• Ensure site to follow project specifications, drawings and BOQ.
• Ensure that shop drawing under controlled conditions as per design drawings, method statements, specification and work plan.
• Report to the structural engineer any technical problem in the project.
• Request steel bar material with BBS sheet.
• Control the use of material and avoid damages and waste.
• Prepare invoice to main-contractors.
• Prepare As Built Drawing as per technical document and per installed in site.
As Field Engineer :
Indonesia Steel Mill Project Stage 1 at Cilegon, Indonesia, largest Steel Mill at South Asia, Sinter Plant Area:
• Sinter Plant contains: Sinter Machine Building, Main Control Room, Storage Tank Building, Gas Stack, Cold Screen, Coke Electrical Room, Sub Electrical Room, etc.
• Ensure Quantity material as accordance drawing standard
• Ensure Quality implementation of project
• Analyze schedule of project according reality
• Monitor the status and actual cost for labors, equipment, and subcontractors
• Review all cluster direct costs/expenses posted on a daily basis
• Analyze project expenses by trade and compare it to budget
• Analyze material purchase orders compared to budget as part of the review process for the monthly reports
• Monitor the status and actual cost for labors, equipment, and subcontractors
As Site Manager :
• SPBG (Gas Station for Vehicle Fuel) Project on Palembang City, South Sumatera, Indonesia. This project contains Compressor room, steel stucture for roof, rigid pavement 150 m x 30 m, mini pile foundation.
• Plans and directs activities concerned with development, application, and maintenance of quality standards for industrial processes, materials, and products: Develops and initiates standards and methods for inspection, testing, and evaluation.
• Monitor and controll of project management during project process.
• Monitor Quality and Quantity of project throughout the process
As Site Manager :
• Produce estimation Bill of Quantity and Bill of Material
• Review contract document so it can be profitable
• Ensure Quantity and Quality of civil work from sub-contractor for Rehabilitation of Parangtritis Area, Held by Bantul Government, Jogjakarta, This project contains increasing backfill soil until 4 m heigh of bak fill, make footing foundation, and bulid market above thath backfill.
As Civil Mechanical Electrical (CME) Engineer :
• Conduct Technical Site Survey to determine the best site for CME
• Ensure Quality of CME work during CME Process, begin Soil Test/Hammer Test, Foundation planning design, excavation, bacfill, shelter room, Steel Tower erection, Electrical installing, and Ready for Commissioning.
• Ensure to all sub-contractor to be on schedule progress, and on quality standard.
a. As Civil Mechanical Electrical Engineer and Controller :
• Control and arrange schedule project with Motorola.
• Make documentations project and do the ATP (Acceptance Test Protocol) Tower project.
• Herewith Project Manager assistant solve foundation work problems especially foundation in wet soil, in peat moss, in marsh, in rooftop of building.
b.As Transmission Planner :
• Conduct Survey, Hunting and Tracking to determine appropriate site for Telkomsel BTS in Kalimantan
• Conduct Los Survey to determine appropriate Height, Bearing and Frequency of Microwave (MW) antenna for Telkomsel BTS Network at Kalimantan.
• Make Site Survey Report (SSR) documentation of site hunting and Technical Site Survey Result.
• As Supervisor staff for foundation work in B2 and ME Satelindo Building, Jl. Daan Mogot, October 2003
Project -“ B2 and ME PT. Satelindo Building Construction”.
• Medan Mall Bridge Design Assistant, October 2003
Project -“ Medan Mall Bridge Construction“.
• Roof Top Tower Design for CV. Jasa Utama for Satelindo Tower Project RO 2003 and RO 2004, from November 2003 - March 2004
Site Involve : Pekalongan, Bandung dan Cirebon
Work description : - Base frame tower design.
- Site Survey and then coordination with PT. Satelindo,
Jl. Daan Mogot, Jakarta
• Foundation tower design of Satelindo Tower Project RO 2003 and RO 2004 for PT. Kopnatel Jaya and PT. Rekapranata Ciptatangguh, from October 2003 — March 2004
Project -“ Outsourcing Site Implementation, Roll Out 2003 and Roll Out 2004 PT. Satelindo to cover20 site”
Work description : - Foundation tower design of foot plate, Raft foundation, Bore Pile.
• Warehouse with crane addition design assistant, November 2003
Project -“ Ware House With Crane Addition Construction “.
• Luxurious House 2 story design, January 2004
Work description : Design of luxurious house with ETABS