريخ الدورة:
November 2022
المدة:
22 ساعة
ISO 9001-2015 Quality Management System Auditor / Lead Auditor (الشهادة)
تاريخ الدورة:
December 2018
Cisco Networking Academy® Cybersecurity Essentials (الشهادة)
تاريخ الدورة:
December 2022

الهوايات

  • Swimming