edwin valdez, QA/QC.COORDINATOR

edwin valdez

QA/QC.COORDINATOR

SRACO

Location
Saudi Arabia - Dammam
Education
Bachelor's degree, Electrical Engineering
Experience
29 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :29 years, 11 Months

QA/QC.COORDINATOR at SRACO
  • Saudi Arabia
  • January 2012 to November 2012

• More than twenty nine (29) years experiences in electrical engineering design, planning, scheduling, construction, supervision, and site inspection of substation, 133Kv to 233Kv very high voltage power Sub - Station, Overhead Transmission line, Gas, Oil Plant, Gas Turbine power plant, nuclear power plants, high rise buildings, villas and commercial buildings in Saudi Arabia and in the Philippines.
WORK EXPERIENCES (Pls. include all your Employment History)
COMPANY: SRACO

QA/QC.SUPERVISOR (ELECTRICAL) at HYUNDAI/MEEDCO ENGINEERING CO.LTD
  • June 2010 to November 2011

• More than twenty nine (29) years experiences in electrical engineering design, planning, scheduling, construction, supervision, and site inspection of substation, 133Kv to 233Kv very high voltage power Sub - Station, Overhead Transmission line, Gas, Oil Plant, Gas Turbine power plant, nuclear power plants, high rise buildings, villas and commercial buildings in Saudi Arabia and in the Philippines.
WORK EXPERIENCES (Pls. include all your Employment History)
COMPANY: SRACO

QA/QC LEAD ENGINEER (ELECTRICAL) at MAN FERROUSTAL INDUSTRELANGEN OIL AND GAS LTD
  • January 2008 to January 2009

• More than twenty nine (29) years experiences in electrical engineering design, planning, scheduling, construction, supervision, and site inspection of substation, 133Kv to 233Kv very high voltage power Sub - Station, Overhead Transmission line, Gas, Oil Plant, Gas Turbine power plant, nuclear power plants, high rise buildings, villas and commercial buildings in Saudi Arabia and in the Philippines.
WORK EXPERIENCES (Pls. include all your Employment History)
COMPANY: SRACO
POSITION: QA/QC.COORDINATOR
DURATION: 2012-PRESENT
LOCATION: DHARAN, ABQAIQ, UDALLAH, KURSANIYAH, RASTANURA, RIYADH, JEDDAH, JUBAIL.

COMPANY PROFILE: SRACO CONSULTING COMPANY IS ONE OF THE LEADING ENGINEERING CONSULTING FIRM IN SAUDI ARAMCO FOR OIL, GAS, PETROCHEMICAL, LNG, BUILDING CONSTRUCTION, PLANNING, DESIGN, INSPECTION AND SUPERVISION IN ALL ARAMCO TECHNICAL PROJECT.

JOB DESCRIPTION: • Development, implementation and maintaining quality management system.
• Performing assessment of quality management system to determine whether quality activities are implemented effectively.
• Reviewing quality document submittal of project contractors, and monitoring quality activities at all stage of the project.
• Preparing Quality Progress inspection report.
• Scheduling quality audit and Quality management system in accordance with the requirements of ISO 9000 and 9001


COMPANY: HYUNDAI/MEEDCO ENGINEERING CO.LTD.
POSITION: QA/QC.SUPERVISOR (ELECTRICAL)
DURATION: JUNE 2010 -NOV. 2011
LOCATION: KURSANIYAH, MANIFA, GAS, OIL, PETROCHEM ARAMCO PROJECT

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

HYUNDAI/MEEDCO CO. is one of the leading Engineering Construction Company for Oil, Gas, Petrochem -LNG management and procurement, suppliers of high voltage transformer, Gas Insulated Switchgear, architects, Building construction and other technical projects for Aramco / Sceco projects.

PROJECT HANDLED:
þ Aramco Project
Kursaniyah /Manifa and Jubail Saudi Arabia

• Construction of Oil, Gas, Petrochem- LNG Plant such as offices, executive training centers, recreation building, medical facilities and staff housing. and Medium/High Voltage Sub-Station Project.
• Construction of electrical facilities such as power house, Electrical building, Communication building, Outdoor Sub Stations, HVAC building and Pump station.
• Installation of Outdoor Power, Telephone, Data and Communication cables.
Project Cost: 76 Billion US Dollars

JOB DESCRIPTION:
• Lead and coordinate Quality related activities on projects, perform quality management evaluation of contractors and vendors by assessment & bid evaluation.
• Perform site supervision, inspection, and supervised the activities perform by QA/QC Engineers and Inspectors.
• Check electrical scope of work and Procedure submitted by the sub-contractor.
• Review other design drawings made by Aramco Design Department.
• Supervise, monitor and inspect electrical works perform by the construction group whether it conform to approved construction drawing, specification and international standard.
• Monitoring the necessary documentation like RFI Forms, log book entries, two weeks look ahead, inspection schedule and supervision.
• Ensure proper filling of documents checking and reviewing construction AFC Drawing to verify if it is conform to project specification.
• Witness all test to be performed on Sub-Station such as low voltage, medium voltage, high voltage switch gear, control gear, gas insulated switch gear.

QA/QC ENGINEER/MANAGER at IMAD CO. FOR TRADING AND CONTRACTING CO
  • January 2007 to January 2008

• More than twenty nine (29) years experiences in electrical engineering design, planning, scheduling, construction, supervision, and site inspection of substation, 133Kv to 233Kv very high voltage power Sub - Station, Overhead Transmission line, Gas, Oil Plant, Gas Turbine power plant, nuclear power plants, high rise buildings, villas and commercial buildings in Saudi Arabia and in the Philippines.
WORK EXPERIENCES (Pls. include all your Employment History)
COMPANY: SRACO
POSITION: QA/QC.COORDINATOR
DURATION: 2012-PRESENT
LOCATION: DHARAN, ABQAIQ, UDALLAH, KURSANIYAH, RASTANURA, RIYADH, JEDDAH, JUBAIL.

COMPANY PROFILE: SRACO CONSULTING COMPANY IS ONE OF THE LEADING ENGINEERING CONSULTING FIRM IN SAUDI ARAMCO FOR OIL, GAS, PETROCHEMICAL, LNG, BUILDING CONSTRUCTION, PLANNING, DESIGN, INSPECTION AND SUPERVISION IN ALL ARAMCO TECHNICAL PROJECT.

JOB DESCRIPTION: • Development, implementation and maintaining quality management system.
• Performing assessment of quality management system to determine whether quality activities are implemented effectively.
• Reviewing quality document submittal of project contractors, and monitoring quality activities at all stage of the project.
• Preparing Quality Progress inspection report.
• Scheduling quality audit and Quality management system in accordance with the requirements of ISO 9000 and 9001


COMPANY: HYUNDAI/MEEDCO ENGINEERING CO.LTD.
POSITION: QA/QC.SUPERVISOR (ELECTRICAL)
DURATION: JUNE 2010 -NOV. 2011
LOCATION: KURSANIYAH, MANIFA, GAS, OIL, PETROCHEM ARAMCO PROJECT

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

HYUNDAI/MEEDCO CO. is one of the leading Engineering Construction Company for Oil, Gas, Petrochem -LNG management and procurement, suppliers of high voltage transformer, Gas Insulated Switchgear, architects, Building construction and other technical projects for Aramco / Sceco projects.

PROJECT HANDLED:
þ Aramco Project
Kursaniyah /Manifa and Jubail Saudi Arabia

• Construction of Oil, Gas, Petrochem- LNG Plant such as offices, executive training centers, recreation building, medical facilities and staff housing. and Medium/High Voltage Sub-Station Project.
• Construction of electrical facilities such as power house, Electrical building, Communication building, Outdoor Sub Stations, HVAC building and Pump station.
• Installation of Outdoor Power, Telephone, Data and Communication cables.
Project Cost: 76 Billion US Dollars

JOB DESCRIPTION:
• Lead and coordinate Quality related activities on projects, perform quality management evaluation of contractors and vendors by assessment & bid evaluation.
• Perform site supervision, inspection, and supervised the activities perform by QA/QC Engineers and Inspectors.
• Check electrical scope of work and Procedure submitted by the sub-contractor.
• Review other design drawings made by Aramco Design Department.
• Supervise, monitor and inspect electrical works perform by the construction group whether it conform to approved construction drawing, specification and international standard.
• Monitoring the necessary documentation like RFI Forms, log book entries, two weeks look ahead, inspection schedule and supervision.
• Ensure proper filling of documents checking and reviewing construction AFC Drawing to verify if it is conform to project specification.
• Witness all test to be performed on Sub-Station such as low voltage, medium voltage, high voltage switch gear, control gear, gas insulated switch gear.

SENIOR ELECTRICAL ENGINEER/PROJECT ENGINEER at APTC CONSTRUCTION COMPANY LTD
  • January 2002 to January 2006

• More than twenty nine (29) years experiences in electrical engineering design, planning, scheduling, construction, supervision, and site inspection of substation, 133Kv to 233Kv very high voltage power Sub - Station, Overhead Transmission line, Gas, Oil Plant, Gas Turbine power plant, nuclear power plants, high rise buildings, villas and commercial buildings in Saudi Arabia and in the Philippines.
WORK EXPERIENCES (Pls. include all your Employment History)
COMPANY: SRACO
POSITION: QA/QC.COORDINATOR
DURATION: 2012-PRESENT
LOCATION: DHARAN, ABQAIQ, UDALLAH, KURSANIYAH, RASTANURA, RIYADH, JEDDAH, JUBAIL.

COMPANY PROFILE: SRACO CONSULTING COMPANY IS ONE OF THE LEADING ENGINEERING CONSULTING FIRM IN SAUDI ARAMCO FOR OIL, GAS, PETROCHEMICAL, LNG, BUILDING CONSTRUCTION, PLANNING, DESIGN, INSPECTION AND SUPERVISION IN ALL ARAMCO TECHNICAL PROJECT.

JOB DESCRIPTION: • Development, implementation and maintaining quality management system.
• Performing assessment of quality management system to determine whether quality activities are implemented effectively.
• Reviewing quality document submittal of project contractors, and monitoring quality activities at all stage of the project.
• Preparing Quality Progress inspection report.
• Scheduling quality audit and Quality management system in accordance with the requirements of ISO 9000 and 9001


COMPANY: HYUNDAI/MEEDCO ENGINEERING CO.LTD.
POSITION: QA/QC.SUPERVISOR (ELECTRICAL)
DURATION: JUNE 2010 -NOV. 2011
LOCATION: KURSANIYAH, MANIFA, GAS, OIL, PETROCHEM ARAMCO PROJECT

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

HYUNDAI/MEEDCO CO. is one of the leading Engineering Construction Company for Oil, Gas, Petrochem -LNG management and procurement, suppliers of high voltage transformer, Gas Insulated Switchgear, architects, Building construction and other technical projects for Aramco / Sceco projects.

PROJECT HANDLED:
þ Aramco Project
Kursaniyah /Manifa and Jubail Saudi Arabia

• Construction of Oil, Gas, Petrochem- LNG Plant such as offices, executive training centers, recreation building, medical facilities and staff housing. and Medium/High Voltage Sub-Station Project.
• Construction of electrical facilities such as power house, Electrical building, Communication building, Outdoor Sub Stations, HVAC building and Pump station.
• Installation of Outdoor Power, Telephone, Data and Communication cables.
Project Cost: 76 Billion US Dollars

JOB DESCRIPTION:
• Lead and coordinate Quality related activities on projects, perform quality management evaluation of contractors and vendors by assessment & bid evaluation.
• Perform site supervision, inspection, and supervised the activities perform by QA/QC Engineers and Inspectors.
• Check electrical scope of work and Procedure submitted by the sub-contractor.
• Review other design drawings made by Aramco Design Department.
• Supervise, monitor and inspect electrical works perform by the construction group whether it conform to approved construction drawing, specification and international standard.
• Monitoring the necessary documentation like RFI Forms, log book entries, two weeks look ahead, inspection schedule and supervision.
• Ensure proper filling of documents checking and reviewing construction AFC Drawing to verify if it is conform to project specification.
• Witness all test to be performed on Sub-Station such as low voltage, medium voltage, high voltage switch gear, control gear, gas insulated switch gear.

SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER at TAMIMI CONSTRUCTION COMPANY
  • January 1999 to January 2001
PROJECT SITE ENGINEER /COST ENGINEER at AL HUSSAINI AND SONS
  • January 1995 to January 1998

• More than twenty nine (29) years experiences in electrical engineering design, planning, scheduling, construction, supervision, and site inspection of substation, 133Kv to 233Kv very high voltage power Sub - Station, Overhead Transmission line, Gas, Oil Plant, Gas Turbine power plant, nuclear power plants, high rise buildings, villas and commercial buildings in Saudi Arabia and in the Philippines.
WORK EXPERIENCES (Pls. include all your Employment History)
COMPANY: SRACO
POSITION: QA/QC.COORDINATOR
DURATION: 2012-PRESENT
LOCATION: DHARAN, ABQAIQ, UDALLAH, KURSANIYAH, RASTANURA, RIYADH, JEDDAH, JUBAIL.

COMPANY PROFILE: SRACO CONSULTING COMPANY IS ONE OF THE LEADING ENGINEERING CONSULTING FIRM IN SAUDI ARAMCO FOR OIL, GAS, PETROCHEMICAL, LNG, BUILDING CONSTRUCTION, PLANNING, DESIGN, INSPECTION AND SUPERVISION IN ALL ARAMCO TECHNICAL PROJECT.

