Resident Engineer / Client Representative
Sidra Architrecural & Engineering Consultancy - Part of The Sidr
Total years of experience :19 years, 7 Months
Project: The Esplanade Commercial Development - Phase 1 - Shopping Centre
Client: Muzoon Holding - Part of The Sidra Group
Value: 117, 000, 000 AED
Main Responsibilities:
• Represent Client.
• Project management.
• Review Work Progress and ensure all activities within approved Work Program.
• Managing and evaluate works quality of the Consultant and the Contractor.
• Follow up Client office requirements.
• Review and certify both of the Consultant and Contractor payments.
• Review and valuate submitted variations
• Review submitted documents by the Contractor after Consultant review and ensure they are in line with Project Manual Procedure and Contract Documents.
June 2019 - Present
Project Manager
Jouizy An Axianta Consultant Engineers, Dubai -UAE
July 2020 - Present
Project: Hatta Pumped Storage Hydro Power Plant
Client: DEWA
Value: 1.9 Billion AED
Main Responsibilities:
• Provide supervision services and ensure work execution inline with authorities approved drawings and regulations for excavation and construction of Two Dams, Powerhouse, Administration Buildings, Access Tunnels, Hydro Tunnel and Roads.
• Ensure all works in line with HSE requirements, regulations, and safety plan for excavation and construction of Two Dams, Powerhouse, Administration Buildings, Access Tunnels, Hydro Tunnel and Roads.
• Follow up with Design Office and ensure that all required approved drawings, documents as well as authorities’ approval have been obtained before starting the related work activities.
June 2019 - May 2020
Project: Construction and Maintenance of Chilled Water Networks in Seven Locations within Dubai Region, including NDRC works.
Client: EMPOWER
Value: 49, 000, 000 AED
Main Responsibilities:
• Project management.
• Coordinate with RTA and related Authorities within ROW.
• Coordinate with END User for EMPOWER service.
• Review Work Progress and ensure all activities within approved Work Program.
• Managing and evaluate works quality of the Contractor.
• Follow up Client office requirements.
• Review and certify Contractor payments.
• Review and valuate submitted variations.
• Review submitted documents by the Contractor after Consultant review and ensure they are in line with Project Manual Procedure and Contract Documents.
April 2015 - November 2017
Resident Engineer
Project:
10 NEW ENOC Filling Stations In Dubai (Entry & Exits Roads).
Client:
ENOC ( Emirates Nation Oil Company )
Main Responsibilities:
• Responsibilities include monitor project of each station from design stage, follow up with client requirements, NOC’s with Authorities, and follow up Traffic Impact Study (TIS) with design team and Roads and Transportation Authorities (RTA), submitting tenders documents.
• Monitor and supervise, all site activities, Progress, Quality, new activities, HSE.
• Monitor and supervise, all related services relocation and protection required to be done during roads construction.
April 2014 - March 2015
Resident Engineer:
Project: Services Relocation Expansion - Relocation Of Utility Services At Emirates Flight Catering - Link Bridge And Screening Building - Dubai Airport.
Client: Emirates Flight Catering.
Responsibilities:
• Responsibilities include monitor project quality, Safety and program, and ensure that works are done as per approved quality procedure, method statement and ITP coordinate with MEP engineers, follow up subcontractors and insure all required documents are approved before starting any activity, follow up relocation for all underground services with subcontractor and authorities like 11KV and LV cables, IT and telecom fiber optic and copper cables, water, sewerage, sewerage pressure and storm-water lines and their manholes, generator relocation, fire alarm and internal and external firefighting network relocation.
• Follow up the Clients Requirements.
• Monitor and supervise, all site activities, Progress, Quality, new activities, HSE.
• Evaluation and Certify Contractor and subcontractors’ payments and Variation Requests.
• Review all submissions like materials, shop drawings, ITP's, Method statements, and subcontractors and ensure that all submission are in line with Contract Documents and Authorities.
Senior Civil Project Engineer
Project: Phase (1)
ADNOC New Corporate Headquarters, Abu Dhabi, UAE
Construction (2B+75 Tower) including 5 service floors.
Phase (2)
Under Ground Multi Story Car Parking (3B).
Phase (3)
6000 Tons capacity District Cooling Building (B+G)
Client: ADNOC ( Abu Dhabi National Oil Company )
Value: AED 1, 000, 000, 000 ( Headquarter Project)
AED 219, 000, 000 ( Car Parking Project )
AED 80, 000, 000 (District Cooling Building)
Responsibilities:
• Responsibilities include monitor project quality activities, and insure that works are done as per approved quality procedure, method statement and ITP coordinate with MEP engineers, follow up subcontractors and insure all required documents are approved before starting any activity, follow up relocation for all underground services with subcontractor and authorities like 11KV and LV cables, 132 KV cables, fiber optic cables, water lines and sewer and storm water lines and their manholes.
• Follow up with the Clients Requirements.
• Monitor and supervise, all site activities, Progress, Quality, new activities, HSE.
• Daily reporting to the Construction Manager all activities, progress, quality and safety issues by submitting Daily Site Audit form.
• Supervise services relocation subcontractors like 132KV lines, 11KV and low voltage lines, water lines, sewerage lines, storm water lines and fiber optic lines.
• Supervising and follow enabling works like shoring (secant Piles), excavation and piles works.
