Total Years of Experience: 8 Years, 0 Months
May 2022
To Present
Process Engineer
at FHN 26 Ltd
Location :
Nigeria - Warri
I am the Process Engineer that provides process engineering support to the Engineering and Operations team.
Process Engineer (Permanent) / First Hydrocarbon Nigeria (FHN)/NNPCL JV OML26 05/2022 - Current
• Managed Process engineering deliverables; Concept, FEED, DED, mechanical completion, pre-commissioning and commissioning of Oil and Gas facilities, ensuring projects were delivered on time, within budget and with quality.
• Provided flow assurance and engineering support to Ogini Flow station, resulting in a 15% reduction in production interruptions due to flow assurance-related issues.
• Participated in process safety engineering design review, HAZID, HAZOP and SAFETY CASE sessions closing out 95% of identified action items.
• Prepared, reviewed, and updated operating manuals, improving process documentation and reducing operator errors by 30%.
• Coordinated critical facility maintenance for Ogini Flowstation, reducing downtime by 20% and improving overall operational and process reliability.
• Lead for FEED Studies- Ogini Additional Water Disposal Studies and Associated Gas Monetization Projects.
PROJECTS
• 45 kb/d Ogini Flowstation Debottlenecking Project, Completed 2022
• Low Pressure (LP) Flare Project-Completed-2021
• 12'' Umungini Pipeline Tie-in Project-in view
• 2x20kbbls Crude Storage Tanks Project-Completed-2020
• 2x40kbbls Crude Storage Tanks Project-Completed- construction in progress.
• 6'' x 3.2 km Ogini- 8 Produced Water Re-injection Project-completed-2021
• 30 MMSCFD Associated Gas (AG) Processing facility.
• 30 MMSCFD LFTZ City gate Gas Station
• 14 Km Eriemu to UPS & 61 km Eriemu to Pan Ocean, Amukpe Pipeline Projects
Others:
I also provide Flow Assurance support to the WRFM team.
I supervised the Reactivation of SCADA Gas Distribution Manifold Project for Gas Lift of Ogini Wells.
I have experience in two and three phase operations and facility debottlenecking.
Process Engineer (Permanent) / First Hydrocarbon Nigeria (FHN)/NNPCL JV OML26 05/2022 - Current
• Managed Process engineering deliverables; Concept, FEED, DED, mechanical completion, pre-commissioning and commissioning of Oil and Gas facilities, ensuring projects were delivered on time, within budget and with quality.
• Provided flow assurance and engineering support to Ogini Flow station, resulting in a 15% reduction in production interruptions due to flow assurance-related issues.
• Participated in process safety engineering design review, HAZID, HAZOP and SAFETY CASE sessions closing out 95% of identified action items.
• Prepared, reviewed, and updated operating manuals, improving process documentation and reducing operator errors by 30%.
• Coordinated critical facility maintenance for Ogini Flowstation, reducing downtime by 20% and improving overall operational and process reliability.
• Lead for FEED Studies- Ogini Additional Water Disposal Studies and Associated Gas Monetization Projects.
PROJECTS
• 45 kb/d Ogini Flowstation Debottlenecking Project, Completed 2022
• Low Pressure (LP) Flare Project-Completed-2021
• 12'' Umungini Pipeline Tie-in Project-in view
• 2x20kbbls Crude Storage Tanks Project-Completed-2020
• 2x40kbbls Crude Storage Tanks Project-Completed- construction in progress.
• 6'' x 3.2 km Ogini- 8 Produced Water Re-injection Project-completed-2021
• 30 MMSCFD Associated Gas (AG) Processing facility.
• 30 MMSCFD LFTZ City gate Gas Station
• 14 Km Eriemu to UPS & 61 km Eriemu to Pan Ocean, Amukpe Pipeline Projects
Others:
I also provide Flow Assurance support to the WRFM team.
I supervised the Reactivation of SCADA Gas Distribution Manifold Project for Gas Lift of Ogini Wells.
I have experience in two and three phase operations and facility debottlenecking.
Share on Facebook