JOB DESCRIPTION: • Development, implementation and maintaining quality management system.
• Performing assessment of quality management system to determine whether quality activities are implemented effectively.
• Reviewing quality document submittal of project contractors, and monitoring quality activities at all stage of the project.
• Preparing Quality Progress inspection report.
• Scheduling quality audit and Quality management system in accordance with the requirements of ISO 9000 and 9001


COMPANY: HYUNDAI/MEEDCO ENGINEERING CO.LTD.
POSITION: QA/QC.SUPERVISOR (ELECTRICAL)
DURATION: JUNE 2010 -NOV. 2011
LOCATION: KURSANIYAH, MANIFA, GAS, OIL, PETROCHEM ARAMCO PROJECT

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

HYUNDAI/MEEDCO CO. is one of the leading Engineering Construction Company for Oil, Gas, Petrochem -LNG management and procurement, suppliers of high voltage transformer, Gas Insulated Switchgear, architects, Building construction and other technical projects for Aramco / Sceco projects.

PROJECT HANDLED:
þ Aramco Project
Kursaniyah /Manifa and Jubail Saudi Arabia

• Construction of Oil, Gas, Petrochem- LNG Plant such as offices, executive training centers, recreation building, medical facilities and staff housing. and Medium/High Voltage Sub-Station Project.
• Construction of electrical facilities such as power house, Electrical building, Communication building, Outdoor Sub Stations, HVAC building and Pump station.
• Installation of Outdoor Power, Telephone, Data and Communication cables.
Project Cost: 76 Billion US Dollars

JOB DESCRIPTION:
• Lead and coordinate Quality related activities on projects, perform quality management evaluation of contractors and vendors by assessment & bid evaluation.
• Perform site supervision, inspection, and supervised the activities perform by QA/QC Engineers and Inspectors.
• Check electrical scope of work and Procedure submitted by the sub-contractor.
• Review other design drawings made by Aramco Design Department.
• Supervise, monitor and inspect electrical works perform by the construction group whether it conform to approved construction drawing, specification and international standard.
• Monitoring the necessary documentation like RFI Forms, log book entries, two weeks look ahead, inspection schedule and supervision.
• Ensure proper filling of documents checking and reviewing construction AFC Drawing to verify if it is conform to project specification.
• Witness all test to be performed on Sub-Station such as low voltage, medium voltage, high voltage switch gear, control gear, gas insulated switch gear.

PROJECT SITE ENGINEER / MAINTENANCE ENGINEER at RETZER ENGINEERING COMPANY LTD
  • January 1988 to January 1994

• More than twenty nine (29) years experiences in electrical engineering design, planning, scheduling, construction, supervision, and site inspection of substation, 133Kv to 233Kv very high voltage power Sub - Station, Overhead Transmission line, Gas, Oil Plant, Gas Turbine power plant, nuclear power plants, high rise buildings, villas and commercial buildings in Saudi Arabia and in the Philippines.
WORK EXPERIENCES (Pls. include all your Employment History)
COMPANY: SRACO
POSITION: QA/QC.COORDINATOR
DURATION: 2012-PRESENT
LOCATION: DHARAN, ABQAIQ, UDALLAH, KURSANIYAH, RASTANURA, RIYADH, JEDDAH, JUBAIL.

COMPANY PROFILE: SRACO CONSULTING COMPANY IS ONE OF THE LEADING ENGINEERING CONSULTING FIRM IN SAUDI ARAMCO FOR OIL, GAS, PETROCHEMICAL, LNG, BUILDING CONSTRUCTION, PLANNING, DESIGN, INSPECTION AND SUPERVISION IN ALL ARAMCO TECHNICAL PROJECT.

JOB DESCRIPTION: • Development, implementation and maintaining quality management system.
• Performing assessment of quality management system to determine whether quality activities are implemented effectively.
• Reviewing quality document submittal of project contractors, and monitoring quality activities at all stage of the project.
• Preparing Quality Progress inspection report.
• Scheduling quality audit and Quality management system in accordance with the requirements of ISO 9000 and 9001


COMPANY: HYUNDAI/MEEDCO ENGINEERING CO.LTD.
POSITION: QA/QC.SUPERVISOR (ELECTRICAL)
DURATION: JUNE 2010 -NOV. 2011
LOCATION: KURSANIYAH, MANIFA, GAS, OIL, PETROCHEM ARAMCO PROJECT

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

HYUNDAI/MEEDCO CO. is one of the leading Engineering Construction Company for Oil, Gas, Petrochem -LNG management and procurement, suppliers of high voltage transformer, Gas Insulated Switchgear, architects, Building construction and other technical projects for Aramco / Sceco projects.

PROJECT HANDLED:
þ Aramco Project
Kursaniyah /Manifa and Jubail Saudi Arabia

• Construction of Oil, Gas, Petrochem- LNG Plant such as offices, executive training centers, recreation building, medical facilities and staff housing. and Medium/High Voltage Sub-Station Project.
• Construction of electrical facilities such as power house, Electrical building, Communication building, Outdoor Sub Stations, HVAC building and Pump station.
• Installation of Outdoor Power, Telephone, Data and Communication cables.
Project Cost: 76 Billion US Dollars

JOB DESCRIPTION:
• Lead and coordinate Quality related activities on projects, perform quality management evaluation of contractors and vendors by assessment & bid evaluation.
• Perform site supervision, inspection, and supervised the activities perform by QA/QC Engineers and Inspectors.
• Check electrical scope of work and Procedure submitted by the sub-contractor.
• Review other design drawings made by Aramco Design Department.
• Supervise, monitor and inspect electrical works perform by the construction group whether it conform to approved construction drawing, specification and international standard.
• Monitoring the necessary documentation like RFI Forms, log book entries, two weeks look ahead, inspection schedule and supervision.
• Ensure proper filling of documents checking and reviewing construction AFC Drawing to verify if it is conform to project specification.
• Witness all test to be performed on Sub-Station such as low voltage, medium voltage, high voltage switch gear, control gear, gas insulated switch gear.

ELECTRICAL ENGINEER / SUPERVISOR at D- ENGRESSO CONSTRUCTION COMPANY
  • January 1984 to January 1986

• More than twenty nine (29) years experiences in electrical engineering design, planning, scheduling, construction, supervision, and site inspection of substation, 133Kv to 233Kv very high voltage power Sub - Station, Overhead Transmission line, Gas, Oil Plant, Gas Turbine power plant, nuclear power plants, high rise buildings, villas and commercial buildings in Saudi Arabia and in the Philippines.
WORK EXPERIENCES (Pls. include all your Employment History)
COMPANY: SRACO
POSITION: QA/QC.COORDINATOR
DURATION: 2012-PRESENT
LOCATION: DHARAN, ABQAIQ, UDALLAH, KURSANIYAH, RASTANURA, RIYADH, JEDDAH, JUBAIL.

COMPANY PROFILE: SRACO CONSULTING COMPANY IS ONE OF THE LEADING ENGINEERING CONSULTING FIRM IN SAUDI ARAMCO FOR OIL, GAS, PETROCHEMICAL, LNG, BUILDING CONSTRUCTION, PLANNING, DESIGN, INSPECTION AND SUPERVISION IN ALL ARAMCO TECHNICAL PROJECT.

JOB DESCRIPTION: • Development, implementation and maintaining quality management system.
• Performing assessment of quality management system to determine whether quality activities are implemented effectively.
• Reviewing quality document submittal of project contractors, and monitoring quality activities at all stage of the project.
• Preparing Quality Progress inspection report.
• Scheduling quality audit and Quality management system in accordance with the requirements of ISO 9000 and 9001


COMPANY: HYUNDAI/MEEDCO ENGINEERING CO.LTD.
POSITION: QA/QC.SUPERVISOR (ELECTRICAL)
DURATION: JUNE 2010 -NOV. 2011
LOCATION: KURSANIYAH, MANIFA, GAS, OIL, PETROCHEM ARAMCO PROJECT

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

HYUNDAI/MEEDCO CO. is one of the leading Engineering Construction Company for Oil, Gas, Petrochem -LNG management and procurement, suppliers of high voltage transformer, Gas Insulated Switchgear, architects, Building construction and other technical projects for Aramco / Sceco projects.

PROJECT HANDLED:
þ Aramco Project
Kursaniyah /Manifa and Jubail Saudi Arabia

• Construction of Oil, Gas, Petrochem- LNG Plant such as offices, executive training centers, recreation building, medical facilities and staff housing. and Medium/High Voltage Sub-Station Project.
• Construction of electrical facilities such as power house, Electrical building, Communication building, Outdoor Sub Stations, HVAC building and Pump station.
• Installation of Outdoor Power, Telephone, Data and Communication cables.
Project Cost: 76 Billion US Dollars

JOB DESCRIPTION:
• Lead and coordinate Quality related activities on projects, perform quality management evaluation of contractors and vendors by assessment & bid evaluation.
• Perform site supervision, inspection, and supervised the activities perform by QA/QC Engineers and Inspectors.
• Check electrical scope of work and Procedure submitted by the sub-contractor.
• Review other design drawings made by Aramco Design Department.
• Supervise, monitor and inspect electrical works perform by the construction group whether it conform to approved construction drawing, specification and international standard.
• Monitoring the necessary documentation like RFI Forms, log book entries, two weeks look ahead, inspection schedule and supervision.
• Ensure proper filling of documents checking and reviewing construction AFC Drawing to verify if it is conform to project specification.
• Witness all test to be performed on Sub-Station such as low voltage, medium voltage, high voltage switch gear, control gear, gas insulated switch gear.

PLANT ENGINEER at HYDRO RESOURCES CONTRACTORS CORPORATION
  • January 1978 to January 1986

• More than twenty nine (29) years experiences in electrical engineering design, planning, scheduling, construction, supervision, and site inspection of substation, 133Kv to 233Kv very high voltage power Sub - Station, Overhead Transmission line, Gas, Oil Plant, Gas Turbine power plant, nuclear power plants, high rise buildings, villas and commercial buildings in Saudi Arabia and in the Philippines.
WORK EXPERIENCES (Pls. include all your Employment History)
COMPANY: SRACO
POSITION: QA/QC.COORDINATOR
DURATION: 2012-PRESENT
LOCATION: DHARAN, ABQAIQ, UDALLAH, KURSANIYAH, RASTANURA, RIYADH, JEDDAH, JUBAIL.

COMPANY PROFILE: SRACO CONSULTING COMPANY IS ONE OF THE LEADING ENGINEERING CONSULTING FIRM IN SAUDI ARAMCO FOR OIL, GAS, PETROCHEMICAL, LNG, BUILDING CONSTRUCTION, PLANNING, DESIGN, INSPECTION AND SUPERVISION IN ALL ARAMCO TECHNICAL PROJECT.

JOB DESCRIPTION: • Development, implementation and maintaining quality management system.
• Performing assessment of quality management system to determine whether quality activities are implemented effectively.
• Reviewing quality document submittal of project contractors, and monitoring quality activities at all stage of the project.
• Preparing Quality Progress inspection report.
• Scheduling quality audit and Quality management system in accordance with the requirements of ISO 9000 and 9001


COMPANY: HYUNDAI/MEEDCO ENGINEERING CO.LTD.
POSITION: QA/QC.SUPERVISOR (ELECTRICAL)
DURATION: JUNE 2010 -NOV. 2011
LOCATION: KURSANIYAH, MANIFA, GAS, OIL, PETROCHEM ARAMCO PROJECT

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

HYUNDAI/MEEDCO CO. is one of the leading Engineering Construction Company for Oil, Gas, Petrochem -LNG management and procurement, suppliers of high voltage transformer, Gas Insulated Switchgear, architects, Building construction and other technical projects for Aramco / Sceco projects.

PROJECT HANDLED:
þ Aramco Project
Kursaniyah /Manifa and Jubail Saudi Arabia

• Construction of Oil, Gas, Petrochem- LNG Plant such as offices, executive training centers, recreation building, medical facilities and staff housing. and Medium/High Voltage Sub-Station Project.
• Construction of electrical facilities such as power house, Electrical building, Communication building, Outdoor Sub Stations, HVAC building and Pump station.
• Installation of Outdoor Power, Telephone, Data and Communication cables.
Project Cost: 76 Billion US Dollars

JOB DESCRIPTION:
• Lead and coordinate Quality related activities on projects, perform quality management evaluation of contractors and vendors by assessment & bid evaluation.
• Perform site supervision, inspection, and supervised the activities perform by QA/QC Engineers and Inspectors.
• Check electrical scope of work and Procedure submitted by the sub-contractor.
• Review other design drawings made by Aramco Design Department.
• Supervise, monitor and inspect electrical works perform by the construction group whether it conform to approved construction drawing, specification and international standard.
• Monitoring the necessary documentation like RFI Forms, log book entries, two weeks look ahead, inspection schedule and supervision.
• Ensure proper filling of documents checking and reviewing construction AFC Drawing to verify if it is conform to project specification.
• Witness all test to be performed on Sub-Station such as low voltage, medium voltage, high voltage switch gear, control gear, gas insulated switch gear.

at National Power Corporation
  • August 1984 to November 1984

National Power Corporation
August 1984 - November 1984
COMPUTER LITERACY
þ MS excel word, MS Power Point, Micro Station.

at Hydro Power Plant Safety Council
  • November 1980 to December 1980

Hydro Power Plant Safety Council
November 1980 - December1980
þ Certificate of Attendance First Aid Training Course
Hydro Power Plant Safety Council
November 1980 - December 1980
þ Certificate of Attendance for Power Plant Engineering Course

CADET ENGINEER/ QC INSPECTOR at MITSUBISHI ELECTRIC CO./ 3-D INDUSTRIES CO. INC
  • Philippines
  • January 1976 to January 1978

COMPANY: MITSUBISHI ELECTRIC CO./ 3-D INDUSTRIES CO. INC.
POSITION: CADET ENGINEER/ QC INSPECTOR
DURATION: 1976-1978
LOCATION: PASIG CITY, MANILA, PHILIPPINES

COMPANY PROFILE: MITSUBISHI AND 3-D INDUSTRIES COMPANY IS ONE OF THE LEADING INDUSTRIES COMPANY FOR THE PRODUCTION OF ELECTRIC MOTOR, PUMPS, CONTACTOR, GENERATORS, ELECTRIC FANS, AND CONTROL SYSTEM.

