إدوارد wehbe, Acting E&I manager

إدوارد wehbe

Acting E&I manager

Consolidated Contractors Company

البلد
كازاخستان
التعليم
ماجستير, electrical engineering
الخبرات
18 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 2 أشهر

Acting E&I manager في Consolidated Contractors Company
  • كازاخستان
  • أشغل هذه الوظيفة منذ ديسمبر 2016

 Worked as construction manager E&I covering installation, constructability study of the scope, as built, method statements, estimation, planning, mobilization of staff, manpower scheduling, procurement, progress monitoring, quantity re-measurement, variation orders, coordination with subcontractors, vendors, and clients.
 Maintain a strong and effective professional working relationship with the client, interfacing EPC’s and subcontractors.
 Organized, disciplined, and able to perform under pressure and manage multiple priorities and parallel tasks.
 Adopt the team to the new program WFP (Workface Planning) as well as developing to the team the execution of the IWP (Installation Work Package).
 Provide strong leadership and coordination to ensure the site team is working effectively to achieve the project milestone.
 Identifying and address risks at the site, optimizing the problem and mitigate, escalating unforeseen issues to the project manager as required.
 Provide cross-functional coordination among team to promote the implementation of the project execution plan.
 Manage all expenditures at the site in accordance with company and project procedures, and delegation of authority.

Project electrical engineer في Aramco
  • المملكة العربية السعودية - جدة
  • ديسمبر 2014 إلى يونيو 2016

• Supervised work progress on site to ensure correct interpretation of designs in order to avoid project delays.
• Reviewed 90 % of the method statements, and as built drawings to ensure that all project metrics are met or exceeded and ensured full HSE compliance.
• Analyzed along with contractor the resources necessary for pre-commissioning, startup activities in order to be aligned with project schedule.
• Arranged with planning engineer in generating weekly progress and look-ahead plan for the project.
• Revised almost 50 % of payment certificates for the Electrical Main Contractor against work done.

Section Engineer في Aramco
  • المملكة العربية السعودية - ينبع
  • يوليو 2012 إلى أغسطس 2014

• Managed daily site supervision and technical support, execution and engineering coordination for the electrical team in field.
• Elevated significant problems to Project Manager and proposed corrective actions.
• Managed contractor’s progress report to ensure project is within the planning schedule and avoiding any slippages / deviations in execution.
• Accomplished the final release of 950 loop folders and solved the loop check problems related to (Valves, PIT, PDIT, TXT …etc.).
• Secured Client in revising and evaluation for the approval technical submittals and vendors documents submitted by contractors to ensure corporation standards are maintained.

Section Engineer في Consolidate Contractors International Company
  • العراق - البصرة
  • يوليو 2011 إلى يونيو 2012

• Assigned for engineering coordination and reviewed the total 100% of shop drawings, cables design, sizes, length, loads, including cable installation.
• Provided daily supervision and technical support for the electrical teams and managed construction activities through the weekly and monthly reports to ensure project is executed within the planning schedule and estimated budget.

Sennior Electrical Engineer في Consolidated Contractors International Company
  • المملكة العربية السعودية - الرياض
  • فبراير 2010 إلى مايو 2011

• Prepared on time, approximately 20% of shop drawings related to electrical scope of work, Bill of quantity (BOQ) and submittal quotations for approved material requests.
• Monitored more than 210 people for Installation activities such as (cable trays, cables, Switchgears, MCC, ATS, MDB, LP, PP, UPS, SCADA System, PAGA, CTV, RTU, etc...) which are executed within budget man-hours and approved schedule.
• Initiated for project site progress report information and look-ahead plan to Project Manager at the required frequency and content as well.

Junior / Senior Electrical Engineer في Consolidated Contractors International Company
  • المملكة العربية السعودية - الشرقية
  • يناير 2006 إلى فبراير 2010

• Managed 450 people in charge for cable pulling installation, testing and pre-commissioning up to 115 KV (1300km - 98% achieved ahead of time scheduled).
• Communicated with different disciplines (Mech, Civil) team, to ensure works are in proper sequence.
• Delegated for installing 100% of the Heat Tracing system (HT), Cathodic Protection (CP), and 35 % of PAGA, communication and Fire Alarm (NFPA) systems of the project.

Junior Engineer في INDEVCO
  • لبنان - بيروت
  • يونيو 2005 إلى ديسمبر 2005

• Examined the power house with a capacity of 8 MVA and initiated a daily report to section engineer in line with anticipating him to any potential problem in a pro-active manner.

الخلفية التعليمية

ماجستير, electrical engineering
  • في University Of Balamand
  • أغسطس 2005

Master of electrical engineering general option. interest include Residential projects, power plant, oil and gas plant, petrochemical plant or every things related to this area.

Specialties & Skills

Cable Management
Small power
Substation
Public Address
Cathodic Protection
computer office, electrical softwares, all things related to the electrical softwares topics
Autocad2009

اللغات

الانجليزية
متمرّس
الفرنسية
متوسط
العربية
متمرّس

التدريب و الشهادات

PMP (الشهادة)
تاريخ الدورة:
September 2014