Planned and coordinated electrical activities in the site. That's means but not limit.




Coordination with Clint & Sub Contractor for Solving Technical Problems As per Project Standards & Project Specification.
Weekly Meeting with Clint & Subcontractors Regarding Work Progress & Material Issue.
Pulled, dressed, terminated and connected power cables, control cables and instrumentation cables between each item and concerned MCC;
Installed the electrical motors, lighting fixtures(normal, emergency and escape);
HVAC units (air conditions, steam heaters, electrical heaters, exhaust fan, ventilators),
Installed Power Transformers, Lighting Transformers and Heat Tracing Transformers Systems;
Installed Power Cable Trays, Instrumentation Cable Trays for Fire Alarm, HVAC Control Cable Trays works,
Pre-commissioning all cables (including mechanical completion, cables continuity check and megger test);
Pre-commissioning all electrical and instrumentation equipment.
Managed monthly and yearly budget for electrical labor, tools, and spare parts.
Ensured electrical preventive & predictive maintenance programs.

Electrical Supervisor في Kettaneh Construction, SADARA (Saudi Aramco Dow Arabia)
  • المملكة العربية السعودية
  • ديسمبر 2008 إلى يناير 2008

Planned and coordinated electrical activities in the site. That's means but not limit.
Coordination with Clint & Sub Contractor,
Weekly Meeting with Clint & Subcontractors Regarding Work Progress & Material Issue.
Preparing Official Documents for Project, Material Submittal, and Technical Query with Related Project Specification.
Handling All Electrical Material Including Material Inspection With Project Management Team.
Preparing Material Take Off, Tools and Equipment Required To Executive The Electrical Works.
Activity Schedule; Shop Drawing and Actual Implementation; Technical Assistant site works
Installed the electrical motors, lighting fixtures(normal, emergency and escape);
HVAC units (air conditions, steam heaters, electrical heaters, exhaust fan, ventilators),
Installed Power Cable Trays, Instrumentation Cable Trays for Fire Alarm, HVAC Control Cable Trays works,
Pre-commissioning all cables (including mechanical completion, cables continuity check and megger test);
Pre-commissioning all electrical and instrumentation equipment.
Managed monthly and yearly budget for electrical labor, tools, and spare parts.
Ensured electrical preventive & predictive maintenance programs.

Technical Assistant في 2012 Kettaneh Construction, KAFD- District Cooling Plant - King Abdullah Financial District Riyadh Investment Company
  • المملكة العربية السعودية
  • ديسمبر 2008 إلى يناير 2008

My Duties include Site Supervision in the execution of electrical works; Electrical Quantity Survey: Manpower and Material Management; Monitoring of Contract Activities and ensuring Compliance to the Project Control Procedures, Standards and Safety; Monitoring of Daily Electrical Work Progress; Monitoring of Cathodic Protection Electrical System Installation, Inspection Measurements and Testing; Testing and Comissning of Electrical Works Documentation Project Handover of Electrical Works and Electrical Systems Design for the Following
Preparing Material Take Off, Tools and Equipment Required To Executive The Electrical Works.
Monitor Progress of Work and Prepare Monthly Billing,
Electrical Material Purchasing, Prepare Material Submittals, Correspondence & Documentation.
Coordination with Clint & Sub Contractor and Material Suppliers.
Activity Schedule; Shop Drawing and Actual Implementation

Electrical Supervisor
  • مايو 2003 إلى يناير 2003
Site Engineer في 2012 NOCL – Nagarjuna Oil Corporation Ltd
  • الهند
  • مايو 2003 إلى يناير 2003

My Duties include Site Supervision in the execution of electrical works; Electrical Quantity Survey: Manpower and Material Management; Monitoring of Contract Activities, Here I started the career of Site Engineer. I had maintenance and repair tasks in terms of electric Motors and Generators Also in the sector of metal processing chips (lathes, mills, planers, etc.). It was a period of accumulation of work on the electric drive. I left this job because the site where I started was a challenge for me to be there the team leader. And also higher wages offered by the new employer has a reason to leave.

Preparing Material Take Off, Tools and Equipment Required To Executive The Electrical Works.
Monitor Progress of Work and Prepare Monthly Billing,
Electrical Material Purchasing, Prepare Material Submittals, Correspondence & Documentation.
Coordination with Clint & Sub Contractor and Material Suppliers.
Activity Schedule; Shop Drawing and Actual Implementation; Technical Assistant site works
Monitor Progress of Work’s & Maintenance.
For Power Stations, Electrical Installations and Electrical Networks Monitoring.
Maintenance and Repair Equipment metals: detect and correct defects in control and power schemes, making the planned revisions to the energy equipment (motors, power transformers, generators, etc.),
coordinate all electrical activity in a shift

الخلفية التعليمية

بكالوريوس, Electrical & Electronics Engineering
  • في Annamalai University

in

Specialties & Skills

BILLING
BUDGETING
CABLEADO
DOCUMENTATION
LIGHTING
MECHANICAL
MICROSOFT WORKS
PROGRESS
SPECIFICATION

اللغات

الانجليزية
متمرّس
الهندية
متمرّس