PROJECT HANDLED: Upgrade government offices, Commercial buildings, and supply all Electrical/Mechanical Equipment, in the Philippines.

PROJECT COST: 1.5 MILLION US. DOLLAR
JOB DESCRIPTION: • Assist in the supervision of all Electrical And Electronics Products to be installed in various Project.
• Cautiously check Electrical, Electronics, Equipment to be Packed for delivery in various project.
• In charge in the overall Quality Inspection by using Ground fault Detector, Short Circuit Detector, for Generator, Electric Motor, and Heavy Duty Compressor.
• Prepare updated report, and Prepare Quality Report for Electrical, and Electronics Products.
• Assist in the supervision of Servicing Electrical, Electronics Control, AC/DC. Motors, Drum Switch and Magnetic Switch, Magnetic contactor.

TRAININGS AND SEMINARS ATTENDED (Pls include all your Trainings & Seminars Attended)
þ Certificate of Attendance for Loss Control Management

QA/QC.COORDINATOR at SRACO
  • Saudi Arabia
  • to

• More than twenty nine (29) years experiences in electrical engineering design, planning, scheduling, construction, supervision, and site inspection of substation, 133Kv to 233Kv very high voltage power Sub - Station, Overhead Transmission line, Gas, Oil Plant, Gas Turbine power plant, nuclear power plants, high rise buildings, villas and commercial buildings in Saudi Arabia and in the Philippines.
WORK EXPERIENCES (Pls. include all your Employment History)

QA/QC.COORDINATOR at HYUNDAI/MEEDCO ENGINEERING CO.LTD
  • to

POSITION: QA/QC.COORDINATOR
DURATION: 2012-PRESENT
LOCATION: DHARAN, ABQAIQ, UDALLAH, KURSANIYAH, RASTANURA, RIYADH, JEDDAH, JUBAIL.

COMPANY PROFILE: SRACO CONSULTING COMPANY IS ONE OF THE LEADING ENGINEERING CONSULTING FIRM IN SAUDI ARAMCO FOR OIL, GAS, PETROCHEMICAL, LNG, BUILDING CONSTRUCTION, PLANNING, DESIGN, INSPECTION AND SUPERVISION IN ALL ARAMCO TECHNICAL PROJECT.

JOB DESCRIPTION: • Development, implementation and maintaining quality management system.
• Performing assessment of quality management system to determine whether quality activities are implemented effectively.
• Reviewing quality document submittal of project contractors, and monitoring quality activities at all stage of the project.
• Preparing Quality Progress inspection report.
• Scheduling quality audit and Quality management system in accordance with the requirements of ISO 9000 and 9001

QA/QC.COORDINATOR at MAN FERROUSTAL INDUSTRELANGEN OIL AND GAS LTD
  • India
  • to

POSITION: QA/QC.COORDINATOR
DURATION: 2012-PRESENT
LOCATION: DHARAN, ABQAIQ, UDALLAH, KURSANIYAH, RASTANURA, RIYADH, JEDDAH, JUBAIL.

COMPANY PROFILE: SRACO CONSULTING COMPANY IS ONE OF THE LEADING ENGINEERING CONSULTING FIRM IN SAUDI ARAMCO FOR OIL, GAS, PETROCHEMICAL, LNG, BUILDING CONSTRUCTION, PLANNING, DESIGN, INSPECTION AND SUPERVISION IN ALL ARAMCO TECHNICAL PROJECT.

JOB DESCRIPTION: • Development, implementation and maintaining quality management system.
• Performing assessment of quality management system to determine whether quality activities are implemented effectively.
• Reviewing quality document submittal of project contractors, and monitoring quality activities at all stage of the project.
• Preparing Quality Progress inspection report.
• Scheduling quality audit and Quality management system in accordance with the requirements of ISO 9000 and 9001


COMPANY: HYUNDAI/MEEDCO ENGINEERING CO.LTD.
POSITION: QA/QC.SUPERVISOR (ELECTRICAL)
DURATION: JUNE 2010 -NOV. 2011
LOCATION: KURSANIYAH, MANIFA, GAS, OIL, PETROCHEM ARAMCO PROJECT

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

HYUNDAI/MEEDCO CO. is one of the leading Engineering Construction Company for Oil, Gas, Petrochem -LNG management and procurement, suppliers of high voltage transformer, Gas Insulated Switchgear, architects, Building construction and other technical projects for Aramco / Sceco projects.

PROJECT HANDLED:
þ Aramco Project
Kursaniyah /Manifa and Jubail Saudi Arabia

• Construction of Oil, Gas, Petrochem- LNG Plant such as offices, executive training centers, recreation building, medical facilities and staff housing. and Medium/High Voltage Sub-Station Project.
• Construction of electrical facilities such as power house, Electrical building, Communication building, Outdoor Sub Stations, HVAC building and Pump station.
• Installation of Outdoor Power, Telephone, Data and Communication cables.
Project Cost: 76 Billion US Dollars

JOB DESCRIPTION:
• Lead and coordinate Quality related activities on projects, perform quality management evaluation of contractors and vendors by assessment & bid evaluation.
• Perform site supervision, inspection, and supervised the activities perform by QA/QC Engineers and Inspectors.
• Check electrical scope of work and Procedure submitted by the sub-contractor.
• Review other design drawings made by Aramco Design Department.
• Supervise, monitor and inspect electrical works perform by the construction group whether it conform to approved construction drawing, specification and international standard.
• Monitoring the necessary documentation like RFI Forms, log book entries, two weeks look ahead, inspection schedule and supervision.
• Ensure proper filling of documents checking and reviewing construction AFC Drawing to verify if it is conform to project specification.
• Witness all test to be performed on Sub-Station such as low voltage, medium voltage, high voltage switch gear, control gear, gas insulated switch gear.
• Preparation of documents prior to mechanical completion like Energization package, Loop packages, and Punch list.

QA/QC LEAD ENGINEER (ELECTRICAL) at IMAD CO. FOR TRADING AND CONTRACTING CO
  • India
  • to

• Preparation of documents prior to mechanical completion like Energization package, Loop packages, and Punch list.

COMPANY: MAN FERROUSTAL INDUSTRELANGEN OIL AND GAS LTD.
POSITION: QA/QC LEAD ENGINEER (ELECTRICAL)
DURATION: 2008-2009
LOCATION: TRIPOLI LYBIA, BENGGASIH, WINTERSHALL, SAHARAH DESERT.

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

MAN FERROSTAL is one of the leading German industrial engineering company manage by Germany consulting firm, which build Gas/Oil/LNG Plant Building hotels and gas plant facilities.

PROJECT HANDLED:
• Wintershalll / Mellitah Gas/Oil/LNG Project Eastern Province OF LYBIA

• Construction of Gas/Oil/LNG Project of wintershall and mellitah plant located at Saharah desert.
• Construction of buildings, electrical facilities, such as Low voltage and Medium voltage sub-station, installation of pipe rack, cable trays and all communication equipment.

Project Cost: 130 Million US Dollars
JOB DESCRIPTION: • Project site inspection and supervised the activities perform by the Qa/Qc. Engineer, and inspector.
• Developing scope of work of all project activities.
• Ensure that latest approved technologies are applied and compliance with applicable quality & integrity standards.
• Develop and manage emergency plans, and procedures to cover the various stage of the project.
• Supervise and approved the development of contractor and review contractors document control system and design additional elements required by the consultants.
• Responsible for maintaining proper Quality control throughout the project and Preparing necessary documents like two weeks look ahead inspection schedule and monitoring.
• Review the approved work procedure for electrical and instrumentation communication, installation activities which includes instrument calibration.
• Provide leadership and guidance Quality Control activities.
• Participate actively in the Quality Assurance program for suppliers, and Provide leadership in non-conforming materials for handling and preservation.
• Preparation of complete documents prior to mechanical completion.

QA/QC LEAD ENGINEER (ELECTRICAL) at APTC CONSTRUCTION COMPANY LTD
  • India
  • to

• Preparation of documents prior to mechanical completion like Energization package, Loop packages, and Punch list.

COMPANY: MAN FERROUSTAL INDUSTRELANGEN OIL AND GAS LTD.
POSITION: QA/QC LEAD ENGINEER (ELECTRICAL)
DURATION: 2008-2009
LOCATION: TRIPOLI LYBIA, BENGGASIH, WINTERSHALL, SAHARAH DESERT.

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

MAN FERROSTAL is one of the leading German industrial engineering company manage by Germany consulting firm, which build Gas/Oil/LNG Plant Building hotels and gas plant facilities.

PROJECT HANDLED:
• Wintershalll / Mellitah Gas/Oil/LNG Project Eastern Province OF LYBIA

• Construction of Gas/Oil/LNG Project of wintershall and mellitah plant located at Saharah desert.
• Construction of buildings, electrical facilities, such as Low voltage and Medium voltage sub-station, installation of pipe rack, cable trays and all communication equipment.

Project Cost: 130 Million US Dollars
JOB DESCRIPTION: • Project site inspection and supervised the activities perform by the Qa/Qc. Engineer, and inspector.
• Developing scope of work of all project activities.
• Ensure that latest approved technologies are applied and compliance with applicable quality & integrity standards.
• Develop and manage emergency plans, and procedures to cover the various stage of the project.
• Supervise and approved the development of contractor and review contractors document control system and design additional elements required by the consultants.
• Responsible for maintaining proper Quality control throughout the project and Preparing necessary documents like two weeks look ahead inspection schedule and monitoring.
• Review the approved work procedure for electrical and instrumentation communication, installation activities which includes instrument calibration.
• Provide leadership and guidance Quality Control activities.
• Participate actively in the Quality Assurance program for suppliers, and Provide leadership in non-conforming materials for handling and preservation.
• Preparation of complete documents prior to mechanical completion.


COMPANY: IMAD CO. FOR TRADING AND CONTRACTING CO.
POSITION: QA/QC ENGINEER/MANAGER
DURATION; 2007-2008
LOCATION: DHARAN, ABQAIQ, RASTANURAH

COMPANY PROFILE: IMAD COMPANY Is the one leading construction company for oil/gas/petro chemical, Building, & Substation for industrial and electro mechanical project in ARAMCO EAST & WEST AREA in the province of Saudi Arabia.

PROJECT HANDLED:
ARAMCO PROJECT EASTERN PROVINCE

• Upgrade of Aramco facilities such as Offices and Upgrade on Electrical Sub-station 33 kv to 69kv overhead Gantry tower Line also includes upgrading all electrical sub -station in the whole Abqaiq plant.

PROJECT COST: 56 MILLION US DOLLAR
JOB DESCRIPTION: • Preparing quality progress inspection report with bar chart percentage.
• Every day conduct site inspection together with Qc Engineer and check the activities perform by the construction group whether it conform to Aramco standard, international standard.
• Review project procedure, AFC drawing which is approved by Aramco and check if there is any discrepancy regarding the drawing and procedure and should be coordinated to the client.
• Monitoring QA/QC. Engineer and inspector at site and their daily routine activities which includes daily /weekly report.
• Monitoring all quality documents, ensuring proper filling of documents checking and reviewing construction sketches and AFC drawing to verify it conform to project specification.
• Check tie in and shut down packages, all materials should be available or ready before the tie in shut-down.
• Preparing of documents for inclusion in the operation manuals.
• Preparing of all original documents for testing to support the completion of the project as per testing pre commissioning and final commissioning.
• Attending weekly meeting at Saudi Aramco inspection office discussing the implementation of work and discrepancy of the work done in the project site.

SENIOR ELECTRICAL ENGINEER/PROJECT ENGINEER at TAMIMI CONSTRUCTION COMPANY
  • India
  • to

• Preparation of documents prior to mechanical completion like Energization package, Loop packages, and Punch list.

COMPANY: MAN FERROUSTAL INDUSTRELANGEN OIL AND GAS LTD.
POSITION: QA/QC LEAD ENGINEER (ELECTRICAL)
DURATION: 2008-2009
LOCATION: TRIPOLI LYBIA, BENGGASIH, WINTERSHALL, SAHARAH DESERT.

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

MAN FERROSTAL is one of the leading German industrial engineering company manage by Germany consulting firm, which build Gas/Oil/LNG Plant Building hotels and gas plant facilities.

PROJECT HANDLED:
• Wintershalll / Mellitah Gas/Oil/LNG Project Eastern Province OF LYBIA

• Construction of Gas/Oil/LNG Project of wintershall and mellitah plant located at Saharah desert.
• Construction of buildings, electrical facilities, such as Low voltage and Medium voltage sub-station, installation of pipe rack, cable trays and all communication equipment.

