مجموع سنوات الخبرة :11 years, 6 أشهر

Planning Engineer في Falcon Eye Technology LLC
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ يناير 2017

Projects
1. ELV Package for Warner Bros. Theme Park
2. CCTV Package for Zukum Oil Field
3. PIDS Package for Abu Dhabi International Airport

• To Gather the Requirements of the Project from Various Stake Holder along with Project Manager
• To Prepare the Completion Plan/Schedule for the Under Taken Work.
• To Prepare the KPI for Monitoring Over All progress
• To Prepare & Update Engineering Drawing & Material Procurement LOG.
• To Prepare the Weekly & 6 Week Look Ahead Plan.
• To monitor the Daily Progress & Report to Project Manager.
• To Send Weekly, Monthly Report to the Client & Higher Management.
• Updating & Monitoring the Project Schedule with respect to Baseline and Intimating Construction Managers about the performance of Critical Path on Weekly Basis.
• Closely monitoring overall project execution for ensuring timely completion.
• Preparing Risk Register & Monitoring Risk reporting to Project Manager.
• Preparing Delay Analysis for Claims

Planning Engineer في Power Mech Projects Ltd
  • الهند
  • أبريل 2016 إلى ديسمبر 2016

Project - 2x660 MW Super Critical Boiler Suratgarh

Scope- Erection Testing Commissioning of 2 x 660mw Boiler ( BTG Package )

• Site Survey in field to observe Evaluate facilities to collect data & measurements
• Daily Progress Monitored & Updated
• Prepared Protocols for alignments & Hand over as per client’s standard
• Follow-up and continuous Monitor of material inward as per erection sequence / requirement.
• Supervisory of on-going fit-up & erection of pipe as per drawing.
• Material inventory & Record tracking of received materials.
• Effective resource utilization i.e. timely feeding the material & Equipment to reduce man hour loss.
• Highlighting all site issues, Technical Queries to Management & Follow-up same
• Deft in preparing control documents for Planning & Costing activities related to Construction
• Preparation of Job Work books from the Project Scope of work.
• Prepared BOQ from Drawings and Material Reservation against Individual Work Oder Number
• Prepared & managed the project Schedule from Project Start to Project Finish.
o Scope
o Duration/Time
o Machinery
o Manpower
o Material / Procurement
o Communications
• Updating & Monitoring the Project Schedule and Intimating Construction Managers about the performance of Critical Path on Weekly Basis.
• Closely monitored overall project execution for ensuring timely completion.
• Planned daily job for supervisory level as per work front availability.
• Created site related technical queries for client.
• Supervised and investigated progress of all activities on daily basis.
• Preparade Method of Statements & Safety Procedures for Each Jobs.
• Prepared Delay Analysis for Claims
• Prepared Extra Work Claims.
• Reviewing Subcontractors Claims for Work Done

Trainee في National Power Training Institute
  • الهند
  • فبراير 2015 إلى فبراير 2016

• Power Plant Familiarisation.
• Single & Combined Cycle Plant Working.
• Functioning of Power Plant Equipment and parts.
• Various path of operation like Regenerative, Feed, Steam, Air, Flue Paths.
• Functioning of various Heat Exchangers & its Importance.
• Cooling of Heat Exchangers with ACW, DM Water & oil - importance & difference.
• Maintenance and Troubleshooting Procedure for Power Plant Equipment.
• Operational Procedures for various Pressure part & Static Equipment.
• Valve Types & Working procedures.
• Functioning, working procedure and Precaution of safe operation of Instrument’s & Electrical Equipment items.
• Scheme tracing for 1 month at Neyveli TPS-2, 7x210 MW, Tamil Nadu.
• Rotational on-job Training for 2 months at Neyveli TPS-2, 7x210 MW, Tamil Nadu.
• 15 days Stimulator Training regarding OPERATION of Thermal Power Plant at NPTI-Nagpur, Maharashtra.
• 2 day industrial visit to North Chennai Thermal Power Station UNIT# 1 210 MW, Tamil Nadu.
• 1 day visit to STATE LOAD DISPATCH CENTER - Chennai, Tamil Nadu.

Planning Engineer في POWER MECH PROJECTS LTD
  • الهند
  • أكتوبر 2012 إلى فبراير 2015

Title-
Construction of Thermal Power Plant- 6 x 660MW Sasan UMPP

Scope- 1. Structural Package Erection of Power House & Bunker
2. Erection Testing Commissioning of Coal Handling Plant

• Site Survey in field to observe Evaluate facilities to collect data & measurements
• Daily Progress Monitored & Updated
• Prepared Protocols for alignments & Hand over as per client’s standard
• Follow-up and continuous Monitor of material inward as per erection sequence / requirement.
• Supervisory of on-going fit-up & erection of pipe as per drawing.
• Material inventory & Record tracking of received materials.
• Effective resource utilization i.e. timely feeding the material & Equipment to reduce man hour loss.
• Highlighting all site issues, Technical Queries to Management & Follow-up same
• Deft in preparing control documents for Planning & Costing activities related to Construction
• Preparation of Job Work books from the Project Scope of work.
• Prepared BOQ from Drawings and Material Reservation against Individual Work Oder Number
• Prepared & managed the project Schedule from Project Start to Project Finish.
o Scope
o Duration/Time
o Machinery
o Manpower
o Material / Procurement
o Communications
• Updating & Monitoring the Project Schedule and Intimating Construction Managers about the performance of Critical Path on Weekly Basis.
• Closely monitored overall project execution for ensuring timely completion.
• Planned daily job for supervisory level as per work front availability.
• Created site related technical queries for client.
• Supervised and investigated progress of all activities on daily basis.
• Preparade Method of Statements & Safety Procedures for Each Jobs.
• Prepared Delay Analysis for Claims
• Prepared Extra Work Claims.
• Reviewing Subcontractors Claims for Work Done

الخلفية التعليمية

دبلوم عالي, Thermal Power Plant Engineering
  • في National Power Training Institute
  • فبراير 2016

National Power Training Institute trains Engineering Graduate for Operation & Maintenance work in Thermal Power Plant

بكالوريوس, Mechanical
  • في Annamalai University
  • مايو 2012

Specialties & Skills

Controling
Power Plants
Primavera P6
Site Planning
CUSTOMER RELATIONS
INVENTORY MANAGEMENT
MATERIALS MANAGEMENT
PROCUREMENT
PROGRESS
PROTOCOLS
REPORTS

اللغات

الانجليزية
متمرّس
الهندية
اللغة الأم
التاميلية
اللغة الأم

العضويات

PROJECT MANAGEMENT INSTITUTE
  • LEARNER
  • November 2017

التدريب و الشهادات

Microsoft Office Specialist (الشهادة)
تاريخ الدورة:
February 2014
Earned Value Management (تدريب)
معهد التدريب:
3 Fold Institute
تاريخ الدورة:
November 2017
المدة:
2 ساعتين
Applied Project Management (تدريب)
معهد التدريب:
3 Fold Institute
تاريخ الدورة:
November 2017
المدة:
40 ساعة
Primavera Foundation (تدريب)
معهد التدريب:
Soft Projects
تاريخ الدورة:
February 2014
المدة:
40 ساعة
Project Management Professional (الشهادة)
تاريخ الدورة:
October 2018
صالحة لغاية:
October 2021
Course on Primavere Advance (تدريب)
معهد التدريب:
Synergy School of Business Skills
تاريخ الدورة:
November 2018
المدة:
40 ساعة