Senior Electrical Secondary Design Engineer
MEGA for Construction and Industries
Total years of experience :12 years, 7 Months
Job Description:
- E3 Software key user.
- Design of solar systems.
- Design of SLDs and CPMs.
- Design of front layouts, general and internal arrangement of panels.
- Design of control and protection logic diagrams and full schematics.
- Interface between panels and schematic modifications.
- Preparing BOM tables.
- Preparing DCS I/O list.
- Preparing cable lists.
- Preparing wiring/connections lists.
- Preparing technical submittals for the consultant and reply consultant comments of technical issues.
- Following the complete process of the project and providing technical feedback regarding base and detailed design in full compliance to specifications.
- Attending meetings with clients and subcontractors to achieve projects goals and complying projects specifications.
Job Description:
- Design of SLDs and CPMs.
- Design of front layouts, general and internal arrangement of panels.
- Design of control and protection logic diagrams and full schematics.
- Interface between panels and schematic modifications.
- Preparing BOM tables.
- Preparing DCS I/O list.
- Preparing cable lists.
- Preparing wiring/connections lists.
- Preparing technical submittals for the consultant and reply consultant comments of technical issues.
- Following the complete process of the project and providing technical feedback regarding base and detailed design in full compliance to specifications.
- Attending meetings with clients and subcontractors to achieve projects goals and complying projects specifications.
Projects:
- KAIA - King Abdul Aziz International Airport, KSA.
Job Description:
- Design of SLDs and CPMs.
- Design of front layouts, general and internal arrangement of panels.
- Design of control and protection logic diagrams and full schematics.
- Interface between panels and schematic modifications.
- Preparing BOM tables.
- Preparing DCS I/O list.
- Preparing cable lists.
- Preparing wiring/connections lists.
- Preparing technical submittals for the consultant and reply consultant comments of technical issues.
- Following the complete process of the project and providing technical feedback regarding base and detailed design in full compliance to specifications.
Projects:
- KAIA - King Abdul Aziz International Airport, KSA.
- PP12 - Combined Cycle Project, KSA.
Job Description:
- Design of SLDs and CPMs.
- Design of front layouts, general and internal arrangement of panels.
- Design of control and protection logic diagrams and full schematics.
- Interface between panels and schematic modifications.
- Preparing BOM tables.
- Preparing DCS I/O list.
- Preparing cable lists.
- Preparing wiring/connections lists.
- Preparing technical submittals for the consultant and reply consultant comments of technical issues.
- Following the complete process of the project and providing technical feedback regarding base and detailed design in full compliance to specifications.
- Attending meetings with clients and subcontractors to achieve projects goals and complying projects specifications.
Projects:
- WOLKITE, ALABA, HOSAINA, WOLISSO, BEDELE, GAMBELLA-I, GAMBELLA-II and METU Ethiopian 15, 33, 66, 110 and 230kV AIS Substations during contract period with GE Grid “ALSTOM Grid previously” as a package design engineer from November 2012 till March 2013.
- KAIA - King Abdul Aziz International Airport, KSA.
- Extension of GURRAYAT Open Cycle Power Plant, KSA.
- ASSIOUT Cement Factory - bus bar Protection, Egypt.
- As built of QASSIM Central Power Plant, KSA.
- As built of PP10 CCGT Power Station - Block C1, KSA.
- As built of Third Saudi Expansion of Holy Haram MAKKAH and Surrounding Areas, KSA.
Job Description:
Testing and Commissioning of HHI Hyundai for Heavy Industries and Schneider Electric one and half breaker arrangement 220kV GIS substation including below:
- Testing and commissioning of LCCs, Breakers, dis-connectors, earth switches, SAS and protective relays of all bays of the GIS.
- Interface between LCCs and control room.
- HV test of the GIS.
Projects:
- West Damietta Simple Cycle Power Plant, MEGA was the sub-contractor for Hyundai Heavy Industries CO and Schneider Electric.
Job Description:
Construction, Testing and Commissioning of ABB ITALY and ABB SWITZERLAND one and half breaker arrangement 220kV GIS substation including below:
- Installation of 220kV GIS and control room.
- Installation of HV bushings.
- Installation of steel supports for the complete scope.
- Installation of batteries and battery charger system.
- Installation of cable trays.
- Installation of grounding/earthing system.
- Installation of complete lighting and sockets systems.
- Cable connection and termination.
- Gas filling of all compartments.
- Testing and commissioning of LCCs, CTs, VTs, breakers, dis-connectors and earth switches of all bays of the GIS.
- HV test of the GIS.
- Finalizing all inspection lists with the consultant.
- Hand over to the consultant.
Projects:
- 6th October Simple Cycle Power Plant, EMEC was the sub-contractor for ABB Italy and ABB Switzerland.
Faculty: Engineering and Technology Department: Electrical Power and Control Grade: Excellent with the grade of honor Graduation Project: Utilization of Power Electronics in Hybrid Power Systems (Microgrid) Graduation Project Degree: Excellent Graduation Date: July, 2011