Project Cost: 130 Million US Dollars
JOB DESCRIPTION: • Project site inspection and supervised the activities perform by the Qa/Qc. Engineer, and inspector.
• Developing scope of work of all project activities.
• Ensure that latest approved technologies are applied and compliance with applicable quality & integrity standards.
• Develop and manage emergency plans, and procedures to cover the various stage of the project.
• Supervise and approved the development of contractor and review contractors document control system and design additional elements required by the consultants.
• Responsible for maintaining proper Quality control throughout the project and Preparing necessary documents like two weeks look ahead inspection schedule and monitoring.
• Review the approved work procedure for electrical and instrumentation communication, installation activities which includes instrument calibration.
• Provide leadership and guidance Quality Control activities.
• Participate actively in the Quality Assurance program for suppliers, and Provide leadership in non-conforming materials for handling and preservation.
• Preparation of complete documents prior to mechanical completion.


COMPANY: IMAD CO. FOR TRADING AND CONTRACTING CO.
POSITION: QA/QC ENGINEER/MANAGER
DURATION; 2007-2008
LOCATION: DHARAN, ABQAIQ, RASTANURAH

COMPANY PROFILE: IMAD COMPANY Is the one leading construction company for oil/gas/petro chemical, Building, & Substation for industrial and electro mechanical project in ARAMCO EAST & WEST AREA in the province of Saudi Arabia.

PROJECT HANDLED:
ARAMCO PROJECT EASTERN PROVINCE

• Upgrade of Aramco facilities such as Offices and Upgrade on Electrical Sub-station 33 kv to 69kv overhead Gantry tower Line also includes upgrading all electrical sub -station in the whole Abqaiq plant.

PROJECT COST: 56 MILLION US DOLLAR
JOB DESCRIPTION: • Preparing quality progress inspection report with bar chart percentage.
• Every day conduct site inspection together with Qc Engineer and check the activities perform by the construction group whether it conform to Aramco standard, international standard.
• Review project procedure, AFC drawing which is approved by Aramco and check if there is any discrepancy regarding the drawing and procedure and should be coordinated to the client.
• Monitoring QA/QC. Engineer and inspector at site and their daily routine activities which includes daily /weekly report.
• Monitoring all quality documents, ensuring proper filling of documents checking and reviewing construction sketches and AFC drawing to verify it conform to project specification.
• Check tie in and shut down packages, all materials should be available or ready before the tie in shut-down.
• Preparing of documents for inclusion in the operation manuals.
• Preparing of all original documents for testing to support the completion of the project as per testing pre commissioning and final commissioning.
• Attending weekly meeting at Saudi Aramco inspection office discussing the implementation of work and discrepancy of the work done in the project site.
COMPANY: APTC CONSTRUCTION COMPANY LTD.
POSITION: SENIOR ELECTRICAL ENGINEER/PROJECT ENGINEER
DURATION: 2002-2006
LOCATION: RASTANURAH, DHARAN, JUBAIL ROYAL COMISSION, ARAMCO PROJECT

COMPANY PROFILE:
APTC Company is one of the most leading construction company in Saudi Aramco and Royal Commission in Rastanura, Dharan, & Jubail for Oil/ Gas/ Petrochem/ LNG High Rise Building, Commercial Building, & Palaces, Which includes Low/ Medium/ High Voltage Substation.

PROJECT HANDLED:
• Construction of Commercial building and Low Voltage to Medium Voltage Sub-Station Project.
• Construction of new loading dock for oil and gas tanker, Rastanura mall, and upgrade security gate house including building structure.
• Upgrade of Sub-Station 33kv. To 69 kv power line with over head line in royal commission Gas plant.
• Construction of building offices and commercial building in Aramco Jubail for expansion project
• Construction of phase 3 Gas/OIL/LNG/ PLANT at Royal Commission Jubail project.

PROJECT COST: 163 MILLION DOLLAR
JOB DESCRIPTION:
• Establish suitable procedure for the project and rectification of defects during the site inspection.
• Carrying out design calculation.
• Review and comment design document.
• Knowledgeable in site supervision for the installation of 33kv/ 69kv /133kv/233kv sub-station which include all the installation and termination of power transformer, Ac/Dc UPS, Generator.
• Monitor all the installation of Electric Motors, pumps, ring main unit, Grounding, lighting power distribution and control system, Field Test equipment like Omicron primary and secondary injection kit, oil break down test kit, insulation test kit, Digital earth testing kit, high pot testing kit, Hart communication kit & other testing equipment.
• Prepare project related reports and monitor contractors project performance.
• Supervised and evaluate lay out plan for the project especially in substation electrical equipment.
• Conduct regular weekly meeting to advise Contractor, Sub contractor, regarding the flow of the works.
• Supervised and inspect electrical installation, modification testing and operation of electrical system.
• Prepare plans and schedule for the project.
• Review material specification and material requisition needs in the project.
• Preparing complete documents prior to mechanical completion of the projects.

SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER at RASTANURAH, ABQAIQ, PROJECT
  • to

• More than twenty nine (29) years experiences in electrical engineering design, planning, scheduling, construction, supervision, and site inspection of substation, 133Kv to 233Kv very high voltage power Sub - Station, Overhead Transmission line, Gas, Oil Plant, Gas Turbine power plant, nuclear power plants, high rise buildings, villas and commercial buildings in Saudi Arabia and in the Philippines.
WORK EXPERIENCES (Pls. include all your Employment History)
COMPANY: SRACO
POSITION: QA/QC.COORDINATOR
DURATION: 2012-PRESENT
LOCATION: DHARAN, ABQAIQ, UDALLAH, KURSANIYAH, RASTANURA, RIYADH, JEDDAH, JUBAIL.

COMPANY PROFILE: SRACO CONSULTING COMPANY IS ONE OF THE LEADING ENGINEERING CONSULTING FIRM IN SAUDI ARAMCO FOR OIL, GAS, PETROCHEMICAL, LNG, BUILDING CONSTRUCTION, PLANNING, DESIGN, INSPECTION AND SUPERVISION IN ALL ARAMCO TECHNICAL PROJECT.

JOB DESCRIPTION: • Development, implementation and maintaining quality management system.
• Performing assessment of quality management system to determine whether quality activities are implemented effectively.
• Reviewing quality document submittal of project contractors, and monitoring quality activities at all stage of the project.
• Preparing Quality Progress inspection report.
• Scheduling quality audit and Quality management system in accordance with the requirements of ISO 9000 and 9001


COMPANY: HYUNDAI/MEEDCO ENGINEERING CO.LTD.
POSITION: QA/QC.SUPERVISOR (ELECTRICAL)
DURATION: JUNE 2010 -NOV. 2011
LOCATION: KURSANIYAH, MANIFA, GAS, OIL, PETROCHEM ARAMCO PROJECT

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

HYUNDAI/MEEDCO CO. is one of the leading Engineering Construction Company for Oil, Gas, Petrochem -LNG management and procurement, suppliers of high voltage transformer, Gas Insulated Switchgear, architects, Building construction and other technical projects for Aramco / Sceco projects.

PROJECT HANDLED:
þ Aramco Project
Kursaniyah /Manifa and Jubail Saudi Arabia

• Construction of Oil, Gas, Petrochem- LNG Plant such as offices, executive training centers, recreation building, medical facilities and staff housing. and Medium/High Voltage Sub-Station Project.
• Construction of electrical facilities such as power house, Electrical building, Communication building, Outdoor Sub Stations, HVAC building and Pump station.
• Installation of Outdoor Power, Telephone, Data and Communication cables.
Project Cost: 76 Billion US Dollars

JOB DESCRIPTION:
• Lead and coordinate Quality related activities on projects, perform quality management evaluation of contractors and vendors by assessment & bid evaluation.
• Perform site supervision, inspection, and supervised the activities perform by QA/QC Engineers and Inspectors.
• Check electrical scope of work and Procedure submitted by the sub-contractor.
• Review other design drawings made by Aramco Design Department.
• Supervise, monitor and inspect electrical works perform by the construction group whether it conform to approved construction drawing, specification and international standard.
• Monitoring the necessary documentation like RFI Forms, log book entries, two weeks look ahead, inspection schedule and supervision.
• Ensure proper filling of documents checking and reviewing construction AFC Drawing to verify if it is conform to project specification.
• Witness all test to be performed on Sub-Station such as low voltage, medium voltage, high voltage switch gear, control gear, gas insulated switch gear.

SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER at AL HUSSAINI AND SONS
  • India
  • to

• Preparation of documents prior to mechanical completion like Energization package, Loop packages, and Punch list.

COMPANY: MAN FERROUSTAL INDUSTRELANGEN OIL AND GAS LTD.
POSITION: QA/QC LEAD ENGINEER (ELECTRICAL)
DURATION: 2008-2009
LOCATION: TRIPOLI LYBIA, BENGGASIH, WINTERSHALL, SAHARAH DESERT.

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

MAN FERROSTAL is one of the leading German industrial engineering company manage by Germany consulting firm, which build Gas/Oil/LNG Plant Building hotels and gas plant facilities.

PROJECT HANDLED:
• Wintershalll / Mellitah Gas/Oil/LNG Project Eastern Province OF LYBIA

• Construction of Gas/Oil/LNG Project of wintershall and mellitah plant located at Saharah desert.
• Construction of buildings, electrical facilities, such as Low voltage and Medium voltage sub-station, installation of pipe rack, cable trays and all communication equipment.

Project Cost: 130 Million US Dollars
JOB DESCRIPTION: • Project site inspection and supervised the activities perform by the Qa/Qc. Engineer, and inspector.
• Developing scope of work of all project activities.
• Ensure that latest approved technologies are applied and compliance with applicable quality & integrity standards.
• Develop and manage emergency plans, and procedures to cover the various stage of the project.
• Supervise and approved the development of contractor and review contractors document control system and design additional elements required by the consultants.
• Responsible for maintaining proper Quality control throughout the project and Preparing necessary documents like two weeks look ahead inspection schedule and monitoring.
• Review the approved work procedure for electrical and instrumentation communication, installation activities which includes instrument calibration.
• Provide leadership and guidance Quality Control activities.
• Participate actively in the Quality Assurance program for suppliers, and Provide leadership in non-conforming materials for handling and preservation.
• Preparation of complete documents prior to mechanical completion.


COMPANY: IMAD CO. FOR TRADING AND CONTRACTING CO.
POSITION: QA/QC ENGINEER/MANAGER
DURATION; 2007-2008
LOCATION: DHARAN, ABQAIQ, RASTANURAH

COMPANY PROFILE: IMAD COMPANY Is the one leading construction company for oil/gas/petro chemical, Building, & Substation for industrial and electro mechanical project in ARAMCO EAST & WEST AREA in the province of Saudi Arabia.

PROJECT HANDLED:
ARAMCO PROJECT EASTERN PROVINCE

• Upgrade of Aramco facilities such as Offices and Upgrade on Electrical Sub-station 33 kv to 69kv overhead Gantry tower Line also includes upgrading all electrical sub -station in the whole Abqaiq plant.

PROJECT COST: 56 MILLION US DOLLAR
JOB DESCRIPTION: • Preparing quality progress inspection report with bar chart percentage.
• Every day conduct site inspection together with Qc Engineer and check the activities perform by the construction group whether it conform to Aramco standard, international standard.
• Review project procedure, AFC drawing which is approved by Aramco and check if there is any discrepancy regarding the drawing and procedure and should be coordinated to the client.
• Monitoring QA/QC. Engineer and inspector at site and their daily routine activities which includes daily /weekly report.
• Monitoring all quality documents, ensuring proper filling of documents checking and reviewing construction sketches and AFC drawing to verify it conform to project specification.
• Check tie in and shut down packages, all materials should be available or ready before the tie in shut-down.
• Preparing of documents for inclusion in the operation manuals.
• Preparing of all original documents for testing to support the completion of the project as per testing pre commissioning and final commissioning.
• Attending weekly meeting at Saudi Aramco inspection office discussing the implementation of work and discrepancy of the work done in the project site.
COMPANY: APTC CONSTRUCTION COMPANY LTD.
POSITION: SENIOR ELECTRICAL ENGINEER/PROJECT ENGINEER
DURATION: 2002-2006
LOCATION: RASTANURAH, DHARAN, JUBAIL ROYAL COMISSION, ARAMCO PROJECT

COMPANY PROFILE:
APTC Company is one of the most leading construction company in Saudi Aramco and Royal Commission in Rastanura, Dharan, & Jubail for Oil/ Gas/ Petrochem/ LNG High Rise Building, Commercial Building, & Palaces, Which includes Low/ Medium/ High Voltage Substation.

PROJECT HANDLED:
• Construction of Commercial building and Low Voltage to Medium Voltage Sub-Station Project.
• Construction of new loading dock for oil and gas tanker, Rastanura mall, and upgrade security gate house including building structure.
• Upgrade of Sub-Station 33kv. To 69 kv power line with over head line in royal commission Gas plant.
• Construction of building offices and commercial building in Aramco Jubail for expansion project
• Construction of phase 3 Gas/OIL/LNG/ PLANT at Royal Commission Jubail project.

