Mechanical Chief
Saudi Arabian Baytur
Total years of experience :12 years, 6 Months
MY DUTIES
➢Preparing online work tracker list by using google excel sheets and following the remaining works
➢Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢Quality and technical control of the materials arriving at the construction site.
➢Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
*Carrying out end-of-project testing and commissioning works.
➢Analyzing all MEP drawings and determining the materials required for the project, then making the presentation
➢Preparing monthly project reports and forward to project manager for review and later for management submission
➢Preparing technical requires such as, details, missing documents
➢Compile proposals including estimates and technical submittals as required.
➢ Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
local & international standard codes and progressing in the project time line.
➢Coordinating all electro-mechanical activities with various team on site
➢ Attending weekly and monthly meeting along with consultant and main-subcontractors.
➢ Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢Monitoring the project closely and getting information from concerned departments
➢Preparation of Redline drawing for the site installation to make AS-Built drawing
➢ Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Rising WIR of site MEP works for consultant approval
➢ Trying to solve the problems I encounter at worksite
➢Assigning daily tasks to teams to increase work efficiency
➢Preparation of BOQ as per the drawing and site condition.
➢Attending Consultant/authority inspections as per the project schedule.
MY PROJECT
PIF TOWER
➢HVAC SYSTEM INSTALLATION
➢SANITARY SYSTEM INSTALLATION
➢ FIREFIGHTING SYSTEM INSTALLATION
➢ CHILLED LINE SYSTEM INSTALLATION
MISK SCHOOL CAMPUS PROJECT
➢ INFRASTRUCTURE WORKS
➢PRV STATTION INSTALLATION
➢FIRE WATER NETWORK INSTALLATION
➢FIRE HYDRANT AND FIRE HOSE CABINET INSTALLATION
➢ CHILLED WATER NETWORK INSTALLATION
➢ SEWER AND STORM WATER NETWORK INSTALLATION
➢ IRRIGATION WATER NETWORK INSTALLATION
➢INCOMING WATER NETWORK INSTALLATION
I worked as a Mechanical Construction Chief in the AKKUYU NUCLEAR POWER PLANT
MY DUTIES
➢Preparing online work tracker list by using google excel sheets and following the remaining works
➢Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢Quality and technical control of the materials arriving at the construction site.
➢Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
*Carrying out end-of-project testing and commissioning works.
➢Analyzing all MEP drawings and determining the materials required for the project, then making the presentation
➢Preparing monthly project reports and forward to project manager for review and later for management submission
➢Preparing technical requires such as, details, missing documents
➢Compile proposals including estimates and technical submittals as required.
➢ Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
local & international standard codes and progressing in the project time line.
➢Coordinating all electro-mechanical activities with various team on site
➢ Attending weekly and monthly meeting along with consultant and main-subcontractors.
➢ Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢Monitoring the project closely and getting information from concerned departments
➢Preparation of Redline drawing for the site installation to make AS-Built drawing
➢ Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Rising WIR of site MEP works for consultant approval
➢ Trying to solve the problems I encounter at worksite
➢Assigning daily tasks to teams to increase work efficiency
➢Preparation of BOQ as per the drawing and site condition.
➢Attending Consultant/authority inspections as per the project schedule.
MY PROJECT
➢ FIRE FIGHTING AND SPRINKLER SYSTEM AND PUMP STATION INSTALLATION
➢PUMP STATION INSTALLATION AT THE PORT
➢ SEA-WATER DESALINATION PLANT
➢ THE WAREHOUSE 1
FIRE FIGTHTING SYSTEM, SPRINKLER SYSTEM, HVAC SYSTEM, VRFSYSTEM, PLUMBING SYSTEM
➢WAREHOUSE 2
FIRE FIGTHTING SYSTEM, SPRINKLER SYSTEM, HVAC SYSTEM, VRFSYSTEM, PLUMBING SYSTEM
➢THE WORKSHOP BUILDING MECHANICAL WORKS
HVAC SYSTEM, VRF SYSTEM, PLUMBING SYSTEM
➢ CAMPOUTS FOR LABORERS
VRF SYSTEM, HVAC SYSTEM PLUMBING SYSTEM
➢MANAGENMENT OFFICE MECHANICAL WORKS
HVAC SYSTEM, VRF SYSTEM, PLUMBING SYSTEM
Job Definition: I worked as the Mechanical Construction Chief at the European UnionSchools Project
MY DUTIES
➢Preparing online work tracker list by using google excel sheets and following the remaining works
➢Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢Quality and technical control of the materials arriving at the construction site.
