Burak Börekçi, Mechanical Chief

Burak Börekçi

Mechanical Chief

Saudi Arabian Baytur

Location
Saudi Arabia - Riyadh
Education
Master's degree, Occupational Healty and Safety
Experience
12 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :12 years, 6 Months

Mechanical Chief at Saudi Arabian Baytur
  • Saudi Arabia - Riyadh
  • My current job since October 2022

MY DUTIES
➢Preparing online work tracker list by using google excel sheets and following the remaining works
➢Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢Quality and technical control of the materials arriving at the construction site.
➢Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
*Carrying out end-of-project testing and commissioning works.
➢Analyzing all MEP drawings and determining the materials required for the project, then making the presentation
➢Preparing monthly project reports and forward to project manager for review and later for management submission
➢Preparing technical requires such as, details, missing documents
➢Compile proposals including estimates and technical submittals as required.
➢ Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
local & international standard codes and progressing in the project time line.
➢Coordinating all electro-mechanical activities with various team on site
➢ Attending weekly and monthly meeting along with consultant and main-subcontractors.
➢ Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢Monitoring the project closely and getting information from concerned departments
➢Preparation of Redline drawing for the site installation to make AS-Built drawing
➢ Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Rising WIR of site MEP works for consultant approval
➢ Trying to solve the problems I encounter at worksite
➢Assigning daily tasks to teams to increase work efficiency
➢Preparation of BOQ as per the drawing and site condition.
➢Attending Consultant/authority inspections as per the project schedule.
MY PROJECT
PIF TOWER
➢HVAC SYSTEM INSTALLATION
➢SANITARY SYSTEM INSTALLATION
➢ FIREFIGHTING SYSTEM INSTALLATION
➢ CHILLED LINE SYSTEM INSTALLATION
MISK SCHOOL CAMPUS PROJECT
➢ INFRASTRUCTURE WORKS
➢PRV STATTION INSTALLATION
➢FIRE WATER NETWORK INSTALLATION
➢FIRE HYDRANT AND FIRE HOSE CABINET INSTALLATION
➢ CHILLED WATER NETWORK INSTALLATION
➢ SEWER AND STORM WATER NETWORK INSTALLATION
➢ IRRIGATION WATER NETWORK INSTALLATION
➢INCOMING WATER NETWORK INSTALLATION

Mechanical Construction Chief at MECON ELECTROMECHANİC
  • Türkiye - Mersin
  • March 2022 to September 2022

I worked as a Mechanical Construction Chief in the AKKUYU NUCLEAR POWER PLANT

MY DUTIES
➢Preparing online work tracker list by using google excel sheets and following the remaining works
➢Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢Quality and technical control of the materials arriving at the construction site.
➢Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
*Carrying out end-of-project testing and commissioning works.
➢Analyzing all MEP drawings and determining the materials required for the project, then making the presentation
➢Preparing monthly project reports and forward to project manager for review and later for management submission
➢Preparing technical requires such as, details, missing documents
➢Compile proposals including estimates and technical submittals as required.
➢ Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
local & international standard codes and progressing in the project time line.
➢Coordinating all electro-mechanical activities with various team on site
➢ Attending weekly and monthly meeting along with consultant and main-subcontractors.
➢ Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢Monitoring the project closely and getting information from concerned departments
➢Preparation of Redline drawing for the site installation to make AS-Built drawing
➢ Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Rising WIR of site MEP works for consultant approval
➢ Trying to solve the problems I encounter at worksite
➢Assigning daily tasks to teams to increase work efficiency
➢Preparation of BOQ as per the drawing and site condition.
➢Attending Consultant/authority inspections as per the project schedule.
MY PROJECT
➢ FIRE FIGHTING AND SPRINKLER SYSTEM AND PUMP STATION INSTALLATION
➢PUMP STATION INSTALLATION AT THE PORT
➢ SEA-WATER DESALINATION PLANT
➢ THE WAREHOUSE 1
FIRE FIGTHTING SYSTEM, SPRINKLER SYSTEM, HVAC SYSTEM, VRFSYSTEM, PLUMBING SYSTEM
➢WAREHOUSE 2
FIRE FIGTHTING SYSTEM, SPRINKLER SYSTEM, HVAC SYSTEM, VRFSYSTEM, PLUMBING SYSTEM
➢THE WORKSHOP BUILDING MECHANICAL WORKS
HVAC SYSTEM, VRF SYSTEM, PLUMBING SYSTEM
➢ CAMPOUTS FOR LABORERS
VRF SYSTEM, HVAC SYSTEM PLUMBING SYSTEM
➢MANAGENMENT OFFICE MECHANICAL WORKS
HVAC SYSTEM, VRF SYSTEM, PLUMBING SYSTEM

Mechanical Construction Chief at Turgut Firat Cons.
  • Türkiye - Adana
  • May 2021 to March 2022