PROJECT COST: 163 MILLION DOLLAR
JOB DESCRIPTION:
• Establish suitable procedure for the project and rectification of defects during the site inspection.
• Carrying out design calculation.
• Review and comment design document.
• Knowledgeable in site supervision for the installation of 33kv/ 69kv /133kv/233kv sub-station which include all the installation and termination of power transformer, Ac/Dc UPS, Generator.
• Monitor all the installation of Electric Motors, pumps, ring main unit, Grounding, lighting power distribution and control system, Field Test equipment like Omicron primary and secondary injection kit, oil break down test kit, insulation test kit, Digital earth testing kit, high pot testing kit, Hart communication kit & other testing equipment.
• Prepare project related reports and monitor contractors project performance.
• Supervised and evaluate lay out plan for the project especially in substation electrical equipment.
• Conduct regular weekly meeting to advise Contractor, Sub contractor, regarding the flow of the works.
• Supervised and inspect electrical installation, modification testing and operation of electrical system.
• Prepare plans and schedule for the project.
• Review material specification and material requisition needs in the project.
• Preparing complete documents prior to mechanical completion of the projects.


COMPANY: TAMIMI CONSTRUCTION COMPANY: POSITION: SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER
DURATION: 1999-2001
POSITION: SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER
LOCATION: RASTANURAH, ABQAIQ, PROJECT

COMPANY PROFILE: TAMIMI CONSTRUCTION COMPANY IS one of the leading construction company for Oil, Gas, Petrochem, LNG Plant, Building construction And Maintenance for eastern and western ARAMCO Project.

PROJECT HANDLED:
• Construction and modification of Sub-Station Low Voltage, Medium Voltage, To High Voltage which includes the new installation of Switch Gear, Control Gear, Ats, Power Transformer and distribution control system.
• Upgrade Aramco facilities such as commercial building, offices, and mechanical Piping installation.

PROJECT COST: 28 MILLION US. DOLLAR
JOB DESCRIPTION:
• Preparing project procedure and review project lay out plans.
• Conduct site inspection of horizontal and vertical electrical building construction.
• Evaluate the condition of the proposed plans involving the installation, termination testing and commissioning of electrical and communication equipment.
• In charge in the supervision of the installation of switch gear, control gear, switch board, remote terminal unit, switch racks, cable bus duct, automatic transfer switch, HV. transformer.
• Implementation of safe efficient system for the installation of high voltage overhead distribution power, which includes the installation of Gantry Structure, Transmission lines, surge arrester, capacitor banks, metering cabinet, overhead circuit accumulator, over load break switch, and fuse cut out.
• Preparing progress inspection report, discrepancy report, variation order, and review procedure for all instrument which are calibrated.
• Prepare the important documents and instrument using for testing, prior to support the mechanical completion of the project.

SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER at RETZER ENGINEERING COMPANY LTD
  • India
  • to

• Preparation of documents prior to mechanical completion like Energization package, Loop packages, and Punch list.

COMPANY: MAN FERROUSTAL INDUSTRELANGEN OIL AND GAS LTD.
POSITION: QA/QC LEAD ENGINEER (ELECTRICAL)
DURATION: 2008-2009
LOCATION: TRIPOLI LYBIA, BENGGASIH, WINTERSHALL, SAHARAH DESERT.

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

MAN FERROSTAL is one of the leading German industrial engineering company manage by Germany consulting firm, which build Gas/Oil/LNG Plant Building hotels and gas plant facilities.

PROJECT HANDLED:
• Wintershalll / Mellitah Gas/Oil/LNG Project Eastern Province OF LYBIA

• Construction of Gas/Oil/LNG Project of wintershall and mellitah plant located at Saharah desert.
• Construction of buildings, electrical facilities, such as Low voltage and Medium voltage sub-station, installation of pipe rack, cable trays and all communication equipment.

Project Cost: 130 Million US Dollars
JOB DESCRIPTION: • Project site inspection and supervised the activities perform by the Qa/Qc. Engineer, and inspector.
• Developing scope of work of all project activities.
• Ensure that latest approved technologies are applied and compliance with applicable quality & integrity standards.
• Develop and manage emergency plans, and procedures to cover the various stage of the project.
• Supervise and approved the development of contractor and review contractors document control system and design additional elements required by the consultants.
• Responsible for maintaining proper Quality control throughout the project and Preparing necessary documents like two weeks look ahead inspection schedule and monitoring.
• Review the approved work procedure for electrical and instrumentation communication, installation activities which includes instrument calibration.
• Provide leadership and guidance Quality Control activities.
• Participate actively in the Quality Assurance program for suppliers, and Provide leadership in non-conforming materials for handling and preservation.
• Preparation of complete documents prior to mechanical completion.


COMPANY: IMAD CO. FOR TRADING AND CONTRACTING CO.
POSITION: QA/QC ENGINEER/MANAGER
DURATION; 2007-2008
LOCATION: DHARAN, ABQAIQ, RASTANURAH

COMPANY PROFILE: IMAD COMPANY Is the one leading construction company for oil/gas/petro chemical, Building, & Substation for industrial and electro mechanical project in ARAMCO EAST & WEST AREA in the province of Saudi Arabia.

PROJECT HANDLED:
ARAMCO PROJECT EASTERN PROVINCE

• Upgrade of Aramco facilities such as Offices and Upgrade on Electrical Sub-station 33 kv to 69kv overhead Gantry tower Line also includes upgrading all electrical sub -station in the whole Abqaiq plant.

PROJECT COST: 56 MILLION US DOLLAR
JOB DESCRIPTION: • Preparing quality progress inspection report with bar chart percentage.
• Every day conduct site inspection together with Qc Engineer and check the activities perform by the construction group whether it conform to Aramco standard, international standard.
• Review project procedure, AFC drawing which is approved by Aramco and check if there is any discrepancy regarding the drawing and procedure and should be coordinated to the client.
• Monitoring QA/QC. Engineer and inspector at site and their daily routine activities which includes daily /weekly report.
• Monitoring all quality documents, ensuring proper filling of documents checking and reviewing construction sketches and AFC drawing to verify it conform to project specification.
• Check tie in and shut down packages, all materials should be available or ready before the tie in shut-down.
• Preparing of documents for inclusion in the operation manuals.
• Preparing of all original documents for testing to support the completion of the project as per testing pre commissioning and final commissioning.
• Attending weekly meeting at Saudi Aramco inspection office discussing the implementation of work and discrepancy of the work done in the project site.
COMPANY: APTC CONSTRUCTION COMPANY LTD.
POSITION: SENIOR ELECTRICAL ENGINEER/PROJECT ENGINEER
DURATION: 2002-2006
LOCATION: RASTANURAH, DHARAN, JUBAIL ROYAL COMISSION, ARAMCO PROJECT

COMPANY PROFILE:
APTC Company is one of the most leading construction company in Saudi Aramco and Royal Commission in Rastanura, Dharan, & Jubail for Oil/ Gas/ Petrochem/ LNG High Rise Building, Commercial Building, & Palaces, Which includes Low/ Medium/ High Voltage Substation.

PROJECT HANDLED:
• Construction of Commercial building and Low Voltage to Medium Voltage Sub-Station Project.
• Construction of new loading dock for oil and gas tanker, Rastanura mall, and upgrade security gate house including building structure.
• Upgrade of Sub-Station 33kv. To 69 kv power line with over head line in royal commission Gas plant.
• Construction of building offices and commercial building in Aramco Jubail for expansion project
• Construction of phase 3 Gas/OIL/LNG/ PLANT at Royal Commission Jubail project.

PROJECT COST: 163 MILLION DOLLAR
JOB DESCRIPTION:
• Establish suitable procedure for the project and rectification of defects during the site inspection.
• Carrying out design calculation.
• Review and comment design document.
• Knowledgeable in site supervision for the installation of 33kv/ 69kv /133kv/233kv sub-station which include all the installation and termination of power transformer, Ac/Dc UPS, Generator.
• Monitor all the installation of Electric Motors, pumps, ring main unit, Grounding, lighting power distribution and control system, Field Test equipment like Omicron primary and secondary injection kit, oil break down test kit, insulation test kit, Digital earth testing kit, high pot testing kit, Hart communication kit & other testing equipment.
• Prepare project related reports and monitor contractors project performance.
• Supervised and evaluate lay out plan for the project especially in substation electrical equipment.
• Conduct regular weekly meeting to advise Contractor, Sub contractor, regarding the flow of the works.
• Supervised and inspect electrical installation, modification testing and operation of electrical system.
• Prepare plans and schedule for the project.
• Review material specification and material requisition needs in the project.
• Preparing complete documents prior to mechanical completion of the projects.


COMPANY: TAMIMI CONSTRUCTION COMPANY: POSITION: SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER
DURATION: 1999-2001
POSITION: SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER
LOCATION: RASTANURAH, ABQAIQ, PROJECT

COMPANY PROFILE: TAMIMI CONSTRUCTION COMPANY IS one of the leading construction company for Oil, Gas, Petrochem, LNG Plant, Building construction And Maintenance for eastern and western ARAMCO Project.

PROJECT HANDLED:
• Construction and modification of Sub-Station Low Voltage, Medium Voltage, To High Voltage which includes the new installation of Switch Gear, Control Gear, Ats, Power Transformer and distribution control system.
• Upgrade Aramco facilities such as commercial building, offices, and mechanical Piping installation.

PROJECT COST: 28 MILLION US. DOLLAR
JOB DESCRIPTION:
• Preparing project procedure and review project lay out plans.
• Conduct site inspection of horizontal and vertical electrical building construction.
• Evaluate the condition of the proposed plans involving the installation, termination testing and commissioning of electrical and communication equipment.
• In charge in the supervision of the installation of switch gear, control gear, switch board, remote terminal unit, switch racks, cable bus duct, automatic transfer switch, HV. transformer.
• Implementation of safe efficient system for the installation of high voltage overhead distribution power, which includes the installation of Gantry Structure, Transmission lines, surge arrester, capacitor banks, metering cabinet, overhead circuit accumulator, over load break switch, and fuse cut out.
• Preparing progress inspection report, discrepancy report, variation order, and review procedure for all instrument which are calibrated.
• Prepare the important documents and instrument using for testing, prior to support the mechanical completion of the project.

COMPANY: AL HUSSAINI AND SONS COMPANY
POSITION: PROJECT SITE ENGINEER /COST ENGINEER
DURATION: 1995-1998
LOCATION: DHARAN, RASTANURA, ABQAIQ

COMPANY PROFILE: AL HUSSAINI CO.is one of the leading construction company for Commercial building, Offices, Hospitals, Aramco Man Power Supply, Maintenance and Renovation in Dharan, Abqaiq, Rastanura Aramco Plant.

PROJECT HANDLED:
• Renovation of building, offices and upgrade electrical and mechanical buildings.
• Renovation of all hospital wards in Dharan health center and upgrading electrical and communication equipment.
• Maintain all electrical and mechanical facilities in Dharan, Abqaiq, Rastanura.

JOB DESCRIPTION:
• Check and evaluate the condition of the proposed project sites after which give the necessary Aramco standard specially NEC, IEC, NFPA, ANSI, SAES or individual codes involving Sub-Station project.
• Supervised and Inspect daily routine activities and assist the Project Manager, in the implementation of the project.
• Everyday conduct site inspection in the project for the implementation of the work to be done, specially the pro- active action to upgrade the quality of work for the project.
• Checking the lay-out plan if conform to the approved Aramco engineering standards and specification, or implementing of completing weekly inspection activities.
• Preparing RFI or necessary documents for two weeks look ahead, inspection schedule request by the Saudi Aramco inspection department.
• Check all cable splicer if they certified through Saudi Aramco and witness all test to be perform on cables, electrical equipment and instrument system.
• Prepare all documents for testing to support the completion of the project, as per testing and commissioning.

SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER at D- ENGRESSO CONSTRUCTION COMPANY
  • India
  • to

• Preparation of documents prior to mechanical completion like Energization package, Loop packages, and Punch list.

COMPANY: MAN FERROUSTAL INDUSTRELANGEN OIL AND GAS LTD.
POSITION: QA/QC LEAD ENGINEER (ELECTRICAL)
DURATION: 2008-2009
LOCATION: TRIPOLI LYBIA, BENGGASIH, WINTERSHALL, SAHARAH DESERT.

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

MAN FERROSTAL is one of the leading German industrial engineering company manage by Germany consulting firm, which build Gas/Oil/LNG Plant Building hotels and gas plant facilities.

PROJECT HANDLED:
• Wintershalll / Mellitah Gas/Oil/LNG Project Eastern Province OF LYBIA

• Construction of Gas/Oil/LNG Project of wintershall and mellitah plant located at Saharah desert.
• Construction of buildings, electrical facilities, such as Low voltage and Medium voltage sub-station, installation of pipe rack, cable trays and all communication equipment.

Project Cost: 130 Million US Dollars
JOB DESCRIPTION: • Project site inspection and supervised the activities perform by the Qa/Qc. Engineer, and inspector.
• Developing scope of work of all project activities.
• Ensure that latest approved technologies are applied and compliance with applicable quality & integrity standards.
• Develop and manage emergency plans, and procedures to cover the various stage of the project.
• Supervise and approved the development of contractor and review contractors document control system and design additional elements required by the consultants.
• Responsible for maintaining proper Quality control throughout the project and Preparing necessary documents like two weeks look ahead inspection schedule and monitoring.
• Review the approved work procedure for electrical and instrumentation communication, installation activities which includes instrument calibration.
• Provide leadership and guidance Quality Control activities.
• Participate actively in the Quality Assurance program for suppliers, and Provide leadership in non-conforming materials for handling and preservation.
• Preparation of complete documents prior to mechanical completion.


