Application Engineer
FAWAZ Trading & Engineering Services Co.
مجموع سنوات الخبرة :12 years, 8 أشهر
* Design of Clean Agent Inert Gas (IG541) Fire Suppression System
* Design of Clean Agent (HFC227ea) Fire Suppression System
* Design of Foam Deluge System (Ordinary/Bladder Tank) for Diesel Generators, Rooms and Helipad
* Design of Water Spray System for Transformers
* Coordinating with Suppliers
* Stock Material Planning & Procurement
* Ordering materials with B2B
* Tracking shipments
* Coordinating with Supply Chain Department for timely deliveries
* Coordination with Clients for other scopes & revision of design if required
* Cross checking the design with estimated project values
* Handled various prestigious KNPC, KOC, MEW & Ministries Projects
* Co-ordination with site engineers
* Arrangement of material from stores as well as local sources for project execution
* Sales Order, Purchase Requisitions, Fixed Asset Requests etc.
* KFF Submission of design & reply to comments
* Site Survey for the system installation feasibility.
* Meeting KFF officials and explaining the design.
* Preparing Technical Submittals for Fire Fighting Equipment’s & Specialties.
* Making specifications compliance sheets for Fire Fighting items.
* Replying to the consultant comments.
* Software: AutoCAD 2021, Microsoft Dynamics V10.0.22, Elite Fire 6.02.34, NAFFCO HFC 227ea Flow Calc. 4.0, Microsoft Office, Foxit Phantom PDF etc.
Estimation for the tender based on project design drawings, schedule and specifications.
Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates.
Making request for approval of new brands from Kuwait Fire Service Directorate.
Technical Support for the MEP products.
Fire Pump Calculation by Elite software.
Design of Foam Deluge System (Ordinary/Bladder Tank) for Diesel Generators, Rooms and Helipad.
Design of Clean Agent Fire Suppression System.
Design of Water Spray System for Transformers.
Knowledge of various NFPA codes.
Site Survey for the system installation feasibility.
Meeting KFD officials and explaining the design.
Preparing Technical Submittals for Firefighting, Plumbing & HVAC Equipment’s & Specialties.
Making specifications Compliance sheets for Firefighting, Plumbing and HVAC items.
Replying to the consultant comments.
Plumbing Calculations based on Plumbing Codes.
Selection of right product based on capacity and specifications for MEP.
Maintains project data base by writing computer programs; entering and backing up data.
Cooperate and communicate effectively with project manager and other project participants to provide assistance and technical support.
Responsible for 3lac Sqft. area of Cognizant Technology Solutions Pvt Ltd. at Quadron Business Park Ltd. in Hinjewadi, Pune.
Maintaining day to day operations of facilities according to code 001 policy.
OHSAS audit preparation.
Daily dashboard with all equipment parameter details.
Preparation of Daily Data Source for tracking daily electrical consumption.
Preparing monthly MMR.
HIRA preparation and implementation of Safe Practices.
Implementation of 5S concepts within the facility.
Energy Saving Initiatives in terms of lighting modifications, switching off unnecessary lights in off working hours etc.
Ensuring strong ethical standards at client location while working.
Ensuring every vendor activity with safe work procedures.
Service Level Agreements targets on 5lac Sqft area site.
Assistance in providing comprehensive facility, contract and procurement management for technical services to the client.
Preventive maintenance programs at (Client) with highest standards and ensure energy conservation practices.
Support the Assistant Manager-Engineering in managing the Mechanical, Electrical, Plumbing installations & all civil maintenance within the facility.
Responsible for preparation of critical spares list for all installations as per manufacturer’s recommendations and plan for the inventory where the maintenance is carried out with in-house teams.
Energy Bills Confirmation to PM and Processing of the same to Central Team.
Implement and oversee the pre-emptive maintenance programme to reduce the risk of sudden failures of critical equipment.
Maintain the logbooks, checklists and PPM schedules for all M & E installations.
Ensure the contractors follow the house rules at all times and the projects are handled with minimum inconvenience to the client.
Daily Facility Rounds to ensure the System and M&E Equipments working smoothly.
Maintenance of HVAC systems, Air Handling Units, Package and Precision AC units, UPS systems, ACBs in co-ordination with vendors.
Knowledge of Building Management System, VAV, VFD, Fire Protection System, Hydrant System, Sprinkler System, Safety Systems, MCP, Smoke Detectors, Fire Indicators etc.
Site Supervision.
Making Snag List for taking clearance from Project Team.
Co-ordination with the Project Team for Fire Testing, Lift integration, Inventory Checking, Snag List clearance etc.
All issues related to the facility and concerned vendors are being circulated to get the action plan.
Monthly meetings with the vendors/LL and documentation of MOM to easily track completion of the activities.
B.E. Mechanical