Job Definition: I worked as the Mechanical Construction Chief at the European UnionSchools Project
MY DUTIES
➢Preparing online work tracker list by using google excel sheets and following the remaining works
➢Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢Quality and technical control of the materials arriving at the construction site.
➢Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
*Carrying out end-of-project testing and commissioning works.
➢Analyzing all MEP drawings and determining the materials required for the project, then making the presentation
➢Preparing monthly project reports and forward to project manager for review and later for management submission
➢Preparing technical requires such as, details, missing documents
➢Compile proposals including estimates and technical submittals as required.
➢ Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
local & international standard codes and progressing in the project time line.
➢Coordinating all electro-mechanical activities with various team on site
➢ Attending weekly and monthly meeting along with consultant and main-subcontractors.
➢ Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢Monitoring the project closely and getting information from concerned departments
➢Preparation of Redline drawing for the site installation to make AS-Built drawing
➢ Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Rising WIR of site MEP works for consultant approval
➢ Trying to solve the problems I encounter at worksite
➢Assigning daily tasks to teams to increase work efficiency
➢Preparation of BOQ as per the drawing and site condition.
➢Attending Consultant/authority inspections as per the project schedule.
MY PROJECT
➢BUHARA PRIMARY SCHOOL CUKUROVA/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ SEMERKANT PRIMARY SCHOOL YUREGIR/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ SAVAS KALE PRIMARY SCHOOL SEYHAN/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ CUMHURIYET PROMARY SCHOOL CEYHAN/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ HIGH SCOOL MECANICAL WORKS OSMANIYE
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ YENISEHIR PRIMARY SCHOOL YENISEHIR/MERSIN
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ 700. PRIMARY SCHOOL TOROSLAR/MERSIN
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ HASAN AKEL HIGH SCHOOL TOROSLAR/MERSIN
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ NIHAL ERDEM HIGH SCHOOL TOROSLAR/MERSIN (VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM,
SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )

Mechanical Consultant Engineer at TUMAS – TURKISH ENGINEERING CONSULTING & CONTRACTING CO / TURKEY
  • Türkiye - Adana
  • October 2018 to April 2021

Title: Mechanical Consultant Chief
Job Definition: I worked as the Mechanical Consultant Chief at the European Union Schools Project
MY DUTIES
➢ Preparing online work tracker list by using google excel sheets and following the remaining works
➢ Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢ Quality and technical control of the materials arriving at the construction site.
➢ Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢ Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
➢Carrying out end-of-project testing and commissioning works.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Prepare monthly project reports and forward to project manager for review and later for management submission
➢ Compile proposals including estimates and technical submittals as required.
➢Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢ Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
local & international standard codes and progressing in the project time line.
➢Coordinating all electro-mechanical activities with various team on site
➢Attending weekly and monthly meeting along with main-subcontractors.
➢Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢ Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢Monitoring the project closely and getting information from concerned departments
➢Preparation of Redline drawing for the site installation to make AS-Built drawing
➢Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Trying to solve the problems I encounter at worksite
MY PROJECT
➢ HUZUREVLER PRIMARY SCHOOL ÇUKUROVA/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM
INSTALLATIONS )
➢ SAKIRPASA PRIMARY SCHOOL SEYHAN /ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM
INSTALLATIONS )
➢ YUREGIR PRIMARY SCHOOL YUREGIR/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM
INSTALLATIONS )

Mechanical Construction Chief at Burak Cons.
  • Türkiye - Adana
  • October 2016 to December 2018

Title: Mechanical Construction Chief
Job Definition: I worked as a Mechanical Construction Chief.
MY DUTIES
➢ Preparing online work tracker list by using google excel sheets and following the remaining works
➢Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢Quality and technical control of the materials arriving at the construction site.
➢Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
➢Carrying out end-of-project testing and commissioning works.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Prepare monthly project reports and forward to project manager for review and later for management submission
➢ Preparing technical requires such as, details, missing documents
➢ Compile proposals including estimates and technical submittals as required.
➢Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢ Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
➢ Coordinating all electro-mechanical activities with various team on site
➢ Attending weekly and monthly meeting along with consultant and main-subcontractors.
➢ Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢ Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢ Monitoring the project closely and getting information from concerned departments
➢ Preparation of Redline drawing for the site installation to make AS-Built drawing
➢Preparing weekly and monthly report
➢Attending all testing & commissioning of MEP services
➢Rising WIR of site MEP works for consultant approval
➢ Trying to solve the problems I encounter at worksite
➢ Assigning daily tasks to teams to increase work efficiency
➢Preparation of BOQ as per the drawing and site condition.
➢ Attending Consultant/authority inspections as per the project schedule.
MY PROJECT
➢ NATIONAL EDUCATION SARKIYA SCHOOL HEATING SYSTEM
CONSTRUCTION MERSIN
➢ADANA CAT SERVICE ROOF REPAIR AND VENTILATION SYSTEM
CONSTRUCTION MERSIN
➢ TURKEY JOKEY CLUB REPAIR WORKS SEYHAN/ADANA