COMPANY: IMAD CO. FOR TRADING AND CONTRACTING CO.
POSITION: QA/QC ENGINEER/MANAGER
DURATION; 2007-2008
LOCATION: DHARAN, ABQAIQ, RASTANURAH

COMPANY PROFILE: IMAD COMPANY Is the one leading construction company for oil/gas/petro chemical, Building, & Substation for industrial and electro mechanical project in ARAMCO EAST & WEST AREA in the province of Saudi Arabia.

PROJECT HANDLED:
ARAMCO PROJECT EASTERN PROVINCE

• Upgrade of Aramco facilities such as Offices and Upgrade on Electrical Sub-station 33 kv to 69kv overhead Gantry tower Line also includes upgrading all electrical sub -station in the whole Abqaiq plant.

PROJECT COST: 56 MILLION US DOLLAR
JOB DESCRIPTION: • Preparing quality progress inspection report with bar chart percentage.
• Every day conduct site inspection together with Qc Engineer and check the activities perform by the construction group whether it conform to Aramco standard, international standard.
• Review project procedure, AFC drawing which is approved by Aramco and check if there is any discrepancy regarding the drawing and procedure and should be coordinated to the client.
• Monitoring QA/QC. Engineer and inspector at site and their daily routine activities which includes daily /weekly report.
• Monitoring all quality documents, ensuring proper filling of documents checking and reviewing construction sketches and AFC drawing to verify it conform to project specification.
• Check tie in and shut down packages, all materials should be available or ready before the tie in shut-down.
• Preparing of documents for inclusion in the operation manuals.
• Preparing of all original documents for testing to support the completion of the project as per testing pre commissioning and final commissioning.
• Attending weekly meeting at Saudi Aramco inspection office discussing the implementation of work and discrepancy of the work done in the project site.
COMPANY: APTC CONSTRUCTION COMPANY LTD.
POSITION: SENIOR ELECTRICAL ENGINEER/PROJECT ENGINEER
DURATION: 2002-2006
LOCATION: RASTANURAH, DHARAN, JUBAIL ROYAL COMISSION, ARAMCO PROJECT

COMPANY PROFILE:
APTC Company is one of the most leading construction company in Saudi Aramco and Royal Commission in Rastanura, Dharan, & Jubail for Oil/ Gas/ Petrochem/ LNG High Rise Building, Commercial Building, & Palaces, Which includes Low/ Medium/ High Voltage Substation.

PROJECT HANDLED:
• Construction of Commercial building and Low Voltage to Medium Voltage Sub-Station Project.
• Construction of new loading dock for oil and gas tanker, Rastanura mall, and upgrade security gate house including building structure.
• Upgrade of Sub-Station 33kv. To 69 kv power line with over head line in royal commission Gas plant.
• Construction of building offices and commercial building in Aramco Jubail for expansion project
• Construction of phase 3 Gas/OIL/LNG/ PLANT at Royal Commission Jubail project.

PROJECT COST: 163 MILLION DOLLAR
JOB DESCRIPTION:
• Establish suitable procedure for the project and rectification of defects during the site inspection.
• Carrying out design calculation.
• Review and comment design document.
• Knowledgeable in site supervision for the installation of 33kv/ 69kv /133kv/233kv sub-station which include all the installation and termination of power transformer, Ac/Dc UPS, Generator.
• Monitor all the installation of Electric Motors, pumps, ring main unit, Grounding, lighting power distribution and control system, Field Test equipment like Omicron primary and secondary injection kit, oil break down test kit, insulation test kit, Digital earth testing kit, high pot testing kit, Hart communication kit & other testing equipment.
• Prepare project related reports and monitor contractors project performance.
• Supervised and evaluate lay out plan for the project especially in substation electrical equipment.
• Conduct regular weekly meeting to advise Contractor, Sub contractor, regarding the flow of the works.
• Supervised and inspect electrical installation, modification testing and operation of electrical system.
• Prepare plans and schedule for the project.
• Review material specification and material requisition needs in the project.
• Preparing complete documents prior to mechanical completion of the projects.


COMPANY: TAMIMI CONSTRUCTION COMPANY: POSITION: SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER
DURATION: 1999-2001
POSITION: SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER
LOCATION: RASTANURAH, ABQAIQ, PROJECT

COMPANY PROFILE: TAMIMI CONSTRUCTION COMPANY IS one of the leading construction company for Oil, Gas, Petrochem, LNG Plant, Building construction And Maintenance for eastern and western ARAMCO Project.

PROJECT HANDLED:
• Construction and modification of Sub-Station Low Voltage, Medium Voltage, To High Voltage which includes the new installation of Switch Gear, Control Gear, Ats, Power Transformer and distribution control system.
• Upgrade Aramco facilities such as commercial building, offices, and mechanical Piping installation.

PROJECT COST: 28 MILLION US. DOLLAR
JOB DESCRIPTION:
• Preparing project procedure and review project lay out plans.
• Conduct site inspection of horizontal and vertical electrical building construction.
• Evaluate the condition of the proposed plans involving the installation, termination testing and commissioning of electrical and communication equipment.
• In charge in the supervision of the installation of switch gear, control gear, switch board, remote terminal unit, switch racks, cable bus duct, automatic transfer switch, HV. transformer.
• Implementation of safe efficient system for the installation of high voltage overhead distribution power, which includes the installation of Gantry Structure, Transmission lines, surge arrester, capacitor banks, metering cabinet, overhead circuit accumulator, over load break switch, and fuse cut out.
• Preparing progress inspection report, discrepancy report, variation order, and review procedure for all instrument which are calibrated.
• Prepare the important documents and instrument using for testing, prior to support the mechanical completion of the project.

COMPANY: AL HUSSAINI AND SONS COMPANY
POSITION: PROJECT SITE ENGINEER /COST ENGINEER
DURATION: 1995-1998
LOCATION: DHARAN, RASTANURA, ABQAIQ

COMPANY PROFILE: AL HUSSAINI CO.is one of the leading construction company for Commercial building, Offices, Hospitals, Aramco Man Power Supply, Maintenance and Renovation in Dharan, Abqaiq, Rastanura Aramco Plant.

PROJECT HANDLED:
• Renovation of building, offices and upgrade electrical and mechanical buildings.
• Renovation of all hospital wards in Dharan health center and upgrading electrical and communication equipment.
• Maintain all electrical and mechanical facilities in Dharan, Abqaiq, Rastanura.

JOB DESCRIPTION:
• Check and evaluate the condition of the proposed project sites after which give the necessary Aramco standard specially NEC, IEC, NFPA, ANSI, SAES or individual codes involving Sub-Station project.
• Supervised and Inspect daily routine activities and assist the Project Manager, in the implementation of the project.
• Everyday conduct site inspection in the project for the implementation of the work to be done, specially the pro- active action to upgrade the quality of work for the project.
• Checking the lay-out plan if conform to the approved Aramco engineering standards and specification, or implementing of completing weekly inspection activities.
• Preparing RFI or necessary documents for two weeks look ahead, inspection schedule request by the Saudi Aramco inspection department.
• Check all cable splicer if they certified through Saudi Aramco and witness all test to be perform on cables, electrical equipment and instrument system.
• Prepare all documents for testing to support the completion of the project, as per testing and commissioning.


COMPANY: RETZER ENGINEERING COMPANY LTD.
POSITION: PROJECT SITE ENGINEER / MAINTENANCE ENGINEER
DURATION: 1988-1994
LOCATION: TAIF KING FAHAD AIRBASE

COMPANY PROFILE: RETZER ENGINEERING COMPANY IS ONE OF THE MOST LEADING COMPANY FOR HIGH RISE BUILDING, TUNNEL AIR BASE CONTRACTOR IN TAIF SAUDI ARABIA SUCH AS KING FHAHAD MILITARY AIR BASE, AIR BASE OFFICE, ELECTRICAL, & MECHANICAL BUILDINGS.

PROJECT HANDLED:
• Construction of high rise building and upgrading of power generating plant and sub-station project.
• Tunneling of air craft landing area, Construction of new building offices, commercial building, underground offices, hospital, and automatic landing gate of jet fighters with complete recreation building inside the air base.

PROJECT COST: 68 BILLION US. DOLLAR
JOB DESCRIPTION: • Supervised all the installation of AC/DC Electric motors, Dry and Oil type transformer, switch gear, control gear, switch board, SF6 Circuit Breaker, Panel Boards, Turbine Generator, and communication Equipment.
• Supervised completed Electrical Structure, and thoroughly checked if there are any un notice safety hazard, Related failures that must be corrected at once.
• Prepare the schedule of two weeks look ahead once a week, and In charge of the over all supervision of daily routine activities like trouble shooting of electrical, HVAC, Instrument, and communication equipment, that needs to be maintain at the military air base.
• Conduct site inspection inside and outside of the air base to be maintain specially in central station of the power generating plant, Power feeders, and Power drives for machine tools and equipment.


COMPANY: ISABELA STATE UNIVERSITY
POSITION: ELECTRICAL/ MECHANICAL SUPERVISOR
DURATION: 1986-1988
LOCATION: ECHAGUE ISABELA, PHILIPPINES

COMPANY PROFILE: STATE UNIVERSITY IS THE MOST OUTSTANDING SCHOOL IN THE PROVINCE, AND THIS IS THE STANDARD GOVERNMENT SCHOOL.

PROJECT HANDLED: • Upgrade university facilities, offices, Electrical and mechanical buildings.

PROJECT COST: 1.5 MILLION US. DOLLAR (ONE YEAR BUDGET ALLOCATED)

JOB DESCRIPTION: • In charge of the overall supervision of the construction and maintenance job in the University like Plumbing, Carpentry, Electrical, Mechanical, and Communication equipment or other related matters that needs Maintenance.
• Approved all Material Requisition, Purchase Order, for Construction and Maintenance.
• Prepare preventive maintenance schedule for all Electrical and mechanical equipment.
• In charge in the training and orientation of school ROTC Reserve Officer Training Corps, for all High school and college student.
• In charge in the Planning and Scheduling, of different Seminars to all Engineering student.

SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER at HYDRO RESOURCES CONTRACTORS CORPORATION
  • India
  • to

• Preparation of documents prior to mechanical completion like Energization package, Loop packages, and Punch list.

COMPANY: MAN FERROUSTAL INDUSTRELANGEN OIL AND GAS LTD.
POSITION: QA/QC LEAD ENGINEER (ELECTRICAL)
DURATION: 2008-2009
LOCATION: TRIPOLI LYBIA, BENGGASIH, WINTERSHALL, SAHARAH DESERT.

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

MAN FERROSTAL is one of the leading German industrial engineering company manage by Germany consulting firm, which build Gas/Oil/LNG Plant Building hotels and gas plant facilities.

PROJECT HANDLED:
• Wintershalll / Mellitah Gas/Oil/LNG Project Eastern Province OF LYBIA

• Construction of Gas/Oil/LNG Project of wintershall and mellitah plant located at Saharah desert.
• Construction of buildings, electrical facilities, such as Low voltage and Medium voltage sub-station, installation of pipe rack, cable trays and all communication equipment.

Project Cost: 130 Million US Dollars
JOB DESCRIPTION: • Project site inspection and supervised the activities perform by the Qa/Qc. Engineer, and inspector.
• Developing scope of work of all project activities.
• Ensure that latest approved technologies are applied and compliance with applicable quality & integrity standards.
• Develop and manage emergency plans, and procedures to cover the various stage of the project.
• Supervise and approved the development of contractor and review contractors document control system and design additional elements required by the consultants.
• Responsible for maintaining proper Quality control throughout the project and Preparing necessary documents like two weeks look ahead inspection schedule and monitoring.
• Review the approved work procedure for electrical and instrumentation communication, installation activities which includes instrument calibration.
• Provide leadership and guidance Quality Control activities.
• Participate actively in the Quality Assurance program for suppliers, and Provide leadership in non-conforming materials for handling and preservation.
• Preparation of complete documents prior to mechanical completion.


COMPANY: IMAD CO. FOR TRADING AND CONTRACTING CO.
POSITION: QA/QC ENGINEER/MANAGER
DURATION; 2007-2008
LOCATION: DHARAN, ABQAIQ, RASTANURAH

COMPANY PROFILE: IMAD COMPANY Is the one leading construction company for oil/gas/petro chemical, Building, & Substation for industrial and electro mechanical project in ARAMCO EAST & WEST AREA in the province of Saudi Arabia.

PROJECT HANDLED:
ARAMCO PROJECT EASTERN PROVINCE

• Upgrade of Aramco facilities such as Offices and Upgrade on Electrical Sub-station 33 kv to 69kv overhead Gantry tower Line also includes upgrading all electrical sub -station in the whole Abqaiq plant.

PROJECT COST: 56 MILLION US DOLLAR
JOB DESCRIPTION: • Preparing quality progress inspection report with bar chart percentage.
• Every day conduct site inspection together with Qc Engineer and check the activities perform by the construction group whether it conform to Aramco standard, international standard.
• Review project procedure, AFC drawing which is approved by Aramco and check if there is any discrepancy regarding the drawing and procedure and should be coordinated to the client.
• Monitoring QA/QC. Engineer and inspector at site and their daily routine activities which includes daily /weekly report.
• Monitoring all quality documents, ensuring proper filling of documents checking and reviewing construction sketches and AFC drawing to verify it conform to project specification.
• Check tie in and shut down packages, all materials should be available or ready before the tie in shut-down.
• Preparing of documents for inclusion in the operation manuals.
• Preparing of all original documents for testing to support the completion of the project as per testing pre commissioning and final commissioning.
• Attending weekly meeting at Saudi Aramco inspection office discussing the implementation of work and discrepancy of the work done in the project site.
COMPANY: APTC CONSTRUCTION COMPANY LTD.
POSITION: SENIOR ELECTRICAL ENGINEER/PROJECT ENGINEER
DURATION: 2002-2006
LOCATION: RASTANURAH, DHARAN, JUBAIL ROYAL COMISSION, ARAMCO PROJECT

COMPANY PROFILE:
APTC Company is one of the most leading construction company in Saudi Aramco and Royal Commission in Rastanura, Dharan, & Jubail for Oil/ Gas/ Petrochem/ LNG High Rise Building, Commercial Building, & Palaces, Which includes Low/ Medium/ High Voltage Substation.

