تشيتان تلاتي, QA/QC Engineer

تشيتان تلاتي

QA/QC Engineer

ASTAD Project Management

البلد
قطر - الدوحة
التعليم
بكالوريوس, Civil Engineering QA/QC Manager
الخبرات
27 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :27 years, 2 أشهر

QA/QC Engineer في ASTAD Project Management
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ مايو 2014

 Execute QA/QC initiatives and measures across assigned project(s) ensuring compliance to the QA/QC procedures)
 Assist in coordination and review of all Quality Assurance Plans and Control Procedures, documentation for successful implementation of projects.
 Report the Projects QA/QC status.
 Assist Senior QA/QC Engineer in ensuring the effective implementation of the ASTAD’s requirements, systems, principles and objectives.
 Support the development of projects specific QA/QC procedures, work instructions and templates.
 Assist project process owners and Senior QA/QC Engineer in establishing their delivery processes and procedures.
 Assist project management team(s) and Senior QA/QC Engineer in defining its Quality resource requirements.
 Collaborate in ensuring consistent implementation of ASTAD’s QA/QC requirements.
 Help Senior QA/QC Engineer in the close-out of quality risks in accordance with the risk management system.
 Review, verify and endorse Contractor and Consultant QA/QC Plans, Inspection and Test Plans, and other Project QA/QC Documents.
 Ensure that quality of contractor’s products, services and facilities, are inspected and monitored.
 Participate in performing assessment visits/audits to suppliers and sub-contractors.
 Provide checks of the project’s status of QA/QC implementation.
 Collaborate for scheduling and coordinating internal and external audits.
 Review Contractors and Consultants Audit Reports and follow up for the implementation of the corrective and preventive actions.
 Make recommendations to correct non-compliances and improve operating procedures.
 Assist Senior QA/QC Engineer in providing feedback to the Project Manager and QA/QC Manager, as needed, regarding QA/QC issues that need to be addressed.
 Provide input and support the subcontractor/supplier evaluation processes and monitor subcontractor/supplier performance through continual improvement process.
 Undertake, as necessary, awareness training in the project Quality Management System, procedures and applications and ensure that all Operational staff is trained in accordance with their duties.
 Ensure that all necessary quality records are identified and retained in accordance with ASTAD’s requirements.
 Provide performance data as requested for reporting purposes.
 Assist in the development of QA/QC policies and procedures and ensure that project contract requirements are in line with ASTAD’s Quality requirements, objectives and systems.
 Perform other related duties or assignments as directed

QA/QC Manager (Civil/Structural) في Bouygues Batiment International
  • فرنسا
  • يونيو 2011 إلى أغسطس 2013

QA/QC Manager (Civil/Structural)
Bouygues Batiment International- Doha, Qatar: June 2011 to present
Project /Cost: Qatar Petroleum District Project - Qatari Rial 7 Billion
Consultant: KEO International
Job Description


• The company QA/QC representative and management of the QA/QC team.
• Prepare and update Project Quality Plan
• Report to the QHSE Manager regarding non-compliance of any QA/QC issue..
• Accompany Client representatives for site visit and follow-up on their recommendations.
• Advise the Project Management Committee on suitable QA/QC Objectives and Targets.
• Prepare, review and authorize all internal and subcontractor QA/QC related plan and procedure.
• Provide advice and recommendation to the management on the measures to be taken in the interest of quality assurance including review of method statements to ensure appropriate mitigation measures are implemented prior to execution of work.
• Prepare and authorize standard subcontractor QA/QC requirements and recommend QA/QC classification for subcontractor.
• Define the QA/QC audit and inspection program used to verify compliance and identify any overlooked significant aspect and hazard. Report the finding with recommendation for correction and improvement to the management.
• Perform root cause analysis on non-conformance and ensure follow-up with corrective and preventive action as necessary.
• Issue and review QA/QC Corrective Action Request.
• Review and ensure follow-up of QA/QC complaint.
• Identify QSE training needs and prepare, review and authorize the QA/QC training program for all levels of employee on site.
• Coordinate and provides QA/QC training to internal and sub-contractor staff.
• Approve QA/QC promotional activities used to promote the QA/QC awareness to the workforce.
• Review and authorize QA/QC reports submitted by the QA/QC Team (including monthly and statistical reports)
• Participate in QA/QC Meeting with client and consultant.
Deputy Quality Manager:

