Lead Engineer
Gulf Steel works
مجموع سنوات الخبرة :15 years, 7 أشهر
Interaction with the EPC / Consultant for obtaining the Basic design & Engineering Input.
Design of detailed System Architecture and Network Architecture.
Preparation of I/O Assignment and Termination List
Preparing FDS and FAT Procedures, Interconnection Diagram & Single Line Diagram
I/O Module Loading and Network Architecture
Preparation of Cable Schedule, Heat Dissipation and Power Calculation.
Coordinating for ordering Hardware materials, Software packages and Finalizing Bought-out Make & Model.
Monitor the implementation & commissioning of Automation Systems both in-house and at clients’ end; conduct tests to ensure operational efficiencies of equipment.
Discuss project status/ review during the course of periodic project review meetings.
Preparation of change orders under the scope of the project.
Obtaining Approvals for Engineering Documents from Customer / Consultants.
Brief about the Company: From being primarily a provider of Process Automation Systems and Products, Yokogawa India Limited (YIL) is today positioned as a Comprehensive Solutions Provider of Enterprise Technology Solutions (ETS). Established in 1987, Yokogawa India has created the state of art global engineering centre and manufacturing centre in Bangalore.
Project Summary - Yokogawa
Working in ESD/RTU SYSTEM FOR GAS MODULAR SKID
Interaction with the EPC / Consultant for obtaining the Basic design & Engineering Input.
Design of detailed System Architecture and Network Architecture.
Preparation of I/O Assignment and Termination List
Preparing FDS and FAT Procedures, Interconnection Diagram & Single Line Diagram
I/O Module Loading and Network Architecture
Preparation of Cable Schedule, Heat Dissipation and Power Calculation.
Field Bus Segment Validation both for IS/NIS using tools.
Coordinating for ordering Hardware materials, Software packages and Finalizing Bought-out Make & Model.
Monitor the implementation & commissioning of Automation Systems both in-house and at clients’ end; conduct tests to ensure operational efficiencies of equipment.
Discuss project status/ review during the course of periodic project review meetings.
Preparation of change orders under the scope of the project.
Obtaining Approvals for Engineering Documents from Customer / Consultants.
Project Title:- TAKREER Carbon Black & Delayed Coker Project, Abu Dhabi Duration:- June 2013 - April
Co-ordination and Communication with Client during Design phase.
DCS System Architecture generation & detailed engineering of DCS system.
IO Database Generation.
Panel Engineering.
Power Distribution Plan.
Power Consumption and Heat Dissipation Calculation.
Factory Acceptance Test
Project Title:- Kharir Power plant / CCU Extension, Total E&P Yemen
DCS System Architecture generation & detailed engineering of DCS system.
IO Database Generation.
Panel Engineering.
Power Distribution Plan.
Power Consumption and Heat Dissipation Calculation.
Factory Acceptance Test
Brief about the Company: Bharat Petroleum Corporation Limited is an Indian state-controlled oil and gas company
Headquartered in Mumbai, Maharashtra. The Corporation operates two large refineries of the country located at Mumbai
And Kochi.
BPCL- Kochi Refinery
Design Engineering
Conduct Study & Detail Engineering for Automation and Process control for Oil & gas industries using Yokogawa DCS & PLC.
Design of detailed System Architecture and Network Architecture.
Prepare Project Manuals; conduct tests & inspections for assessing any deviations and make relevant modifications for final installation.
Having Technical Clarification meetings with Sales & Customer.
Preparation of KOM and related documents.
Installation, Calibration and troubleshooting of Monitoring & Control instruments.
Knowledge about field instruments & its sensors for measuring Pressure, Flow, Level, Temperature and Differential Pressure and its field installation.
Project Planning
Conceptualize project execution plans after thorough discussion with clients.
Establish time span & schedules of project Engineering, FAT and site execution as per client specifics.
List down the resource needs for projects, after considering the budgetary parameters set.
Estimating and Procuring the Control system Products as well as third party items.
Project Execution
Interaction with the
Worked in TAKREER Carbon Black & Delayed Coker Project
Co-ordination and Communication with Client during Design phase.
DCS System Architecture generation & detailed engineering of DCS system.
IO Database Generation.
Panel Engineering.
Power Distribution Plan.
Power Consumption and Heat Dissipation Calculation.
Factory Acceptance Test
Site Installation & Commissioning
Project Title:- ADCO Qusahwira Full Field Development Project, Abu Dhabi