PROJECT HANDLED:
• Construction of Commercial building and Low Voltage to Medium Voltage Sub-Station Project.
• Construction of new loading dock for oil and gas tanker, Rastanura mall, and upgrade security gate house including building structure.
• Upgrade of Sub-Station 33kv. To 69 kv power line with over head line in royal commission Gas plant.
• Construction of building offices and commercial building in Aramco Jubail for expansion project
• Construction of phase 3 Gas/OIL/LNG/ PLANT at Royal Commission Jubail project.

PROJECT COST: 163 MILLION DOLLAR
JOB DESCRIPTION:
• Establish suitable procedure for the project and rectification of defects during the site inspection.
• Carrying out design calculation.
• Review and comment design document.
• Knowledgeable in site supervision for the installation of 33kv/ 69kv /133kv/233kv sub-station which include all the installation and termination of power transformer, Ac/Dc UPS, Generator.
• Monitor all the installation of Electric Motors, pumps, ring main unit, Grounding, lighting power distribution and control system, Field Test equipment like Omicron primary and secondary injection kit, oil break down test kit, insulation test kit, Digital earth testing kit, high pot testing kit, Hart communication kit & other testing equipment.
• Prepare project related reports and monitor contractors project performance.
• Supervised and evaluate lay out plan for the project especially in substation electrical equipment.
• Conduct regular weekly meeting to advise Contractor, Sub contractor, regarding the flow of the works.
• Supervised and inspect electrical installation, modification testing and operation of electrical system.
• Prepare plans and schedule for the project.
• Review material specification and material requisition needs in the project.
• Preparing complete documents prior to mechanical completion of the projects.


COMPANY: TAMIMI CONSTRUCTION COMPANY: POSITION: SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER
DURATION: 1999-2001
POSITION: SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER
LOCATION: RASTANURAH, ABQAIQ, PROJECT

COMPANY PROFILE: TAMIMI CONSTRUCTION COMPANY IS one of the leading construction company for Oil, Gas, Petrochem, LNG Plant, Building construction And Maintenance for eastern and western ARAMCO Project.

PROJECT HANDLED:
• Construction and modification of Sub-Station Low Voltage, Medium Voltage, To High Voltage which includes the new installation of Switch Gear, Control Gear, Ats, Power Transformer and distribution control system.
• Upgrade Aramco facilities such as commercial building, offices, and mechanical Piping installation.

PROJECT COST: 28 MILLION US. DOLLAR
JOB DESCRIPTION:
• Preparing project procedure and review project lay out plans.
• Conduct site inspection of horizontal and vertical electrical building construction.
• Evaluate the condition of the proposed plans involving the installation, termination testing and commissioning of electrical and communication equipment.
• In charge in the supervision of the installation of switch gear, control gear, switch board, remote terminal unit, switch racks, cable bus duct, automatic transfer switch, HV. transformer.
• Implementation of safe efficient system for the installation of high voltage overhead distribution power, which includes the installation of Gantry Structure, Transmission lines, surge arrester, capacitor banks, metering cabinet, overhead circuit accumulator, over load break switch, and fuse cut out.
• Preparing progress inspection report, discrepancy report, variation order, and review procedure for all instrument which are calibrated.
• Prepare the important documents and instrument using for testing, prior to support the mechanical completion of the project.

COMPANY: AL HUSSAINI AND SONS COMPANY
POSITION: PROJECT SITE ENGINEER /COST ENGINEER
DURATION: 1995-1998
LOCATION: DHARAN, RASTANURA, ABQAIQ

COMPANY PROFILE: AL HUSSAINI CO.is one of the leading construction company for Commercial building, Offices, Hospitals, Aramco Man Power Supply, Maintenance and Renovation in Dharan, Abqaiq, Rastanura Aramco Plant.

PROJECT HANDLED:
• Renovation of building, offices and upgrade electrical and mechanical buildings.
• Renovation of all hospital wards in Dharan health center and upgrading electrical and communication equipment.
• Maintain all electrical and mechanical facilities in Dharan, Abqaiq, Rastanura.

JOB DESCRIPTION:
• Check and evaluate the condition of the proposed project sites after which give the necessary Aramco standard specially NEC, IEC, NFPA, ANSI, SAES or individual codes involving Sub-Station project.
• Supervised and Inspect daily routine activities and assist the Project Manager, in the implementation of the project.
• Everyday conduct site inspection in the project for the implementation of the work to be done, specially the pro- active action to upgrade the quality of work for the project.
• Checking the lay-out plan if conform to the approved Aramco engineering standards and specification, or implementing of completing weekly inspection activities.
• Preparing RFI or necessary documents for two weeks look ahead, inspection schedule request by the Saudi Aramco inspection department.
• Check all cable splicer if they certified through Saudi Aramco and witness all test to be perform on cables, electrical equipment and instrument system.
• Prepare all documents for testing to support the completion of the project, as per testing and commissioning.


COMPANY: RETZER ENGINEERING COMPANY LTD.
POSITION: PROJECT SITE ENGINEER / MAINTENANCE ENGINEER
DURATION: 1988-1994
LOCATION: TAIF KING FAHAD AIRBASE

COMPANY PROFILE: RETZER ENGINEERING COMPANY IS ONE OF THE MOST LEADING COMPANY FOR HIGH RISE BUILDING, TUNNEL AIR BASE CONTRACTOR IN TAIF SAUDI ARABIA SUCH AS KING FHAHAD MILITARY AIR BASE, AIR BASE OFFICE, ELECTRICAL, & MECHANICAL BUILDINGS.

PROJECT HANDLED:
• Construction of high rise building and upgrading of power generating plant and sub-station project.
• Tunneling of air craft landing area, Construction of new building offices, commercial building, underground offices, hospital, and automatic landing gate of jet fighters with complete recreation building inside the air base.

PROJECT COST: 68 BILLION US. DOLLAR
JOB DESCRIPTION: • Supervised all the installation of AC/DC Electric motors, Dry and Oil type transformer, switch gear, control gear, switch board, SF6 Circuit Breaker, Panel Boards, Turbine Generator, and communication Equipment.
• Supervised completed Electrical Structure, and thoroughly checked if there are any un notice safety hazard, Related failures that must be corrected at once.
• Prepare the schedule of two weeks look ahead once a week, and In charge of the over all supervision of daily routine activities like trouble shooting of electrical, HVAC, Instrument, and communication equipment, that needs to be maintain at the military air base.
• Conduct site inspection inside and outside of the air base to be maintain specially in central station of the power generating plant, Power feeders, and Power drives for machine tools and equipment.


COMPANY: ISABELA STATE UNIVERSITY
POSITION: ELECTRICAL/ MECHANICAL SUPERVISOR
DURATION: 1986-1988
LOCATION: ECHAGUE ISABELA, PHILIPPINES

COMPANY PROFILE: STATE UNIVERSITY IS THE MOST OUTSTANDING SCHOOL IN THE PROVINCE, AND THIS IS THE STANDARD GOVERNMENT SCHOOL.

PROJECT HANDLED: • Upgrade university facilities, offices, Electrical and mechanical buildings.

PROJECT COST: 1.5 MILLION US. DOLLAR (ONE YEAR BUDGET ALLOCATED)

JOB DESCRIPTION: • In charge of the overall supervision of the construction and maintenance job in the University like Plumbing, Carpentry, Electrical, Mechanical, and Communication equipment or other related matters that needs Maintenance.
• Approved all Material Requisition, Purchase Order, for Construction and Maintenance.
• Prepare preventive maintenance schedule for all Electrical and mechanical equipment.
• In charge in the training and orientation of school ROTC Reserve Officer Training Corps, for all High school and college student.
• In charge in the Planning and Scheduling, of different Seminars to all Engineering student.


COMPANY: D- ENGRESSO CONSTRUCTION COMPANY: POSITION: ELECTRICAL ENGINEER / SUPERVISOR
DURATION: 1984-1986
LOCATION: CALAOCAN CITY, MANILA, PHILIPPINES

COMPANY PROFILE: D-ENGRESSO CONSTRUCTION IS ONE OF THE LEADING COMPANY IN THE PHILIPPINES FOR HIGH RISE BUILDING, ELECTRICAL AND MECHANICAL CONTRACTOR OF SAN MIGUEL CORPORATION AND GOVERNMENT BUILDINGS.

PROJECT COST: 3 MILLION US. DOLLAR
PROJECT HANDLED: SAN MIGUEL CORPORATION PROJECT/ GOVERNMENT OFFICES.

• Renovation of commercial Building, offices, Refinery plant, for all electrical and mechanical plant like boiler plant, cooling tower plant.
• Construction of new Building of San Miguel corporation in Paco Manila.

JOB DESCRIPTION: • Supervised all the installation of horizontal and vertical electrical / mechanical building construction.
• Supervised the condition of the proposed project specially in the installation of
Electrical / Mechanical and instrumentation equipment.
• In charge in the supervision of the installation of High Voltage cable in the Sub-Station, and this includes the installation of Boiler Plant, and Stand By Generator with Automatic Transfer Switch.
• In charge in the approval of Material Requisition and Preparing daily reports, weekly reports, Monthly Reports submitted to the General Manager.
• Advised and assist the Project Engineer in the implementation of special project such as Power Plant, Boiler Plant, and Digital Communication Equipment.
• Review and check the Lay-out plan for the newly bid project.

SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER at MITSUBISHI ELECTRIC CO./ 3-D INDUSTRIES CO. INC
  • India
  • to

• Preparation of documents prior to mechanical completion like Energization package, Loop packages, and Punch list.

COMPANY: MAN FERROUSTAL INDUSTRELANGEN OIL AND GAS LTD.
POSITION: QA/QC LEAD ENGINEER (ELECTRICAL)
DURATION: 2008-2009
LOCATION: TRIPOLI LYBIA, BENGGASIH, WINTERSHALL, SAHARAH DESERT.

COMPANY PROFILE: (Brief Company Profile in one Paragraph Form)

MAN FERROSTAL is one of the leading German industrial engineering company manage by Germany consulting firm, which build Gas/Oil/LNG Plant Building hotels and gas plant facilities.

PROJECT HANDLED:
• Wintershalll / Mellitah Gas/Oil/LNG Project Eastern Province OF LYBIA

• Construction of Gas/Oil/LNG Project of wintershall and mellitah plant located at Saharah desert.
• Construction of buildings, electrical facilities, such as Low voltage and Medium voltage sub-station, installation of pipe rack, cable trays and all communication equipment.

Project Cost: 130 Million US Dollars
JOB DESCRIPTION: • Project site inspection and supervised the activities perform by the Qa/Qc. Engineer, and inspector.
• Developing scope of work of all project activities.
• Ensure that latest approved technologies are applied and compliance with applicable quality & integrity standards.
• Develop and manage emergency plans, and procedures to cover the various stage of the project.
• Supervise and approved the development of contractor and review contractors document control system and design additional elements required by the consultants.
• Responsible for maintaining proper Quality control throughout the project and Preparing necessary documents like two weeks look ahead inspection schedule and monitoring.
• Review the approved work procedure for electrical and instrumentation communication, installation activities which includes instrument calibration.
• Provide leadership and guidance Quality Control activities.
• Participate actively in the Quality Assurance program for suppliers, and Provide leadership in non-conforming materials for handling and preservation.
• Preparation of complete documents prior to mechanical completion.


COMPANY: IMAD CO. FOR TRADING AND CONTRACTING CO.
POSITION: QA/QC ENGINEER/MANAGER
DURATION; 2007-2008
LOCATION: DHARAN, ABQAIQ, RASTANURAH

COMPANY PROFILE: IMAD COMPANY Is the one leading construction company for oil/gas/petro chemical, Building, & Substation for industrial and electro mechanical project in ARAMCO EAST & WEST AREA in the province of Saudi Arabia.

PROJECT HANDLED:
ARAMCO PROJECT EASTERN PROVINCE

• Upgrade of Aramco facilities such as Offices and Upgrade on Electrical Sub-station 33 kv to 69kv overhead Gantry tower Line also includes upgrading all electrical sub -station in the whole Abqaiq plant.