Consultant في Construction of Barwa City Phase
  • يونيو 2010 إلى مايو 2011

BILFINGER BERGER - Doha, Qatar: June 2010 to May 2011
Project /Cost: Construction of Barwa City Phase -1. - Qatari Rial 4.6 Billion
Consultant: Maunsell Aecom


Job Description: • Responsible for quality system maintenance.
• Assist the QA/QC manager in drafting and reviewing of the project quality management documentation (Project quality Plan, Management Procedures, ITP's)
• Establish, implement and maintain the ensuring that the project quality system is implemented at all levels within the dedicated area of responsibility.
• Conduct audits, including closing out audit findings, creating audit findings reports and determine proper corrective and preventive action.
• Ensure that corrective and preventive actions established as a result of reviews/investigations, are implemented effectively.
• Initiation of improvements as results of audits.
• Responsible for planning, organizing and managing the overall activities within the dedicated area of responsibility.
• Continuously improving QA/QC quality system requirements. Ensure that the quality of works conforms to the project Specification and the company quality standards.
• Develop the project specific quality plan, inspection and test plans and associated checklists Monitors the implementation of the Project Quality plan through document reconciliation, conducting internal audits and supplier audits and discussion with the site management team.
• Co ordinates and follows up with regard to customer feedback and supplier/sub-contractor's re-assessment.
• Conducts Quality assessments/Audits of the project execution for consistency with the existing Quality management system (ISO 9001:2008), raising non conformances for unintended requirements/products under their function, review and follow up.

Quality Manager (Construction) في AL AHMADIAH AKTOR LLC - DUBAI, U.A.E
  • أكتوبر 2007 إلى أبريل 2010

Quality Manager (Construction)
AL AHMADIAH AKTOR LLC - DUBAI, U.A.E.: October 2007 to April 2010
Project /Cost: B+G+2, American School of Dubai, Dubai, U.A.E. - AED 440 Million
Consultant: Robert Mathew Johnson Marshall
Job Description: • Reports to the head of QA and site project manager and responsible for supervising QC Engineers and inspectors.
• Maintains the corporate quality management system procedures. Reviewing ISO 9001:2000 documentation. Quality manuals, Quality procedures, work instructions and forms.
• Manages the onsite QC engineers for inspection of the permanent works, including delivered materials, in order to verify conformance with the contract quality requirements.
• Manages the site laboratory.
• Provide training to QC Engineers, Inspectors and Site Engineers with respect to quality topics and improvement plans
• Ensure that the quality of works conforms to the project Specification and the company quality standards.
• Assists project staff in the preparation of quality documentations, such as method statements, inspection and test plans and work procedures.
• Develop the project specific quality plan, inspection and test plans and associated checklists Monitors the implementation of the Project Quality plan through document reconciliation, conducting internal audits and supplier audits and discussion with the site management team.
• Ensure that corrective and preventive actions established as a result of reviews/investigations, are implemented effectively.
• Co ordinates and follows up with regard to customer feedback and supplier/sub-contractor's re-assessment.
• Conducts Quality assessments/Audits of the project execution for consistency with the existing Quality management system (ISO 9001:2008), raising non conformances for unintended requirements/products under their function, review and follow up.

Quality Manager في AL AHMADIAH AKTOR LLC - DUBAI, U.A.E
  • الإمارات العربية المتحدة
  • نوفمبر 2009 إلى يناير 2010

