Mechanical engineer
Radius Engineering
Total years of experience :11 years, 5 Months
Checking the IFC drawings and executing Workshop Drawing Preparation.
Experienced in Installation, Testing and commissioning of Package unit, Split Air-conditioning unit, 7 Nos. - 415 Ton Air Cooled water chillers, 12 Nos. Chilled Water Pumps, 90 Nos. AHUs, 8 Energy Recovery Units, 980 Nos. FCUs, 166 Ventilation Fans including 65 Jet Fans & DX Systems Heat Exchangers.
Piping of District cooling Primary as well as secondary at Foxhill, Lusail
Heat load calculation and External static pressure calculation of AHU, FCU & ERU.
Pump Head calculation of Pumps. Installation of chilled water pump and Valves.
Responsible for installation of piping system.
Responsible for installation of Drain system for Hvac system
Responsible for installation of Hvac control system i.e. BMS
Installation, Testing and commissioning of fire protection system (fire pumps, sprinkler systems, Extinguishing system, Zone control valve Assembly, FM-200 system, Aerosol Systems & Fire Hydrant System according to NFPA standards and local authority jurisdictions requirements).
Provided fire protection technical support to facility staff and management.
Water Supply Demand following UPC Standards.
Underground reservoir, Elevated Roof Tank Sizing.
Water Supply System and Foul Water Drainage System Calculation.
Vertical Stack, Branch Drain pipe, Horizontal sewer Sizing.
Manhole, Septic Tank, Soak away pit, Dispersion Trenches Calculation.
Storm water drainage & External water supply Calculation.
Garden water supply & fountain designing.
Head loss Calculation for Water Pipe System.
Water Pump, Booster Pump, Auto Pneumatic Tank, Fountain Pump Selection.
Selected plumbing and fire suppression systems to comply with codes, client specifications
Experienced in Grey water treatment system, sanitary waste & vent, hot and cold water, storm water & GRP Tank.
• Cooling Load Calculations. (ASHRAE, ISHRAE codes - Manually E-20 form.
• Equipment Selection as per duty condition.
• Pipe Designing, Valve Package.
• Checking the IFC drawings and execution of the HVAC work as per the IFC drawings.
• Preparing the material submittals as per project’s specifications and standards.
• Execution as per the codes and standards (ASHRAE, SMACNA).
• Installation of all HVAC equipments such as chillers, pumps, Air handling units (A.H.U), Air cooled package units, Fan coil units (F.C.U), and Precision units, Supply/Exhaust fans, Ducts and required HVAC systems.
• Raising the inspections for the installations and follow up to the consultant for the same and resolving the comments for the approvals.
• Preparing the schedules and target dates for the completions of work and co-ordinate with the sub-ordinates for the same.
• Distributing installation work and setting the targets amongst the employees.
• Maintaining daily work progress report.
• Maintaining records for successful completion of the installation.
• Coordinating with the 3rd party for the Testing and Commissioning of the HVAC systems such as Chillers, Air handling units (A.H.U), Pumps, FCU.
• Conducting the meetings for the work progress with the contractor, consultant and client.
I persuaded my Engineering from Biju patnaik university of Technology,Odisha.
CLASS XII (ISC): Math's stream Gulmohur High School, Jamshedpur, Jharkhand. I.C.S.E
CLASS X (ISCE): All compulsory Gulmohur High School, Jamshedpur, Jharkhand. I.C.S.E.