Fabrication, erection and dismantling of steel structure, columns.
•Checking out Rigging study for critical equipment of projects.
•Study of drawings. i.e. - Piping Plan, P &ID, Etc.
•Checking & Identification of all piping materials.
Project. Revamping of MUPOL Piping and structural 12", 10" 4"& 2" pipe line and installation of gas lift manifold.
•Ensure CNG piping work carried out in accordance with company rules, regulations. Review work and inspection results
•to ensure compliance with EPC Contract requirements. Interface and coordinate with Project Field Engineering and QC Section.
•Monitor and ensure the correction of non-conformance report item
•Safeguard Company technical & contractual interests with respect to all Static and Piping Engineering and Procurement activities.
•Working with the Detailed Design & Procurement Contractor to ensure that Project, Company, and Group engineering and drawings prepared by Detailed Design & Procurement Contractor.
•Perform periodic/frequent short visits to project construction sites during the construction and Installation
WECO Engineering and Construction Company Limited Nigeria
Client Oriental Petroleum Nig ltd
•Determining client’s requirements and translating them into an actionable plan by a team of worker
• Organizing many tasks into a timeline
•Assuring that all deadlines are being met
•Making sure that all health, safety and legal requirements are being met throughout the process
•Responding to any client complaints, concerns or requests throughout the project
•Holding regular meetings to ensure that everything is going according to time and budget restrictions
Mobil Nig ltd, Fred - Oslen and Bwoffshore plc
Project: A. GK process piping up-grading, Etim LB and LP Life Extension project, Iyak-SA, Pigging-facilities-upgrade project-phase3 (Piping, Pipe Support and Over Head Rail modification).
Asabo Fabrication of Process and Firewater Piping for Asabo MB (restoration) and Well 11B Flow Lines and Etim life extension repairs project
B. Live boat platform extension on BWO FPSO,
Fabrication of ABO FPSO accommodation container foundation for deck E and F.
Fabrication and installation of 2’’, 4’’, 10’’&14’’ pipe cooling water line.
Up grading of process & Utilities line, Okwori Field Phase 111 - E4020 and new pipe rack (generic).
BWO FPSO module project M29.1, 2, 3 module project, Modification of Process line, utility line and KSB Pump up-grading Knock-Adoon FPSO/ Mar-lorencea platform
•Monitoring and coordinating Tie-in works in Piping Battery limits and in other major junction
•Responsible in piping project planning, screening of piping project
•opportunities, route selection, third party and environmental impact studies, and concept selections, and front-end design.
•Preparation of cost, time and resources (CTR) and establishing the piping engineering projects deliverables at both FEED and Detailed Design phases.
•Supervision of fabrication, erection, and execution of the project.
•Develop accurate P&ID isometric drawings applying practical design knowledge
•Carrying out final P&ID check of installed piping systems in the module
•Preparation of MTO as per required drawing.
During my school project it's really improve me in term's of engineering perspective.
courses: West African School Certificate W.A.
courses: West African School Certificate W.A.
courses: West African School Certificate W.A.