• Follow up Steel Structure 1400 MT Building Crown and Heli Pad.
Supervisor
Project: Married Staff Accommodation in Ruwais ADNOC Housing, West Abu Dhabi, UAE
21 \{Buildings (G+5)\} + Infrastructure (Roads, MEP Services, 2 District Coolant Buildings, Chilled water pipes and 2 Substation buildings)
Client: ADNOC (Abu Dhabi National Oil Company)
Value: AED 350, 000, 000
Responsibilities:
• Responsibilities include site NIGHT activities, like Buildings structure, finishing, coordinate with MEP engineers, follow up subcontractors as well as Infrastructure works (roads, MEP services car parking) related to these buildings.
• Follow up with the Clients Requirements.
• Monitor and supervise, all site activities, Progress, Quality, new activities, HSE issues during night duty.
• Daily reporting to the Construction Supervisor and Construction Manager all night activities, progress, quality and safety issues.
Resident Engineer / Assistant Senior Projects Manager
Projects: Construction of 3 Bus Stations: -
(a) AL Satwa Bus Station: 3B+G+M+2
(b) Al Qouz Bus Station: 2B+G+M+2
(c) Al Karama Bus Station: B+G+M+2
Client: RTA (Road & Transportation Authority)
Value: AED 300, 000, 000
Responsibilities:
• Responsibilities include site activities.
• Follow up with the Clients Requirements.
• Follow up with Authorities.
• Review and approved materials, suppliers, subcontractors and shop drawings.
• Report to the Projects Manger Progress, Quality, new activities…. Ect.
• Review Work Program, updated Work Program, Weekly and monthly Reports
2B Shared Basement +3 \{Buildings (G+M+9)\}
Client: Dubai Municipality
Value: AED 300, 000, 000
Responsibilities:
• Responsibilities include site activities, like cast in situ
structure, Steel structure canopy and 2 bridges between the
three buildings, finishing, coordinate with MEP engineers and
monitor site inspectors’ activities and quality, follow up
subcontractors and report to the Senior Resident Engineer.
• Follow up with the Clients Requirements.
• Follow up with Authorities.
• Review and approved materials, suppliers, subcontractors
and shop drawings.
• Report to the Senior Resident Engineer Progress, Quality, new
activities….Ect.
• Review Work Program, updated Work Program, Weekly and
monthly Reports.
Projects: Al Quoz staff accommodation
33 Buildings (G+8) which are divided into packages (21
buildings Precast Structure & 12 buildings Post Tension
Structure)
Client: Dubai Properties
Value: AED 1, 800, 000, 000
Responsibilities:
• Responsibilities include managing site activities, like
structure, finishing, coordinate with MEP engineers, followup
subcontractors.
• Coordinating with third party Consultants and Contractors
regarding Infra structure works like roads, cables, water
supply and drainage pipes and manholes, chilled water pipes
and champers structure cables … ect.
• Follow up with the Clients Requirements.
• Follow up with Authorities.
Resident Engineer
Projects:
• TECOM Mosque (Client: Dubai Properties).
• Al Salam Mosque (Client: EMAAR)
• Al Green Mosque (Client: EMAAR)
• Four Complex Villas (Client: Dubai Development Board)
• Private Villa (Client: Dr. Rahdi Al Hillo)
Responsibilities:
• Responsibilities include site activities, like structure, finishing, coordinate with MEP engineers, follow up subcontractors.
• Follow up with the Clients Requirements.
Follow up with Authorities.
• Review and approved materials, suppliers, subcontractors and shop drawings.
Structure Supervisor (Part-time)
Project: Al Yousify Twin Towers (G+3 parks +22), Sharjah
Value: AED 80, 000, 000
Responsibilities include site activities, like post tension slaps and beams and Slip form works.
Assistant Resident Engineer
Project: Multi-storey Car Parking (Precast Structure) for Dubai Media City (DMC) - (B+G+4) - (Precast Structure) Building, 1520 car parking.
Client: Dubai Properties
Value: AED 64, 000, 000
Responsibilities:
• Responsibilities include site activities, like make site inspection for piles and piles cups works, pre-cast structure, hollow core slabs and pre-cast cladding.
• Review, comment and approved shop drawings, Materials and subcontractors.
• Certify payment for the Contractor.
Campbell Reith Hill International Ltd., Consulting Engineers, UAE
Project Engineer
Project: Steel Structure Warehouse for Chemical tanks and offices building for Selvochem Co. in Jabel Ali Free Zone
Responsibilities:
• Responsibilities include site activities, like make site inspection; following up main contractor and sub-contractors works and improve quality control for 1500 Cubic meter underground water tank under the offices building as well as open shade steel structure warehouse for chemical tanks.
Project Engineer
Project: Ministry of Public Works and Housing
(B+G+4) Building
Value: AED 45, 000, 000
Responsibilities:
• Responsibilities include site activities, like make site inspection, following up main contractor and sub-contractors works and ensuring the quality control for the finishing items like:
• Marble, ceramic.
• False ceiling.
• Demountable partitions.
• Aluminum cladding, aluminum works, curtain walls, spider system.
• Marble & Stone cladding.
Projects: G+1 Villa.
Radar section building for Dubai Police.
Showroom for Abd Alaziz Alshaya in Port Saeed
included handling all site activities.