Project Manager
مجموعة سعيد حسين المالكي للمقاولات
Total years of experience :27 years, 1 Months
Project Manager
Engineering Manager
From 31-Jul 2011 till Now
Omrania & Associates Architecture and Engineering Consultants - KSA
Senior Structural Engineer at King Abdullah Waqfe Project, consists of # five hotels with four
stories basement floors substructure and eighteen stories superstructure, with total areas of 331005 meter square, and total project value of 2100 million SR, At Madina Munawra KSA.
Duties: *Reviewing the structural calculations for RC & Steel Structures for the above mentioned
buildings.
*Reviewing Structural shop drawings and structural submittals.
From 1-Dec 2006 to 20-Jun 2011
Zuhier Fayez & Partnership Co - KSA
*Resident Engineer at Jazira Bank Project in Al Qaseem -Buraida city.
*Structure Engineer at the Project of King Faisal University Campus Construction which,
consists of the following buildings:
a- Main Administration Building, with total areas of 51, 688 square meters.
b- Collage of Education, with total areas of 29, 673 square meters.
c- Collage of Pharmacy, with total areas of 27, 641 square meters.
d- Collage of Veterinary, with total area of 28, 003 square meters.
e- Boys and Girls Activity Center, with total area of 14, 235 square meters.
f- Mosque Building, with total area 4800 square meters.
g- Infrastructure works of the campus.
Duties:-
*Reviewing the structural calculations for RC & Steel Structures for the above mentioned
buildings.
*Reviewing Structural shop drawings and structural submittals.
a- Projects -Construction of # 6 schools including finishing and furniture.
b- Technical office works (designing works, preparing bids, maintenance works, supervision works)
Duties:-
*Worked as a consultant engineer at the construction of school buildings .
*Technical office works as preparing structural design, bids, quantities surveying.
*quality controlling of the construction and maintenance works.
a- Project -Construction of # four Big Mosques in Riyadh -Ministry of Islamic Affairs.
b- Project -Structural Repairing and Maintenance of general buildings.
Duties:-
*work as a project manager.
a- Project -Construction of Taba Hospital with 3650 m2 total area in south Sinai - Ministry of Health.
b- Project - Construction of No 9 Emergency units at the western high way.
Duties:-
*Site Managing works.
*Site Engineering Works.
a- Project-Construction of #6 Villas in Riyadh .
b- Project - Construction of #4 Multistory Buildings in Riyadh.
Duties:-
*Worked as a site engineer .
*Worked as a technical office engineer.
a- Project- Construction of 378 housing units in Nasr City, Cairo, Ministry of Housing.
b- Project - Construction of 904 housing units in Ismailia City, Ministry of Housing.
c- Project - Construction of 27 Housing Buildings in Ismailia City, Suize Canal Institute.
Duties:-
*Worked as a site Engineer.
Civil Engineering Department