➢Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
*Carrying out end-of-project testing and commissioning works.
➢Analyzing all MEP drawings and determining the materials required for the project, then making the presentation
➢Preparing monthly project reports and forward to project manager for review and later for management submission
➢Preparing technical requires such as, details, missing documents
➢Compile proposals including estimates and technical submittals as required.
➢ Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
local & international standard codes and progressing in the project time line.
➢Coordinating all electro-mechanical activities with various team on site
➢ Attending weekly and monthly meeting along with consultant and main-subcontractors.
➢ Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢Monitoring the project closely and getting information from concerned departments
➢Preparation of Redline drawing for the site installation to make AS-Built drawing
➢ Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Rising WIR of site MEP works for consultant approval
➢ Trying to solve the problems I encounter at worksite
➢Assigning daily tasks to teams to increase work efficiency
➢Preparation of BOQ as per the drawing and site condition.
➢Attending Consultant/authority inspections as per the project schedule.
MY PROJECT
➢BUHARA PRIMARY SCHOOL CUKUROVA/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ SEMERKANT PRIMARY SCHOOL YUREGIR/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ SAVAS KALE PRIMARY SCHOOL SEYHAN/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ CUMHURIYET PROMARY SCHOOL CEYHAN/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ HIGH SCOOL MECANICAL WORKS OSMANIYE
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ YENISEHIR PRIMARY SCHOOL YENISEHIR/MERSIN
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ 700. PRIMARY SCHOOL TOROSLAR/MERSIN
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ HASAN AKEL HIGH SCHOOL TOROSLAR/MERSIN
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
➢ NIHAL ERDEM HIGH SCHOOL TOROSLAR/MERSIN (VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM,
SANITARY SYSTEM AND HEATING SYSTEM INSTALLATIONS )
Title: Mechanical Consultant Chief
Job Definition: I worked as the Mechanical Consultant Chief at the European Union Schools Project
MY DUTIES
➢ Preparing online work tracker list by using google excel sheets and following the remaining works
➢ Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢ Quality and technical control of the materials arriving at the construction site.
➢ Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢ Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
➢Carrying out end-of-project testing and commissioning works.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Prepare monthly project reports and forward to project manager for review and later for management submission
➢ Compile proposals including estimates and technical submittals as required.
➢Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢ Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
local & international standard codes and progressing in the project time line.
➢Coordinating all electro-mechanical activities with various team on site
➢Attending weekly and monthly meeting along with main-subcontractors.
➢Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢ Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢Monitoring the project closely and getting information from concerned departments
➢Preparation of Redline drawing for the site installation to make AS-Built drawing
➢Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Trying to solve the problems I encounter at worksite
MY PROJECT
➢ HUZUREVLER PRIMARY SCHOOL ÇUKUROVA/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM
INSTALLATIONS )
➢ SAKIRPASA PRIMARY SCHOOL SEYHAN /ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM
INSTALLATIONS )
➢ YUREGIR PRIMARY SCHOOL YUREGIR/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM
INSTALLATIONS )
Title: Mechanical Construction Chief
Job Definition: I worked as a Mechanical Construction Chief.
MY DUTIES
➢ Preparing online work tracker list by using google excel sheets and following the remaining works
➢Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢Quality and technical control of the materials arriving at the construction site.
➢Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
➢Carrying out end-of-project testing and commissioning works.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Prepare monthly project reports and forward to project manager for review and later for management submission
➢ Preparing technical requires such as, details, missing documents
➢ Compile proposals including estimates and technical submittals as required.
➢Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢ Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
➢ Coordinating all electro-mechanical activities with various team on site
➢ Attending weekly and monthly meeting along with consultant and main-subcontractors.
➢ Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢ Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢ Monitoring the project closely and getting information from concerned departments
➢ Preparation of Redline drawing for the site installation to make AS-Built drawing
➢Preparing weekly and monthly report
➢Attending all testing & commissioning of MEP services
➢Rising WIR of site MEP works for consultant approval
➢ Trying to solve the problems I encounter at worksite
➢ Assigning daily tasks to teams to increase work efficiency
➢Preparation of BOQ as per the drawing and site condition.
➢ Attending Consultant/authority inspections as per the project schedule.
