دانيال Ramirez, Product Manager

دانيال Ramirez

Product Manager

A

البلد
بنما
التعليم
الثانوية العامة أو ما يعادلها, Mechanical Engineering
الخبرات
25 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :25 years, 5 أشهر

Product Manager في A
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ يونيو 2016

Unidos por el Canal (GUPC). GUPC is a joint venture of Sacyr Spain,
Impregilo Italy, Jan De Nul Belgium and CUSA Panama
Project: Third Set of Lock Gates, Pacific site, Panama.
Position Held: Maintenance Manager (Pacific lock)
Upon completion of the construction, installation, commissioning and receipt of the
taking over certificate, the contract had a requirement for the contractor to maintain
the set of locks for three years.
Main functions:
· Lead and monitor the electromechanical team that carries out maintenance of
permanent works, ensuring that these activities are undertaken in a safe,
economic and efficient manner in accordance with contract specification.
· Review and Monitor the execution of a maintenance master plan that ensures
99.6 % of Lane availability of the locks.
· Ensure the availability o the adequate resources in the electromechanical
works, including staff, plant, materials and equipment.
· Representative of GUPC at meetings with ACP regarding maintenance
management issues.
January 2013 to June 2016
At Grupo Unidos por el Canal (GUPC). GUPC is a joint venture of Sacyr Spain,
Impregilo Italy, Jan De Nul Belgium and CUSA Panama
Project: Third Set of Lock Gates, Pacific site,

Coordinator في A
  • الإمارات العربية المتحدة
  • يناير 2008 إلى يناير 2010

Coordinated planning and execution of all activities of the refurbishment project
with the contractor - Alstom France
· Provided leadership in managing all technical aspects - revision of technical
proposals, planning and programming and minimization of technical challenges,
installation supervision and project control and quality assurance/quality
control.
· Coordinated technical aspects for revision and approval of installation manuals
and recording protocols.
· Attended inspections of components at overseas factories of Alstom France
during fabrication and issued release to ship approvals.
· Resolved all technical problems during contract execution in coordination with
Alstom France.
· Coordinated with the engineering department for review and approval of all
technical documentation presented by the contractor.
· Coordinated with the power plant operating department to obtain all permits to
execute contract jobs.
Daniel J Ramirez B.
· Led the mechanical team during commissioning. Coordinated with
commissioning engineers and facility managers on site. Reviewed and
commented on all mechanical testing and commissioning statements.

Project في A
  • الإمارات العربية المتحدة
  • يناير 2006 إلى يناير 2007

Macagua I, upgrade 360 MW Hydraulic Power Plant to 482 MW. Six
Francis Turbines from 60 MW to 82 MW, including new generators, new
auxiliary equipment, new main and auxiliary bridge crane, new gantry crane,
overhaul of the intake gates, trash racks, outlet gates, penstock, new
substation and transmission lines.
Position Held: Mechanical Installation and Inspection Coordinator.
Main functions:
· Coordinated all mechanical inspections with the contractor - IMPSA ensuring
adherence to all contract scope, specifications and quality standards.
· Coordinated with the engineering department for review and approval of all
technical documentation presented by the contractor.
· Coordinated with the power plant operating department to obtain all permits to

Construction Engineer في Hitachi Plant Construction Venezuela C.A. Pto Ordaz
  • فنزويلا
  • يناير 2001 إلى يناير 2006

Responsible for revision of proposals, programming and coordinating with the
contractor (GE-Kvaerner) for the execution of all pending points from the main
contract which included the Design, Fabrication and installation of 12
Generators (General Electric) of 220 MVA, 7 transformers (Va Tech Elin) of 220
MVA and 12 Kaplan Turbines (Kvaerner) of 180 MW with their corresponding
auxiliary equipment

Project في Hitachi Plant Construction Venezuela C.A
  • يناير 1998 إلى يناير 2001
Coordinator في Hitachi Plant Construction Venezuela C.A
  • يناير 1994 إلى يناير 1997

Led the design, planning, construction and installation of a fabrication shop for
light structures and piping for the construction of a briquette plant on behalf of
The Orinoco Iron Company.
· Management and administration of the fabrication shop
· Estimated and scheduled the fabrication of piping within the shop.
· In charge of the administration and coordination of the main warehouse and
mechanical maintenance shop that provided assistance to the different projects
in progress

Project في Hitachi Plant Construction Venezuela C.A
  • يناير 1991 إلى يناير 1993

· Superintendent of Mechanical Assembly and RE Mechanical / Team Leader
· Served as liaison and coordinator with the client (EDELCA) in problem solving
and technical support during the installation, construction and problems
encountered during the project.

Field Engineer في Hitachi Plant Construction Venezuela C.A
  • فنزويلا
  • يناير 1989 إلى يناير 1990

Participated in programming, planning and installation of piping systems -
gas, steam, hydraulic and compressed air - for the Midrex reactor of an iron
ore pellet plant.
· Coordinated with supervisors and craftsmen in all jobs related to fabrication,
installation and testing of the piping systems.

Project
  • إلى

Refurbishment of 3x400 MW Francis turbines and upgrade of 1
turbine from 300 MW to 400 MW.

Project في Caruachi Hydroelectric Power project 2160 MW
  • إلى
Construction Coordinator في Caruachi Hydroelectric Power project 2160 MW
  • إلى

charge of the planning, programming, and supervision for the installation
of 12 Generators (General Electric) of 220 MVA, 7 transformers (Va Tech Elin)
of 220 MVA and 12 Kaplan Turbines (Kvaerner) of 180 MW and all
corresponding auxiliary equipment packages.
· Served as liaison and coordinator with the client (General Electric) in problem
solving and technical support during the installation, construction and problems
encountered during the project.
· Planning, programming and supervision of the installation of two 350 ton and
one 750 ton capacity bridge cranes.
· Managed a technical staff of 60 (engineers, superintendents, supervisors and
technicians) and more than 300 craft in the mechanical, electrical, fitting and
welding, transportation and quality control areas.
· Responsibilities included bid preparation, estimating, planning, and recruiting
and training of employees.
· Served as liaison and coordinator with the client (General Electric) in problem
solving and technical support during the installation, construction and problems
encountered during the project.

Project في Macagua II Hydroelectric power project (3160 MW) Orinoco Iron Briquetting Plan
  • إلى
Superintendent
  • إلى

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, Mechanical Engineering
  • في 1988University Of Alabam
  • فبراير 2019
بكالوريوس, Mechanical Engineering
  • في 1988University Of Alabam
  • فبراير 2019

courses: Renewable Energies and Electrical Projects (in progress) CEUPE

Specialties & Skills

Construction Management
Program Management
Project Management
Hydropower
MECHANICAL
PROGRAMMING
PROGRESS
PROPOSAL WRITING
BUDGETING
CONTRACT MANAGEMENT
DOCUMENTATION
LEADERSHIP
MANAGEMENT
MATERIALS MANAGEMENT

اللغات

الانجليزية
متمرّس
الاسبانية
متمرّس