Mechanical Consultant Engineer at ARTI CONSULTING & CONTRACTING CO / TURKEY
  • Türkiye - Adana
  • December 2017 to October 2018

Title: Mechanical Consultant Chief
Job Definition: I worked as the Mechanical Consultant Chief at the European Union Schools Project
MY DUTIES
➢ Preparing online work tracker list by using google excel sheets and following the remaining works
➢ Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢ Quality and technical control of the materials arriving at the construction site.
➢ Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢ Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
➢Carrying out end-of-project testing and commissioning works.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Prepare monthly project reports and forward to project manager for review and later for management submission
➢ Compile proposals including estimates and technical submittals as required.
➢Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢ Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
local & international standard codes and progressing in the project time line.
➢Coordinating all electro-mechanical activities with various team on site
➢Attending weekly and monthly meeting along with main-subcontractors.
➢Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢ Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢Monitoring the project closely and getting information from concerned departments
➢Preparation of Redline drawing for the site installation to make AS-Built drawing
➢Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Trying to solve the problems I encounter at worksite
MY PROJECT
➢ ULUBEY PRIMARY SCHOOL SARIÇAM/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATION )
➢ CAFER RECAI GIZER PRIMARY SCHOOL SEYHAN/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATION )
➢ BAHCELIEVLER PRIMARY SCHOOL YUREGIR /ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATION )
➢ CUMHURIYET PRIMARY SCHOOL YUREGIR/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATION )
➢ KASGARLI MAHMUT PRIMARY SCHOOL YUREGIR /ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATION )
➢ KARATAS MERKEZ PRIMARY SCHOOL KARATAS /ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATION )
➢ TUZLA HIGH SCHOOL KARATAS/ ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATION )
➢ TUZLA PRIMARY SCHOOL KARATAS /ADANA

Mechanical Construction Chief at SASEL ELECTROMECHANİC
  • Republic of Congo - Brazzaville
  • June 2015 to October 2016

Title: Mechanical Construction Chief
Job Definition: I worked as a Mechanical Construction Chief.
MY DUTIES
➢Preparing online work tracker list by using google excel sheets and following the remaining works
➢Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢Quality and technical control of the materials arriving at the construction site.
➢Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
*Carrying out end-of-project testing and commissioning works.
➢Analyzing all MEP drawings and determining the materials required for the project, then making the presentation
➢Preparing monthly project reports and forward to project manager for review and later for management submission
➢Preparing technical requires such as, details, missing documents
➢Compile proposals including estimates and technical submittals as required.
➢ Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
local & international standard codes and progressing in the project time line.
➢Coordinating all electro-mechanical activities with various team on site
➢ Attending weekly and monthly meeting along with consultant and main-subcontractors.
➢ Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢Monitoring the project closely and getting information from concerned departments
➢Preparation of Redline drawing for the site installation to make AS-Built drawing
➢ Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Rising WIR of site MEP works for consultant approval
➢ Trying to solve the problems I encounter at worksite
➢Assigning daily tasks to teams to increase work efficiency
➢Preparation of BOQ as per the drawing and site condition.
➢Attending Consultant/authority inspections as per the project schedule.
MY PROJECT
➢RADISSON BLU M’BAMOU PALACE HOTEL 5 STAR BRAZZAVILLE / CONGO
➢ RADISSON BLU M’BAMOU PALACE SPA BRAZZAVILLE / CONGO
➢RADISSON BLU M’BAMOU PALACE BALLROOM BRAZZAVILLE / CONGO
➢RADISSON BLU M’BAMOU PALACE PAILLOTE BRAZZAVILLE / CONGO

Mechanical Site Chief at KIPAS ELECTROMECHANİC
  • Turkmenistan - Ashgabat
  • February 2014 to June 2015

Title: Mechanical Site Chief
Job Definition: I worked as a Mechanical Site Chief
MY DUTIES
➢Preparing online work tracker list by using google excel sheets and following the remaining works
➢Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢Quality and technical control of the materials arriving at the construction site.
➢Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
*Carrying out end-of-project testing and commissioning works.
➢Analyzing all MEP drawings and determining the materials required for the project, then making the presentation
➢Preparing monthly project reports and forward to project manager for review and later for management submission
➢Preparing technical requires such as, details, missing documents
➢Compile proposals including estimates and technical submittals as required.
➢ Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
local & international standard codes and progressing in the project time line.
➢Coordinating all electro-mechanical activities with various team on site
➢ Attending weekly and monthly meeting along with consultant and main-subcontractors.
➢ Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢Monitoring the project closely and getting information from concerned departments
➢Preparation of Redline drawing for the site installation to make AS-Built drawing
➢ Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Rising WIR of site MEP works for consultant approval
➢ Trying to solve the problems I encounter at worksite
➢Assigning daily tasks to teams to increase work efficiency
➢Preparation of BOQ as per the drawing and site condition.
➢Attending Consultant/authority inspections as per the project schedule.
MY PROJECT
➢ASHGABAT OLYMPICS WATER SPORTS SWIMMING POOLS COMPLEX FACILITY
ASHGABAT/TÜRKMENISTAN
➢ ASHGABAT OLYMPICS SPORTS HOTELS ASHGABAT/TURKMENISTAN