Quality Manager
AL AHMADIAH AKTOR LLC - DUBAI, U.A.E.: November 2009 to January 2010
Project/Cost: Dubai Fujairah Freeway Project AED 800 Million
Consultant: DORSCH, ABUDHABI, UAE
Client: Dubai Municipality
Job Description:
• To ensure that the approved QA/QC plan is implemented on project site.
• Preparing the method statement as per project specification requirement.
• To manage QA/QC personnel and ensure that works carried out on site is in accordance to the latest approved documents (drawings, method statement, PQP, QA/QC procedures where required to established effective QA/QC system on the project.
• Coordinate with all relevant Departments in connection with quality matters.
• To ensure effective inspection / testing carried out by the Inspector / Site Engineer / Technician as per the latest approved document such as; drawings, specification, submittals, QA/QC plan.
• To ensure quality records / documents as required by the contract are maintain.
• Assist the Site Engineers in order to resolve the quality related problems.
• To follow up closely the NCR issued and Implementation for its agreed disposition with the Engineer to close out NCR.
• To weekly update the NCR status indicating NCR issued, open and closed.
• To coordinate with the Consultant in order to resolve quality related problems on site.

Quality Manager (Construction) في AKTOR JV -ABU DHABI, U.A.E
  • مايو 2009 إلى نوفمبر 2009

Quality Manager (Construction)
ARABTECH-AKTOR JV -ABU DHABI, U.A.E.: May 2009 to November 2009
Consultant: Cansult Maunsell Aecom- Abu Dhabi, UAE: Project Manager: Flour Middle East
Project /Cost: Cleveland Clinic, Abu Dhabi, U.A.E. - AED 95million
Job Description: • To ensure project quality plan is being implemented on site during the piling construction of the project.
• To ensure via on site audits and monitoring that the piling contractor on site is executing the project with approved inspection and test plans, drawings, materials, qualified staff, manpower, equipment, machineries and tools.
• To ensure the piling contractor is executing the project in compliance with safety rules and regulation, construction specification, standard procedures and method statements.
• Perform routine quality inspection and record any found non compliance by the contractor to ensure that the non conformity procedure is implemented and that non conformity reports are generated, addressed and effectively closed out for any non-conformity identified.
• To ensure that all piling tests are done as per frequency set by the consultant.
• Attending progress meeting with clients, clients representatives, team members and sub consultant to complete the projects assigned.

Project Engineer في Cansult Maunsell Aecom
  • الإمارات العربية المتحدة
  • أبريل 2006 إلى سبتمبر 2007

Project Engineer
Cansult Maunsell Aecom - Dubai, UAE: April 2006 - September 2007
Project / Cost: 2B+G+10 City Hospital, Dubai Healthcare City - AED 235 Million

Job Description: • Coordinating and monitoring the site progress of each job for timely completion.
• Preparation of work program every week to discuss in the meeting with project manager.
• Verifying work schedules and arranging coordination meetings with consultant, main contractors and sub-contractors for technical queries and work approval.
• Maintaining the quality control and assurance of all construction activities till the completion.
• Co-ordination with Consultants for the project for site activities and procurement issues.
• Monitoring construction safety, quality procedures and compliance with specifications, Client requirement / authority regulations.
• Participating in Safety / progress / procurement meetings.
• Co-coordinating client requirements to the Consultant.
• Inspecting overall quality / safety standards of the project.

QA/QC Engineer في Dhabi Contracting Est
  • الإمارات العربية المتحدة
  • يناير 2004 إلى مارس 2006

QA/QC Engineer
Dhabi Contracting Est. - Abu Dhabi, U.A.E: Jan. 2004 to March 2006
Project/Cost: Etisalat T & A Building (3B+G+33) / AED300 Million
Consultant: WS Atkins and Shank land Cox Ltd.

Job Description: • Setting and supervising the implementation of quality standards and testing and inspection as per policies, inspection and test plans, processes and procedures.
• Conducting Inspection of material delivered to site and ensures compliance with submitted items.
• Inspecting workmanship and details in accordance with ITP
• Ensuring quality inspections and hold points are followed and verified as set out in the ITP.
• Continuously monitoring the investigation process to find out the root cause behind any quality problems that arise during the course of the project and directing the implementation of the required corrective actions to overcome these problems.
• Coordinating with QA/QC manager to ensure the proper implementation of plans, systems and procedures.
• Developing action plans and closing NCR raised by design architectural consultant.
• Co ordination of execution of various finishing trades with the consultant regarding inspection.