MY PROJECT
➢ NATIONAL EDUCATION SARKIYA SCHOOL HEATING SYSTEM
CONSTRUCTION MERSIN
➢ADANA CAT SERVICE ROOF REPAIR AND VENTILATION SYSTEM
CONSTRUCTION MERSIN
➢ TURKEY JOKEY CLUB REPAIR WORKS SEYHAN/ADANA
Title: Mechanical Consultant Chief
Job Definition: I worked as the Mechanical Consultant Chief at the European Union Schools Project
MY DUTIES
➢ Preparing online work tracker list by using google excel sheets and following the remaining works
➢ Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢ Quality and technical control of the materials arriving at the construction site.
➢ Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢ Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
➢Carrying out end-of-project testing and commissioning works.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Prepare monthly project reports and forward to project manager for review and later for management submission
➢ Compile proposals including estimates and technical submittals as required.
➢Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢ Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
local & international standard codes and progressing in the project time line.
➢Coordinating all electro-mechanical activities with various team on site
➢Attending weekly and monthly meeting along with main-subcontractors.
➢Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢ Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢Monitoring the project closely and getting information from concerned departments
➢Preparation of Redline drawing for the site installation to make AS-Built drawing
➢Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Trying to solve the problems I encounter at worksite
MY PROJECT
➢ ULUBEY PRIMARY SCHOOL SARIÇAM/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATION )
➢ CAFER RECAI GIZER PRIMARY SCHOOL SEYHAN/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATION )
➢ BAHCELIEVLER PRIMARY SCHOOL YUREGIR /ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATION )
➢ CUMHURIYET PRIMARY SCHOOL YUREGIR/ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATION )
➢ KASGARLI MAHMUT PRIMARY SCHOOL YUREGIR /ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATION )
➢ KARATAS MERKEZ PRIMARY SCHOOL KARATAS /ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATION )
➢ TUZLA HIGH SCHOOL KARATAS/ ADANA
(VRF SYSTEM, HVAC SYSTEM, PLUMBING SYSTEM, SANITARY SYSTEM AND HEATING SYSTEM INSTALLATION )
➢ TUZLA PRIMARY SCHOOL KARATAS /ADANA
Title: Mechanical Construction Chief
Job Definition: I worked as a Mechanical Construction Chief.
MY DUTIES
➢Preparing online work tracker list by using google excel sheets and following the remaining works
➢Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢Quality and technical control of the materials arriving at the construction site.
➢Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
*Carrying out end-of-project testing and commissioning works.
➢Analyzing all MEP drawings and determining the materials required for the project, then making the presentation
➢Preparing monthly project reports and forward to project manager for review and later for management submission
➢Preparing technical requires such as, details, missing documents
➢Compile proposals including estimates and technical submittals as required.
➢ Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
local & international standard codes and progressing in the project time line.
➢Coordinating all electro-mechanical activities with various team on site
➢ Attending weekly and monthly meeting along with consultant and main-subcontractors.
➢ Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢Monitoring the project closely and getting information from concerned departments
➢Preparation of Redline drawing for the site installation to make AS-Built drawing
➢ Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Rising WIR of site MEP works for consultant approval
➢ Trying to solve the problems I encounter at worksite
➢Assigning daily tasks to teams to increase work efficiency
➢Preparation of BOQ as per the drawing and site condition.
➢Attending Consultant/authority inspections as per the project schedule.
MY PROJECT
➢RADISSON BLU M’BAMOU PALACE HOTEL 5 STAR BRAZZAVILLE / CONGO
➢ RADISSON BLU M’BAMOU PALACE SPA BRAZZAVILLE / CONGO
➢RADISSON BLU M’BAMOU PALACE BALLROOM BRAZZAVILLE / CONGO
➢RADISSON BLU M’BAMOU PALACE PAILLOTE BRAZZAVILLE / CONGO
Title: Mechanical Site Chief
Job Definition: I worked as a Mechanical Site Chief
MY DUTIES
➢Preparing online work tracker list by using google excel sheets and following the remaining works
➢Checking projects and detecting faulty parts.
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Provide accurate and effective document preparation and Preparing technical requires such as, details, missing documents
➢Quality and technical control of the materials arriving at the construction site.
➢Daily monitoring and reporting of the work done at the construction site
➢ Identifying problems that occur or may occur in the worksite and finding solutions (technical / site).
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
*Carrying out end-of-project testing and commissioning works.
➢Analyzing all MEP drawings and determining the materials required for the project, then making the presentation
➢Preparing monthly project reports and forward to project manager for review and later for management submission
➢Preparing technical requires such as, details, missing documents
➢Compile proposals including estimates and technical submittals as required.
