baden cuanang, Project Controller

baden cuanang

Project Controller

Norconsult Telematics

البلد
المملكة العربية السعودية - الرياض
التعليم
بكالوريوس, Industrial Technology
الخبرات
23 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :23 years, 6 أشهر

Project Controller في Norconsult Telematics
  • المملكة العربية السعودية - الرياض
  • مارس 2010 إلى أغسطس 2020

Project: Saudi Telecom Company - MSAN, FTTM and FTTH Projects
•Responsible in MSAN project control reports, documentation and monitoring in accordance with the project requirements and standards.
•Lead the development of methods and procedures to cover project planning, Project cost estimating, project cost control, and project budget preparation and getting it approved by the management.
•Developing and administering all project cost and commercial functions ensuring that all project reporting, cash flow, budgets and forecasts comply with the client requirements.
•Estimating, planning, auditing and cost planning activities as necessary.
•Manage End to End MSAN project for Execution from Scope issuance until invoicing.
•Manage all integrated system to insure the correct and validated data update and work processes flow on all relevant system ( ISOW, NPTS, NFTS etc).
•Manage day-to-day operational aspects of project and scopes.

Project Coordinator في SWEDTEL ARABIA
  • المملكة العربية السعودية - الرياض
  • مايو 2006 إلى فبراير 2010

Project: Saudi Telecom Company - MSAN, FTTM and FTTH Projects.
•Responsible in MSAN project control reports, documentation and monitoring in accordance with the project requirements and standards.
•Lead the development of methods and procedures to cover project planning, Project cost estimating, project cost control, and project budget preparation and getting it approved by the management.
•Developing and administering all project cost and commercial functions ensuring that all project reporting, cash flow, budgets and forecasts comply with the client requirements.
•Estimating, planning, auditing and cost planning activities as necessary.
•Manage End to End MSAN project for Execution from Scope issuance until invoicing.
•Manage all integrated system to insure the correct and validated data update and work processes flow on all relevant system ( ISOW, NPTS, NFTS etc).
•Manage day-to-day operational aspects of project and scopes.

Telecommunications في Digital
  • الفلبين
  • يناير 2000 إلى يناير 2006
Telecom Technician في ETSI TECHNOLOGIES, INC
  • الفلبين
  • يناير 1996 إلى يناير 1999

OSP Site survey, Splicing, Cut-over works.
•Site inspection of installed cabinets (Primary and Secondary Cable)
•Testing and Commissioning of Fiber Cable using OTDR
•Fiber Splicing using Arc Fusion Machine
•Prepare materials requisition and materials consumption report
•Perform schedule monitoring and accomplishment report
•Prepares proposal for variations with design changes
•Coordinates field activities with scope and design changes
•Supervises Acceptance Tests
•Provides documentation for handover

الخلفية التعليمية

بكالوريوس, Industrial Technology
  • في Mariano Marcos State University
  • أبريل 1995

EDUCATIONAL BACKGROUND: Graduate of Bachelor of Science in Industrial Technology from Mariano Marcos State University Field of Specialization: Electronics and Telecommunications Date Graduated: April 1995

بكالوريوس, Electronics and Telecommunications
  • في Mariano Marcos State University
  • أبريل 1995

EDUCATIONAL BACKGROUND: Graduate of Bachelor of Science in Industrial Technology from Mariano Marcos State University Field of Specialization: Electronics and Telecommunications Date Graduated: April 1995

Specialties & Skills

Telecommunications
AUDITING
BUDGET PREPARATION
BUDGETING
CASH FLOW
COST CONTROL
CUSTOMER RELATIONS
DOCUMENTATION
ESTIMATING
INVOICING
PROCESS ENGINEERING

اللغات

الانجليزية
متوسط

العضويات

Saudi Council of Engineers
  • Telecom Engineer Profession
  • October 2009

التدريب و الشهادات

Occupational Safety and Health (تدريب)
معهد التدريب:
Safeways Consultancy and Safety Services
تاريخ الدورة:
February 2006
المدة:
72 ساعة
Construction Safety Training (تدريب)
معهد التدريب:
Occupational Safety and Health Center - Philippines
تاريخ الدورة:
February 2006
المدة:
72 ساعة
Basic OSP and Fiber Optic Splicing (تدريب)
معهد التدريب:
Digital Telecommunications Philippines
تاريخ الدورة:
January 2002
المدة:
72 ساعة