Infrastructure Draftsman and GIS Operator
DAR AL-OMRAN
Total years of experience :6 years, 0 Months
From 2010 to present
Employer: DAR AL-OMRAN Infrastructure & Environment
Positions held: Infrastructure Draftsman and GIS Operator
Year: 2010 - 2012
Location: Arab Countries
Client: Arab Fund for Economic and Social Development
Positions held: Draftsman & GIS operator
Main Project Features: Regional Planning Studies and design of 4000 km of railway lines
Activities performed: Creating several GIS maps for the proposed rail corridor, which consist of the following: affected population, water resources, natural conservation area, and natural resources. Creating environmental sensitivity maps and necessary CAD drawings for the proposed rail route with an approximate length of 4000 km.
From 2009 to 2010
Employer: Wajih Contracting Company
Positions held: Architectural Draftsman
From 2008 to 2009
Employer: DAR AL-OMRAN Infrastructure & Environment
Positions held: Infrastructure Draftsman
From 2007 to 2008
Employer: Al Ballad Company
Positions held: Architectural Draftsman
10. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
\[Among the assignments in which the staff has been involved, indicate the following information for those assignments that best illustrate staff capability to handle the tasks listed under point 11.\]
Name of assignment or project: Development of Water, Sanitation, and Hygiene Master Plan for Missan Governorate
Year: Location: Missan Governorate, Iraq
Client: UNICEF - Iraq
Positions held: Draftsman & GIS operator
Main Project Features: The overall objective of the consultancy assignment is to provide tailored support to the Government of the Republic of Iraq on strategic developments of a Water Supply, Sanitation and Hygiene (WASH) sector Master Plan for Missan Governorate
Activities performed: Creating several GIS maps for the proposed water networks, which include: main network pipelines and house connection. Creating necessary CAD drawings for the proposed water network.
Name of assignment or project: Consultancy Services for the Development of Al Muthana Integrated Water and Sanitation Master Plan
Year: 2009
Location: Muthana Governorate - Iraq
Client: UNDP - Iraq
Positions held: Draftsman & GIS operator
Main Project Features: Development of a complete Master Plan for Water and Sanitation related to the Governorate.
Activities performed: Creating several GIS maps for the proposed water and sanitation networks, which include: main network pipelines and house connections, creating necessary CAD drawings for the proposed water network.
Name of assignment or project: Consultancy Service for Master Plan Review, Catchment Rehabilitation and Awareness Creation for Geferssa, Legedadi, and Dire Catchment Areas
Year: 2011 - on-going
Location: Ethiopia
Client: Addis Ababa Water Supply and Sanitation Development and Rehabilitation Office
Positions held: Draftsman & GIS operator
Main Project Features: The Project main objectives are: A. Rehabilitation the degraded catchment of Legedadi, Dire, and Geffersa Dams to minimize risk of siltation into the dams
B. Improving overall water quality
C. Raising the holding capacity of the dams
Activities performed: Creating environmental sensitivity maps, and GIS maps for water network, and creating CAD drawings for pumping stations and water network including water network profile
Name of assignment or project: Feasibility Study and Detailed Engineering Design for Sana'a - Al-Hodeidah Road
Year: on-going
Location: Yemen
Client: Ministry of Public Works and Highways - Yemen
Positions held: Draftsman & GIS operator
Main Project Features: Conduct a feasibility study and major highway design
Activities performed: Creating GIS maps for existing road, and environmental sensitivity maps to include: affected population, natural resources, and creating CAD drawings for roads, traffic, profiles, sections
Name of assignment or project: Arab Railway Network Study
5. Education[Indicate college/university and other specialized education of staff member, giving names of institutions, degrees obtained, and dates of obtainment]: o Architecture - College of Wade Al- Seer -2007-2008 6. Other Training: o AutoCAD (2d-3d) o Photoshop o GIS o Civil 3D 7. Countries of Work Experience: Jordan, Yemen, Ethiopia