PROJECT COST: 56 MILLION US DOLLAR
JOB DESCRIPTION: • Preparing quality progress inspection report with bar chart percentage.
• Every day conduct site inspection together with Qc Engineer and check the activities perform by the construction group whether it conform to Aramco standard, international standard.
• Review project procedure, AFC drawing which is approved by Aramco and check if there is any discrepancy regarding the drawing and procedure and should be coordinated to the client.
• Monitoring QA/QC. Engineer and inspector at site and their daily routine activities which includes daily /weekly report.
• Monitoring all quality documents, ensuring proper filling of documents checking and reviewing construction sketches and AFC drawing to verify it conform to project specification.
• Check tie in and shut down packages, all materials should be available or ready before the tie in shut-down.
• Preparing of documents for inclusion in the operation manuals.
• Preparing of all original documents for testing to support the completion of the project as per testing pre commissioning and final commissioning.
• Attending weekly meeting at Saudi Aramco inspection office discussing the implementation of work and discrepancy of the work done in the project site.
COMPANY: APTC CONSTRUCTION COMPANY LTD.
POSITION: SENIOR ELECTRICAL ENGINEER/PROJECT ENGINEER
DURATION: 2002-2006
LOCATION: RASTANURAH, DHARAN, JUBAIL ROYAL COMISSION, ARAMCO PROJECT

COMPANY PROFILE:
APTC Company is one of the most leading construction company in Saudi Aramco and Royal Commission in Rastanura, Dharan, & Jubail for Oil/ Gas/ Petrochem/ LNG High Rise Building, Commercial Building, & Palaces, Which includes Low/ Medium/ High Voltage Substation.

PROJECT HANDLED:
• Construction of Commercial building and Low Voltage to Medium Voltage Sub-Station Project.
• Construction of new loading dock for oil and gas tanker, Rastanura mall, and upgrade security gate house including building structure.
• Upgrade of Sub-Station 33kv. To 69 kv power line with over head line in royal commission Gas plant.
• Construction of building offices and commercial building in Aramco Jubail for expansion project
• Construction of phase 3 Gas/OIL/LNG/ PLANT at Royal Commission Jubail project.

PROJECT COST: 163 MILLION DOLLAR
JOB DESCRIPTION:
• Establish suitable procedure for the project and rectification of defects during the site inspection.
• Carrying out design calculation.
• Review and comment design document.
• Knowledgeable in site supervision for the installation of 33kv/ 69kv /133kv/233kv sub-station which include all the installation and termination of power transformer, Ac/Dc UPS, Generator.
• Monitor all the installation of Electric Motors, pumps, ring main unit, Grounding, lighting power distribution and control system, Field Test equipment like Omicron primary and secondary injection kit, oil break down test kit, insulation test kit, Digital earth testing kit, high pot testing kit, Hart communication kit & other testing equipment.
• Prepare project related reports and monitor contractors project performance.
• Supervised and evaluate lay out plan for the project especially in substation electrical equipment.
• Conduct regular weekly meeting to advise Contractor, Sub contractor, regarding the flow of the works.
• Supervised and inspect electrical installation, modification testing and operation of electrical system.
• Prepare plans and schedule for the project.
• Review material specification and material requisition needs in the project.
• Preparing complete documents prior to mechanical completion of the projects.


COMPANY: TAMIMI CONSTRUCTION COMPANY: POSITION: SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER
DURATION: 1999-2001
POSITION: SENIOR ELECTRICAL ENGINEER/QA/QC ENGINEER
LOCATION: RASTANURAH, ABQAIQ, PROJECT

COMPANY PROFILE: TAMIMI CONSTRUCTION COMPANY IS one of the leading construction company for Oil, Gas, Petrochem, LNG Plant, Building construction And Maintenance for eastern and western ARAMCO Project.

PROJECT HANDLED:
• Construction and modification of Sub-Station Low Voltage, Medium Voltage, To High Voltage which includes the new installation of Switch Gear, Control Gear, Ats, Power Transformer and distribution control system.
• Upgrade Aramco facilities such as commercial building, offices, and mechanical Piping installation.

PROJECT COST: 28 MILLION US. DOLLAR
JOB DESCRIPTION:
• Preparing project procedure and review project lay out plans.
• Conduct site inspection of horizontal and vertical electrical building construction.
• Evaluate the condition of the proposed plans involving the installation, termination testing and commissioning of electrical and communication equipment.
• In charge in the supervision of the installation of switch gear, control gear, switch board, remote terminal unit, switch racks, cable bus duct, automatic transfer switch, HV. transformer.
• Implementation of safe efficient system for the installation of high voltage overhead distribution power, which includes the installation of Gantry Structure, Transmission lines, surge arrester, capacitor banks, metering cabinet, overhead circuit accumulator, over load break switch, and fuse cut out.
• Preparing progress inspection report, discrepancy report, variation order, and review procedure for all instrument which are calibrated.
• Prepare the important documents and instrument using for testing, prior to support the mechanical completion of the project.

COMPANY: AL HUSSAINI AND SONS COMPANY
POSITION: PROJECT SITE ENGINEER /COST ENGINEER
DURATION: 1995-1998
LOCATION: DHARAN, RASTANURA, ABQAIQ

COMPANY PROFILE: AL HUSSAINI CO.is one of the leading construction company for Commercial building, Offices, Hospitals, Aramco Man Power Supply, Maintenance and Renovation in Dharan, Abqaiq, Rastanura Aramco Plant.

PROJECT HANDLED:
• Renovation of building, offices and upgrade electrical and mechanical buildings.
• Renovation of all hospital wards in Dharan health center and upgrading electrical and communication equipment.
• Maintain all electrical and mechanical facilities in Dharan, Abqaiq, Rastanura.

JOB DESCRIPTION:
• Check and evaluate the condition of the proposed project sites after which give the necessary Aramco standard specially NEC, IEC, NFPA, ANSI, SAES or individual codes involving Sub-Station project.
• Supervised and Inspect daily routine activities and assist the Project Manager, in the implementation of the project.
• Everyday conduct site inspection in the project for the implementation of the work to be done, specially the pro- active action to upgrade the quality of work for the project.
• Checking the lay-out plan if conform to the approved Aramco engineering standards and specification, or implementing of completing weekly inspection activities.
• Preparing RFI or necessary documents for two weeks look ahead, inspection schedule request by the Saudi Aramco inspection department.
• Check all cable splicer if they certified through Saudi Aramco and witness all test to be perform on cables, electrical equipment and instrument system.
• Prepare all documents for testing to support the completion of the project, as per testing and commissioning.


COMPANY: RETZER ENGINEERING COMPANY LTD.
POSITION: PROJECT SITE ENGINEER / MAINTENANCE ENGINEER
DURATION: 1988-1994
LOCATION: TAIF KING FAHAD AIRBASE

COMPANY PROFILE: RETZER ENGINEERING COMPANY IS ONE OF THE MOST LEADING COMPANY FOR HIGH RISE BUILDING, TUNNEL AIR BASE CONTRACTOR IN TAIF SAUDI ARABIA SUCH AS KING FHAHAD MILITARY AIR BASE, AIR BASE OFFICE, ELECTRICAL, & MECHANICAL BUILDINGS.

PROJECT HANDLED:
• Construction of high rise building and upgrading of power generating plant and sub-station project.
• Tunneling of air craft landing area, Construction of new building offices, commercial building, underground offices, hospital, and automatic landing gate of jet fighters with complete recreation building inside the air base.

PROJECT COST: 68 BILLION US. DOLLAR
JOB DESCRIPTION: • Supervised all the installation of AC/DC Electric motors, Dry and Oil type transformer, switch gear, control gear, switch board, SF6 Circuit Breaker, Panel Boards, Turbine Generator, and communication Equipment.
• Supervised completed Electrical Structure, and thoroughly checked if there are any un notice safety hazard, Related failures that must be corrected at once.
• Prepare the schedule of two weeks look ahead once a week, and In charge of the over all supervision of daily routine activities like trouble shooting of electrical, HVAC, Instrument, and communication equipment, that needs to be maintain at the military air base.
• Conduct site inspection inside and outside of the air base to be maintain specially in central station of the power generating plant, Power feeders, and Power drives for machine tools and equipment.


COMPANY: ISABELA STATE UNIVERSITY
POSITION: ELECTRICAL/ MECHANICAL SUPERVISOR
DURATION: 1986-1988
LOCATION: ECHAGUE ISABELA, PHILIPPINES

COMPANY PROFILE: STATE UNIVERSITY IS THE MOST OUTSTANDING SCHOOL IN THE PROVINCE, AND THIS IS THE STANDARD GOVERNMENT SCHOOL.

PROJECT HANDLED: • Upgrade university facilities, offices, Electrical and mechanical buildings.

PROJECT COST: 1.5 MILLION US. DOLLAR (ONE YEAR BUDGET ALLOCATED)

JOB DESCRIPTION: • In charge of the overall supervision of the construction and maintenance job in the University like Plumbing, Carpentry, Electrical, Mechanical, and Communication equipment or other related matters that needs Maintenance.
• Approved all Material Requisition, Purchase Order, for Construction and Maintenance.
• Prepare preventive maintenance schedule for all Electrical and mechanical equipment.
• In charge in the training and orientation of school ROTC Reserve Officer Training Corps, for all High school and college student.
• In charge in the Planning and Scheduling, of different Seminars to all Engineering student.


COMPANY: D- ENGRESSO CONSTRUCTION COMPANY: POSITION: ELECTRICAL ENGINEER / SUPERVISOR
DURATION: 1984-1986
LOCATION: CALAOCAN CITY, MANILA, PHILIPPINES

COMPANY PROFILE: D-ENGRESSO CONSTRUCTION IS ONE OF THE LEADING COMPANY IN THE PHILIPPINES FOR HIGH RISE BUILDING, ELECTRICAL AND MECHANICAL CONTRACTOR OF SAN MIGUEL CORPORATION AND GOVERNMENT BUILDINGS.

PROJECT COST: 3 MILLION US. DOLLAR
PROJECT HANDLED: SAN MIGUEL CORPORATION PROJECT/ GOVERNMENT OFFICES.

• Renovation of commercial Building, offices, Refinery plant, for all electrical and mechanical plant like boiler plant, cooling tower plant.
• Construction of new Building of San Miguel corporation in Paco Manila.

JOB DESCRIPTION: • Supervised all the installation of horizontal and vertical electrical / mechanical building construction.
• Supervised the condition of the proposed project specially in the installation of
Electrical / Mechanical and instrumentation equipment.
• In charge in the supervision of the installation of High Voltage cable in the Sub-Station, and this includes the installation of Boiler Plant, and Stand By Generator with Automatic Transfer Switch.
• In charge in the approval of Material Requisition and Preparing daily reports, weekly reports, Monthly Reports submitted to the General Manager.
• Advised and assist the Project Engineer in the implementation of special project such as Power Plant, Boiler Plant, and Digital Communication Equipment.
• Review and check the Lay-out plan for the newly bid project.

COMPANY: HYDRO RESOURCES CONTRACTORS CORPORATION
POSITION: PLANT ENGINEER
DURATION: 1978-1986
LOCATION: PASIG CITY MANILA, PHILIPPINES

COMPANY PROFILE: HYDRO RESOURSES COMPANY IS ONE OF THE LEADING CONTRUCTION COMPANY FOR HYDRO ELECTRIC POWER PLANT/ SUB-STATION/ BUILDING OFFICES/ AND CONTRACTOR OF NATIONAL POWER CORPORATION IN THE PHILIPPINES..

PROJECT HANDLED: NATIONAL POWER COPORATION, AND NATIONAL IRRIGATION SYSTEM.

PROJECT COST: 6.8 BILLION US. DOLLAR
JOB DESCRIPTION: • Supervised all Electrical, Mechanical, Instrumentation, and Communication Equipment Installation for their daily routine activities to all assigned personnel within his designated areas.
• Gathered all important data for references during the course of the installation, and responsible for the good implementation of work in the project.
• Supervised the work perform by the construction group whether it conform to the British / American Standards and Approved Drawing Specification.
• Attending Weekly Meeting at National Power Corporation, discussing the implementation of work to be done in the project.
• Supervised the Erection of Batching Plant, Crusher Plant, and Generating Plant to supply all the temporary facilities in the Project.

Education

Bachelor's degree, Electrical Engineering
  • at Technological Institute of the Philippines
  • January 1977

College: Technological Institute of the Philippines Cubao Manila 1972--1977 Course: Bachelor of Science in Electrical Engineering

Bachelor's degree, Power Plant Engineering Course/Gas,oil,petrochem,lng
  • at Technological Institute Of The Philippines
  • March 1972

PRC License: Passed the Licensure Examination for Electrical Engineer License No. 00008204 EDWIN A. VALDEZ APPLICANT Best in construction design Image Format: JPEG (EXIF) Equipment Manufacturer: Canon Camera Model: CanoScan LiDE 25 Software: CanoScan Toolbox 4.9.3 Picture Date: 2012:03:07 12:06:50 Exif Version: 0 Date Time Digitized: 2012:03:07 12:06:50 Image Width: 163 Image Height: 234

High school or equivalent, N/A
  • at Cabatuan High School
  • March 1968

Secondary: Cabatuan High School Cabatuan isabela 1968--1972

High school or equivalent,
  • at Address of School

Primary: Name of School Address of School YearGraduated

High school or equivalent,
  • at Cabatuan East Central School

Cabatuan East Central School Cabatuan Isabela 1962--1968

Specialties & Skills

Site Inspection
Electrical Testing
QA Automation
Refinery
SUB STATION,GAS & OIL PLANT
COMMERCIAL BUILDINGS
ELECTRIC MOTOR
ENGINEER
GENERATORS
INSPECTION
MILLION

Languages

Arabic
Beginner
English
Beginner
Spanish
Beginner
Tagalog
Expert

Memberships

MASTER ENGINEER
  • MASTER ENGINEER
  • October 1981

Training and Certifications

POWER PLANT ENGINEER (Certificate)
Date Attended:
March 1992
Valid Until:
March 1993