كاجري DINCTURK, Corporate Qhse Manager

كاجري DINCTURK

Corporate Qhse Manager

STFA Construction Group

البلد
تركيا - اسطنبول
التعليم
ماجستير, Environmental Engineering
الخبرات
16 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 11 أشهر

Corporate Qhse Manager في STFA Construction Group
  • تركيا - اسطنبول
  • أشغل هذه الوظيفة منذ فبراير 2018

Headquarters

Hse Manager في GAP-Amec Foster Wheeler
  • تركيا - أرضروم
  • أغسطس 2017 إلى يناير 2018

Anagold Copler Sulfide Expansion Project

Hse Manager في Dogus Construction
  • قطر - الدوحة
  • يونيو 2014 إلى يونيو 2017

Al Rayyan Road Project P007 C2
Client: ASHGHAL Public Works Authority, Supervision Consultant: EGIS International, Design Consultant: KEO International
Project Management Consultant: KBR (Kellog Brown and Root)
Main Contractor: Dogus - Onur Joint Venture
Total Cost: 1 Billion $
The Project comprises the construction and upgrade of the section of Rayyan Road from West of Olympic R/A, to West of the New Rayyan R/A at the east end of the scheme, together with the construction and upgrading of associated side roads and service roads. The total length of the improvement scheme is approximately 5.5km plus 6.0km of side roads, associated service roads (approximately 11 km), minor and major junctions and structures.

Hse Manager في Dogus Construction
  • تركيا - اسطنبول
  • فبراير 2012 إلى يونيو 2014

Headquarters
Roles and Responsibilities;
•Established company and project specific HSE management system
•Prepared HSE plans, procedures and instructions
•Prepared Company's Tender HSE proposals and documents.
•Ensured compliance with regulatory and client requirements
•Made periodic project HSE inspections to monitor compliance with HSE procedures
•Prepared and monitored training programs to instruct employees in emergency operations, emergency procedures and safe work practices
•Assessed company personnel and determined training needs in terms of job specialization
•Provided integrated hazard and risk management support
•Planned and performed audits in-house and to subcontractors
•Conducted internal audits of Company's existing projects
•Worked together with quality professionals to integrate management systems (ISO 9001, ISO 14001 and OHSAS 18001)

During the period of duty at Headquarter, assigned as HSE Coordinator for following projects to support temporarily on site;
Konya-Aksehir Highway Project, Konya-Turkey (4 months)
Uskudar-Umraniye-Cekmekoy Metro Line Project, Istanbul-Turkey (6 months)

HSE Coordinator في Dogus Construction
  • تركيا - Sinop
  • مارس 2011 إلى يوليو 2011

Sinop Boyabat Dam and Road Relocations Project
Client: Boyabat Electric Main Contractor: Dogus Construction
Total Cost: 1.2 Billion $
Project was consists of 195 m. batardam, derivation tunnels and approx. 50 km. relocated dam roads.
Roles and Responsibilities;
•Prepared periodic and non-periodic plans and reports related with HSE, including annual, semi-annual/quarterly, monthly and weekly performance indication reports, RM Plans, pollution prevention plans, waste management and minimization plans,
•Prepared of any other plans or reports required for compliance with all HSE laws, regulations, permits and client requirements
•Developed and delivered training to the personnel as required concerning HSE or other regulatory requirements
•Reviewed documents for accuracy and consistency in reporting as well as compliance issues
•Developed correction action plans as necessary
•Negotiated and obtained governmental permits, permit renewals, alterations or amendments
•Interfaced with personnel as needed to insure that inspections requirements are met
•Interfacing with regulatory agencies on inspections and compliance/enforcement issues

Hse Manager في Dogus Construction
  • ليبيا - طرابلس
  • ديسمبر 2009 إلى فبراير 2011

Al-Tahady University Complex Project
Client: ODAC
Main Contractor: Dogus Construction
Total Cost: 650 Million $
Project was consisting of 8 Faculty Buildings, Medical Complex and 5 Services. Buildings were totally 400.000 m2 Building Area and 550.000 m2 Infrastructure.

Hse Engineer في Dogus Construction
  • قطر - الدوحة
  • سبتمبر 2006 إلى سبتمبر 2009

Qatargas Common Lean LNG Berth Phase 6
Client: Qatar Gas
Main Contractor: Fluor Mideast
Total Cost: 150 Million $
Project was consisting of adding a new dock facility for loading lean LNG from LNG tanks. Phase 6 specifically includes a 580 m long LNG Berth 6 Abutment and Tie-in to New Main Breakwater, LNG Loading Platform Block Foundation, Breasting and Mooring Dolphins on Block Foundations catwalks, platforms and ladders, 10 km new jetty road construction.

الخلفية التعليمية

ماجستير, Environmental Engineering
  • في Istanbul Technical University
  • ديسمبر 2017

Suspended due to working abroad.

بكالوريوس, Environmental Engineering
  • في Kocaeli University
  • أغسطس 2006

Specialties & Skills

Management
Safety Audits
Safety Management Systems
MS Windows

اللغات

التركية
اللغة الأم
الانجليزية
متمرّس

العضويات

Institution of Occupational Safety and Health (IOSH)
  • Technician Level Membership
  • October 2010
International Institute of Risk and Safety Management (IIRSM)
  • Associate Membership
  • September 2010

التدريب و الشهادات

OHSAS 18001:2007 Occupational Health and Safety Management System Lead Auditor (الشهادة)
تاريخ الدورة:
December 2015
Environmental Expert, Turkey (الشهادة)
تاريخ الدورة:
March 2011
ISO 14001:2015 Environmental Management System Lead Auditor (الشهادة)
تاريخ الدورة:
December 2015
Health and Safety Expert, Turkey (الشهادة)
تاريخ الدورة:
May 2014
NEBOSH International General Certificate (الشهادة)
تاريخ الدورة:
May 2009