PROJECT: TTM Evacuation Project (Upstream-Greenfield)
Location: CPOC Platform, Thailand
- Responsible for engineering matter, drawing issuance, workpack and jobcard preparation by Contractor.
- Monitor all work completed with proper reporting (daily progress report, inspection report, check sheets, etc) and ensure work complete within time frame.
- Involve of installation of Jacket and Topside include pre-commissioning and commission of pipe laying from pig launcher to target box.
- To ensure all punchlists closed by Contractor before handover to Platform Operation.
- To achieve Mechanical Completion Date ahead of schedule during construction before sail-away.
- To assist the project quality assurance and quality control of construction team for the assigned project and proposals. This includes quality record, report, material samples and presentation materials are produced and kept in systematic order and secured.
- Preparation of offshore installation procedure, evaluation of vendor data based on client specifications, prepare of E & I material take off and monitoring E & I materials.
- Involvement and supervision on the hook up and commissioning, prepare of installation check sheet and final documentation.
- Review and update resources allocation such as manpower, test equipment, tools, consumables, and spares throughout construction period & employ cost control for project efficiency.
- Involving in the review of report, standards and other requirements related to construction activities such as QA/QC report, WPS, WQT, progress report, NDT report etc
- Supervising daily construction work progress as per planned & scheduling, planning of manpower, estimation of materials, tools, and equipments. Ensuring that the work activities are in safe condition at all times.
- Reviewing and commenting on documentation prepared by Contractor e.g. procedures, drawings, technical reports etc. Ensuring the implementation of established procedures and good engineering practice.
- Conduct Construction Readiness Assessment (CRA) at Contractor fabrication yard.
- Participate on governance activities on Constructability Review (CR), HAZID, HAZOP, PDMS Review, Commissioning Risk Assessment and etc.
- Involve in integrate team for commissioning activities involve all stakeholders.
- Assisting to ensure the safest and most cost effective methods of construction during project installation in accordance to HSE Management System and Site HSE Plan.
- Assigned as technical responsibility for on-site fabrication and providing technical input during fabrication
- Ensuring and monitoring of quality compliance and verification of Contractor schedule and progress in terms of construction throughout the execution of construction activities.
- As a Company Site Representative (CSR) to supervise Jacket and Topside Installation during Offshore Installation Campaign to ensure Contractor doing the right way and follow the planning schedule.
- Working under extreme schedules and safety pressure (i.e. zero fatality, zero LTI and incident free targets) in an environment with a lot of constraints like Permit To Work (PTW) but still required to meet deadlines and targets.
- Coordinator with Construction/Operations on all aspects related to the offshore/onshore scope of work.
- Company industry:
- Oil & Gas
- Job role:
-
Oil and Gas