Mechanical Site Engineer at Yesil Engineering Cons.
  • Türkiye - Adana
  • June 2013 to February 2014

Job Definition: I worked as a Mechanical Site Engineer.
MY DUTIES:
➢ Monitoring the project closely and getting information from concerned departments
➢ Preparation of Redline drawing for the site installation to make AS-Built drawing
➢ Preparing weekly and monthly report
➢Attending all testing & commissioning of MEP services
➢Rising WIR of site MEP works for consultant approval
➢ Analyzing and determining the materials required for the project, then making the presentation
➢Trying to solve the problems I encounter at worksite
➢ Assigning daily tasks to teams to increase work efficiency
➢ Preparation of BOQ as per the drawing and site condition.
➢Attending Consultant/authority inspections as per the project schedule.
➢ Preparing technical requires such as, details, missing documents
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work

MY PROJECT
➢ TADIM FACTORY
FIRE FIGTHTING SYSTEM INSTALLATION, SPRINKLER SYSTEM, HVAC SYSTEM INSTALLATION,
VRF SYSTEM, PLUMBING SYSTEM

Mechanical Site Engineer at BIRLESIM ELECTROMECHANİC
  • Türkiye - Antakya
  • May 2012 to November 2012

Title: Mechanical Site Engineer
Job Definition: I worked as a Mechanical Site Engineer.
MY DUTIES:
➢ Monitoring the project closely and getting information from concerned departments
➢ Preparation of Redline drawing for the site installation to make AS-Built drawing
➢Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Rising WIR of site MEP works for consultant approval
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Trying to solve the problems I encounter at worksite
➢ Assigning daily tasks to teams to increase work efficiency
➢ Preparation of BOQ as per the drawing and site condition.
➢ Attending Consultant/authority inspections as per the project schedule.
➢ Preparing technical requires such as, details, missing documents
➢ Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
MY PROJECT
➢ PALLADIUM MALL HATAY / T U R K E Y
➢THE RESIDENCES AT MANDARİN ORİENTAL OTEL BODRUM / T U R K E Y

Mechanical Site Engineer at Atak Cons.
  • Türkiye - Adana
  • June 2011 to April 2012

Title: Mechanical Site Engineer
Job Definition: I worked as a Mechanical Site Engineer
MY DUTIES:
➢Monitoring the project closely and getting information from concerned departments
➢ Preparation of Redline drawing for the site installation to make AS-Built drawing
➢Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢Rising WIR of site MEP works for consultant approval
➢Analyzing and determining the materials required for the project, then making the presentation
➢Trying to solve the problems I encounter at worksite
➢ Assigning daily tasks to teams to increase work efficiency
➢Preparation of BOQ as per the drawing and site condition.
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
MY PROJECT
➢DSİ. 151. REGION COOLING SYSTEM RENEWAL
➢ GOVERNMENT BUILDINGS WATER TANK AND BOILER PIPES RENEWAL
➢DR.ASKIM TÜFEKÇI HOSPITAL AIR HANDLING UNIT AND FIREFIGHTING SYSTEM
RENEWAL

Education

Master's degree, Occupational Healty and Safety
  • at Cukurova University
  • February 2022
Bachelor's degree, Mechanical Engineering
  • at Gaziantep University
  • June 2011
Bachelor's degree, Mechanical Engineering
  • at University Of West Bohemia
  • June 2011

I was there during Erasmus period

Specialties & Skills

Team Leadership
Mechanical Analysis
Mechanical Engineering
AutoCAD
Solidworks
Production
Analysis for project
Ms office
Autocad
Management
Project Management
Engineering
Microsoft Office
Plumbing
Mechanical Engineering
Installation

Social Profiles

Personal Website
Personal Website

URL removed due to policy violation. Please contact support for further information.


Languages

Arabic
Beginner
English
Expert
Turkish
Native Speaker

Memberships

Association of Mechanical Engineers
  • Mechanical Engineer
  • July 2011

Training and Certifications

Occupational Health and Safety (Training)
Training Institute:
Cukurova University
Duration:
1000 hours

Hobbies

  • chess
  • Swimming
  • Reading