➢ Review and analysis all MEP drawing, materials, Schedules/ program of work etc.
➢Plan, Supervise and review the work of employees at site and ensure all the installation are as per the, project specification,
local & international standard codes and progressing in the project time line.
➢Coordinating all electro-mechanical activities with various team on site
➢ Attending weekly and monthly meeting along with consultant and main-subcontractors.
➢ Technical evaluation as to whether the given drawings by technical team can be applied according to the field situation
➢Overall site management including planning, scheduling and execution, periodic reviewing & monitoring the progress of the project.
➢Monitoring the project closely and getting information from concerned departments
➢Preparation of Redline drawing for the site installation to make AS-Built drawing
➢ Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Rising WIR of site MEP works for consultant approval
➢ Trying to solve the problems I encounter at worksite
➢Assigning daily tasks to teams to increase work efficiency
➢Preparation of BOQ as per the drawing and site condition.
➢Attending Consultant/authority inspections as per the project schedule.
MY PROJECT
➢ASHGABAT OLYMPICS WATER SPORTS SWIMMING POOLS COMPLEX FACILITY
ASHGABAT/TÜRKMENISTAN
➢ ASHGABAT OLYMPICS SPORTS HOTELS ASHGABAT/TURKMENISTAN
Job Definition: I worked as a Mechanical Site Engineer.
MY DUTIES:
➢ Monitoring the project closely and getting information from concerned departments
➢ Preparation of Redline drawing for the site installation to make AS-Built drawing
➢ Preparing weekly and monthly report
➢Attending all testing & commissioning of MEP services
➢Rising WIR of site MEP works for consultant approval
➢ Analyzing and determining the materials required for the project, then making the presentation
➢Trying to solve the problems I encounter at worksite
➢ Assigning daily tasks to teams to increase work efficiency
➢ Preparation of BOQ as per the drawing and site condition.
➢Attending Consultant/authority inspections as per the project schedule.
➢ Preparing technical requires such as, details, missing documents
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work
MY PROJECT
➢ TADIM FACTORY
FIRE FIGTHTING SYSTEM INSTALLATION, SPRINKLER SYSTEM, HVAC SYSTEM INSTALLATION,
VRF SYSTEM, PLUMBING SYSTEM
Title: Mechanical Site Engineer
Job Definition: I worked as a Mechanical Site Engineer.
MY DUTIES:
➢ Monitoring the project closely and getting information from concerned departments
➢ Preparation of Redline drawing for the site installation to make AS-Built drawing
➢Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢ Rising WIR of site MEP works for consultant approval
➢ Analyzing and determining the materials required for the project, then making the presentation
➢ Trying to solve the problems I encounter at worksite
➢ Assigning daily tasks to teams to increase work efficiency
➢ Preparation of BOQ as per the drawing and site condition.
➢ Attending Consultant/authority inspections as per the project schedule.
➢ Preparing technical requires such as, details, missing documents
➢ Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
MY PROJECT
➢ PALLADIUM MALL HATAY / T U R K E Y
➢THE RESIDENCES AT MANDARİN ORİENTAL OTEL BODRUM / T U R K E Y
Title: Mechanical Site Engineer
Job Definition: I worked as a Mechanical Site Engineer
MY DUTIES:
➢Monitoring the project closely and getting information from concerned departments
➢ Preparation of Redline drawing for the site installation to make AS-Built drawing
➢Preparing weekly and monthly report
➢ Attending all testing & commissioning of MEP services
➢Rising WIR of site MEP works for consultant approval
➢Analyzing and determining the materials required for the project, then making the presentation
➢Trying to solve the problems I encounter at worksite
➢ Assigning daily tasks to teams to increase work efficiency
➢Preparation of BOQ as per the drawing and site condition.
➢Assigning daily tasks to the teams and constantly monitoring the construction site to ensure efficient work.
MY PROJECT
➢DSİ. 151. REGION COOLING SYSTEM RENEWAL
➢ GOVERNMENT BUILDINGS WATER TANK AND BOILER PIPES RENEWAL
➢DR.ASKIM TÜFEKÇI HOSPITAL AIR HANDLING UNIT AND FIREFIGHTING SYSTEM
RENEWAL
I was there during Erasmus period
URL removed due to policy violation. Please contact support for further information.