Project Enumerator
World Vision
Total years of experience :15 years, 6 Months
• Focus on fighting begging and bullying towards children and avoiding sexual exploitation.
• Engage in treating refugees with respect without any special financial or sexual goals
• Engaging with individuals or groups to gather information, often requiring effective communication and active listening skills.
• Accurately recording responses, observations, or data points using designated tools or technology.
• Ensuring the accuracy and completeness of collected data, often through periodic checks
• Efficiently managing time and schedules to meet data collection targets and deadlines.
• Maintaining records, logs, or reports related to the data collection process, including any issues or challenges encountered.
• Flexibility to work in various environments, including different locations or with diverse populations.
• Providing regular updates or reports to supervisors or project managers regarding progress, challenges, and any deviations from the established procedures.
• Supervised over 20 labors in wooden factory to manufacturing and producing plywood (contreplaque).
• Operated the cutting and peeling wood machines.
• Identified areas for process enhancement, implemented strategies to increase efficiency, and reduced production bottlenecks.
• Ensured a safe working environment, adhering to safety regulations, and promoting a culture of safety among the production team.
• Supervised and motivated production staff, provided guidance, training, and resolved conflicts to maintain a productive workforce.
• Monitored inventory levels, coordinated with procurement or logistics teams to manage stock levels, and minimizing wastage.
• Managed and Maintained the registration of all project technical documentation and correspondence (incoming/outgoing) into the SharePoint, issue transmittal and letters to subcontractors, engineer, client and sites.
• Maintained a master document register of the latest drawings on the project and ensure that all recipients are transmitted the drawings they require as soon as new revisions of drawings are received and Ensure that the latest revision and approval status of drawings is kept updated continuously.
• Filed and archived documentation to facilitate easy retrieval at a later date.
• Issued authorized documents in a consistent format in accordance with the document control procedures and ensured that latest revisions of all DOCs/DWGs are distributed as per the matrix.
• Generated weekly overdue documents list based on documents status and distributes it to project management team in order to expedite the critical items.
• Coordinated with contractors & subcontractor’s document control centers to ensure that company corporate systems are implemented.
• Develop and implement document control procedures and processes.
• Oversee the creation, review, revision, and approval of documents to maintain accuracy and compliance.
• Establish and maintain a centralized document repository for easy access and retrieval.
• Categorize and organize documents based on content and relevance.
• Implement version control measures to track and manage document revisions.
• Ensure that all stakeholders are working with the latest versions of documents.
• Ensure timely retrieval of documents as needed for internal and external purposes.
• Conduct regular audits to ensure document accuracy, completeness, and adherence to organizational standards.
• Supervised a Technical Team for PWHT and Hardness Test.
• Requested the required Joints for tests.
• Made a good control in the Quality Control department. • Managed the PWHT documents (post weld & heat treatment) in KGP.
• Updated the data using Talisman System.
• Data Management, Controlling all CCC Documents using Primavera for Data Management Systems.
I have achieved my degree in Business Administration and majoring in Accounting.