Senior Cost Engineer
Saudi Arabian BECHTEL Company.
Total years of experience :11 years, 10 Months
• Involved in costing and estimation tasks for the Trojena project, particularly for the Asian Winter Games cluster.
• Participating in the preparation of diverse reports including cost and commitment reports, as well as budget preparation.
• Utilizing various Project Management Software (PMS) such as Aconex, Unifier, and SAP to generate reports and compile data.
• Engage in budget preparation work for projects.
• Engage in cost control and cost monitoring works for four underground metro projects.
• Preparing turnover statements for all ongoing projects at BU Level.
• Analyzing and preparing P&L statements for all projects and projecting to the higher management.
• Monitoring project health and providing necessary supports to project team or accomplishing the job.
• Working in SAP Platform for budget entry and budget monitoring work.
• Working in Candy Platform for budget estimation work.
• Engage in making schedule (Using Primavera P6) and monitoring of project.
• Preparing tender documents for the project and analysis them for delay analysis, cost management and claim management.
• Preparing bar bending schedule for the project and checker of reinforcement.
• Working as a QS engineer in Mumbai underground metro project.
• Taking care of reinforcement factories i.e. reinforcement in-charge for the entire project.
• Preparation and Review of Contracts of Sub-Contractors.
• Reviewing Laboratory & Field Test Reports of construction materials as well as reviewing manufacturer’s certificate for approval of their product / materials including installation techniques and site workmanship standards.
• Pre-cast segment In-Charge(OTE DUCT).
Elevated) 30.07.16-25.03.18
•Expertise in construction of elevated metro including sub structure and super structure.
•Consultation on planning (Primavera P6) and execution subject matter.
•Engage in making schedule, bar bending schedule making for the project.
•Making bills of sub-contractors.
•Studying the civil infrastructure drawings, specifications, codes, regulations & identifying problematic design issues in order to support engineering procedure.
•Preparation and Review of Contracts of Sub-Contractors.
•Preparing daily progress report and monitoring progress as per scheduled baseline.
•Planning and procurement of equipment, machineries and materials and preparing Cash Flows at tender stage as well as for ongoing projects.
•Reviewing and preparing Payment Certificates, Analysis of Claims, Cost Estimate, Evaluation of New Unit Rates, Variation, and Reconciliation of BOQs/Materials and taking Quantities from the Drawings.
•Selection of materials for construction work, taking the approval from the consultants and checking various test reports.
•Organizing the inspection of materials used in the construction work according to standards of the project and workmanship.
•Reviewing Laboratory & Field Test Reports of construction materials as well as reviewing manufacturers certificate for approval of their product / materials including installation techniques and site workmanship standards.
•Preparing five week look ahead and 3 months look ahead programme for finishing works and monitoring as per the plan and making necessary changes.
Bored Cast in Situ Piles, Pile Load Tests, Secant Piles and Sheet Piles.
•Mass Concrete of Open Foundations up to 2000 Cubic meter.
•Pile Caps, Abutments, Abutment Caps, Piers, Pier Caps, Portal beams, Bearings, Diaphragm, Deck Slabs with Drainage Spouts and Expansion Joints and Approach Slabs etc.
•Mock-up of diferent structural elements of bridges. (Piers, Pier Caps, Post Tensioning Grouting etc.)
•Preparation and Checking of Bar Bending Schedules (BBS) and Cutting and Bending of Steel Reinforcement with Latest Machines and making Steel Cages for diferent structures of the bridges and other Structures.
•Staging and shuttering works of Bridges and Flyovers.
•Managing RFIs (Request for Inspection) at Project Site.
•Taking OGLs with Auto Level.
•Site planning activities like 3 month look ahead, five week look ahead and time chain age programmer.
Bored Cast in Situ Piles, Pile Load Tests, Secant Piles and Sheet Piles.
•Pile Caps, Abutments, Abutment Caps, Piers, Pier Caps, Portal beams).
•Mock-up of diferent structural elements of bridges. (Piers, Pier Caps etc.)
•Preparation and Checking of Bar Bending Schedules (BBS) and Cutting and Bending of Steel Reinforcement with Latest Machines and making Steel Cages for diferent structures of the bridges and other Structures.
•Staging and shuttering works of Bridges and Flyovers.
•Managing RFIs (Request for Inspection) at Project Site.
•Taking OGLs with Auto Level.
•Site planning activities like 3 month look ahead, five week look ahead.