عاطف حسين, Sr. Planning & Controls Engineer

عاطف حسين

Sr. Planning & Controls Engineer

IHCC (Saudi German Hospital)

البلد
المملكة العربية السعودية - جدة
التعليم
ماجستير, MBA
الخبرات
12 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :12 years, 11 أشهر

Sr. Planning & Controls Engineer في IHCC (Saudi German Hospital)
  • المملكة العربية السعودية - جدة
  • أشغل هذه الوظيفة منذ أبريل 2016

PROFESSIONAL ACHIEVEMENTS
• Spearheaded the development and management of portfolio-level dashboards (Power BI), effectively analyzing projects progress and presenting key insights to the management.
• Strategically formulated and successfully obtained approvals for cost claims totaling approximately SR 30 million, contributing to enhanced projects financial management.
• Attained approval for time extension cases on more than 10 occasions.
• In response to the challenges posed by the COVID-19 pandemic, strategized and successfully initiated Time and Cost Claim processes to mitigate company losses.
• Implemented value-engineering methodologies to achieve target budgets, demonstrating a proactive approach to cost-effective project execution.
• Led the formulation of technical proposals for bidding projects.
• IHCC's attainment of IMS certification, serving as the project manager during the rigorous certification process.
• Earned recognition as an approved Planning Engineer by prominent industry consultants, including SAK, ZFP, Red Sea, and Al-ID Engineering.
• Key Responsibilities:
o Developed projects monitoring systems and complied projects report for management in form of Dynamic KPI Dash boards by using Power BI.
o Preparing and updating EPC Detailed Baseline Schedules, Recovery Schedules & Revised Schedules of projects up-to level-4 (Resource and Cost Loaded). Establishing work break-down structure (WBS), Assigning activities codes to controls the cost and sub-contractor packages.
o Preparing resources mobilization and demobilization plan.
o Synchronized subcontractors schedule with EPC Baseline schedule, and review their update, giving feedback and ensure their implementation.
o Co-Ordinate and follow-ups with all disciplines of Engineering, Procurement and Construction stockholders to implement their agreed action plan and deadlines.
o Interfaces with clients, attending regular meetings, and providing statistical reports.
o Prepared and Agreed on budget of each BOQ items and indirect cost of project with all stakeholder to manage Cost Control.
o Preparing weekly & monthly progress reports as per agreed progress measurement system reporting format (PMIS).
o Monitored and tracked the Budget, Design, Procurement and Construction as per BL Schedule / Recovery Schedule.
o Measuring and presenting project performance by using Earned Value Management Technique.
o Maintaining record of all events which delay the project. Preparing and updating various logs for tracking.
o Delay / Extension of Time Analysis (EOT), Preparing Extension of time based on delaying events.
o Preparing Cost Claims i.e. extended period, suspension of work by client, Redo work.
o Supervising and providing performance reviews for lower-level Project Control Engineer/Specialists and/or support personnel.
o Provides input to Sr. Project Control Staff regarding staffing requirements.
o Organized risk workshop and Executed critical path analysis to identify key project activities and potential bottlenecks.
o Suggested strategic solutions to proactively mitigate schedule risks and potential delays
o Assist project manager for Technical letters drafting & Correspondence.
o Ensure that project controls documents fully developed by the designated personnel, reviewed by Construction Management.
o Leading the Technical bid submission of external client’s projects; (like Sabic, Royal Commission, KAEC)

Planning Engineer في RAJEH H AL-MARRI & SONS COMPANY (KSA)
  • المملكة العربية السعودية - الخبر
  • أكتوبر 2013 إلى أبريل 2016

Handling the role of Planner / Scheduler professional of the project for timely monitoring & reporting of the project. Furthermore, got the opportunity to know and learn the project management & controlling systems of one of the big organization of the world. Handled the following projects

1. HARADH Satellite Fields Construction, Contract No.:6600032500 (SAUDI ARAMCO)
2. BI 10-00168; SHAYBAH NGL Pipeline (Seg.1, 2, 3 total Pipeline 633 KM). (SAUDI ARAMCO)


Prepared the schedules of projects up-to level-4 project, tracking the progress of the project by preparing (Weekly, Monthly, etc) progress reports.

Tracking the Procurement as per the requirement for construction.

Implement the work schedule and monitor progress of the work for timely execution of the project through daily/weekly/monthly/ reports with respect to review of the overall project.

Preparation of S-Curves for Planned Vs Achieved Targets & Presentation and analysis of slips in Targeted works

Junior Planning Engineer في ENGINEERING KINETICS (Pvt.) LIMITED (PAKISTAN)
  • باكستان - لاهور
  • يونيو 2012 إلى نوفمبر 2013

Scheduling, monitoring and reporting of the ongoing projects on Primavera P6.
Monitoring and ensuring the progress of running project according Raising invoices against Planned Progress and keeping updated status of all invoices.
Preparing the BOQ, BBS and Rough estimation of the engineering materials.
Executed Projects:
Construction of waste water treatment plant. (A project of Philip MorrisPakistan Limited)
Construction of OUTFALL Channel & Allied Infra-Structure at CHASHMA.

Assistant Quantity Surveyor في Zealcon Engineering (Pvt.) Limited
  • باكستان - لاهور
  • أغسطس 2011 إلى مايو 2012

Prepare the bill of quantities of structural work.
Making sub-contractors bills.
To supervise construction and related works.
Making Bar Bending schedules

Internee في Descon Engineering Limited
  • باكستان - لاهور
  • يونيو 2011 إلى أغسطس 2011

Worked in Planning Department and submitted the Project (assignment) which containing Planning, Scheduling and sources of multi storey building by using Primavera 3.

الخلفية التعليمية

ماجستير, MBA
  • في University Of The People
  • يناير 2023
بكالوريوس, Civil Engineering
  • في University of engineering and technology Lahore
  • يونيو 2012

In the university i got the peef Scholarships,and at the end of 3rd year of Graduation i had completed my internship from Descon Enginnering Limited.

دبلوم, Fsc
  • في Central College of Commerce and Science
  • يونيو 2007

University of Engineering & Technology Lahore, Pakistan.

Specialties & Skills

Project Planning
Project Management
Primavera
Microsoft Excel
On Site
AUTOCAD
Primavera P6.0 v 20.12
Project Management
COORIDNATOR
Power BI
• Collaboration
• Resource Scheduling
• Adaptability

اللغات

الانجليزية
متمرّس
الأوردو
اللغة الأم

العضويات

PMI
  • Literature review
  • January 2020

التدريب و الشهادات

PMP (الشهادة)
تاريخ الدورة:
January 2020
PMP (الشهادة)
تاريخ الدورة:
January 2020
PMP (الشهادة)
تاريخ الدورة:
January 2020
Primavera P6 (تدريب)
معهد التدريب:
Pakistan Engineering Congress
تاريخ الدورة:
November 2012
المدة:
90 ساعة
Internal Audit (تدريب)
معهد التدريب:
FAHSS
تاريخ الدورة:
October 2016
المدة:
16 ساعة
PMP (الشهادة)
تاريخ الدورة:
August 2017

الهوايات

  • Playing & Watching Cricket