Procurement Engineer في GEAP International L.L.C
  • الإمارات العربية المتحدة
  • يوليو 2002 إلى ديسمبر 2003

Procurement Engineer
GEAP International L.L.C. - Dubai, UAE: July 2002 to Dec. 2003
Job Description: • Develop and Implement purchasing policies and procedures.
• Analyze market and delivery systems in order to assess present and future material availability.
• Inspection and quality control of venders.
• Expediting and monitoring procurement activities.

Project Engineer في SSANGYONG ENGG. & CONST
  • الإمارات العربية المتحدة
  • يوليو 2000 إلى ديسمبر 2001

Project Engineer
SSANGYONG ENGG. & CONST. - Dubai, UAE: July 2000 to Dec. 2001
Project / Cost: Grand Hyatt Hotel / 2 Billion AED
Consultant: Architeknik International
Job Description: • Preparation and executing weekly and monthly programs.
• Control on supervision staff for execution of works, maintaining project QA/QC (ISO 9000), and Health, safety and Environment standards.
• Coordination with consultant for the inspection of all activities.
• Maintaining quality standards as per project specifications.
• Preparation of bar bending schedule.
• Planning and procurement of raw material.
• Coordination with all Engineering disciplines involved in the work and maintaining relation and communication with operation staff on project related matters.

Site Engineer and QA/QC Inspector في ENERGOPROJEKT MIDDLE EAST
  • الإمارات العربية المتحدة
  • يناير 1999 إلى يونيو 2000

Site Engineer and QA/QC Inspector
ENERGOPROJEKT MIDDLE EAST, Dubai: Jan. 1999 to June 2000
Project / Cost: Etisalat (B+G+13stories) / AED 90 Million
Job Description: • Responsible for all setting out, in process surveys and finally surveying of the as built conditions.
• Carryout site inspections to verify the quality and quantity of work done as per specification and Drawing.
• Coordinate with MEP Services contractor and the consultants regarding inspections.
• Inspect workmanship and details in accordance with Integrated Inspection and test plan.

Bar Bending Scheduler في G-2 International
  • الإمارات العربية المتحدة
  • مارس 1997 إلى نوفمبر 1998

Bar Bending Scheduler
G-2 International, Jebel- Ali Free Zone, Dubai: March 1997 to Nov. 1998
Job Description: • Preparing and checking Bar Bending schedules for prestigious project as per British standard 8666 Projects including the pyramid health club -Dubai, Al Mazaya centre and centre point Apartments.
• Preparation of Bar Bending Schedules for approximately 15, 000 MT of steel reinforcement.

Site Civil Engineer في Avanti Engg
  • ديسمبر 1995 إلى فبراير 1997

Site Civil Engineer
Avanti Engg. And Const. Company: Dec. 1995 to Feb. 1997
Project / Cost: Birla Coopers Town ship Project (20 Million IRS)
Job Description: • Independent charge of onsite works.
• Study and scrutiny of drawings, setting out and survey works.
• Follow- up instructions from the Project Engineer and ensure proper implementation.
• Obtain day to day approval of the work done from the client.

الخلفية التعليمية

بكالوريوس, Civil Engineering QA/QC Manager
  • في Government Engineering College
  • ديسمبر 1995

CHETAN TALATI - B.Sc. Civil Engineering QA/QC Manager Personal Data and Summary of Qualifications: Qualifications/Degree • Bachelor of Civil Engineering from Government Engineering College, Gujarat, India. Further Qualifications • ISO 9001:2000 Internal Auditor - Course by TUV Middle East. ISO 9001:2008 Internal Quality Auditor course by QRG CERT. ISO 9001:2008 QMS Lead Auditor Course by TUV India • Dubai Municipality Certified Road Engineer Telephone: (+974) -55095108 Contact Address: P.O. Box. No. 31423 Doha, Qatar • E-Mail: NOC available.

Specialties & Skills

ENGINEER
INSPECTION
MILLION
PROJECT MANAGER
QA/QC MANAGER
QUALITY MANAGER
TEST PLANS
TRAINING

اللغات

الهندية
مبتدئ
الانجليزية
مبتدئ