الحسين عبدالمنعم محجوب علي, Senior Electrical & Instrument Engineer

الحسين عبدالمنعم محجوب علي

Senior Electrical & Instrument Engineer

Petroneeds Services International (PSI) Co.

البلد
المملكة العربية السعودية - الدمام
التعليم
بكالوريوس, Electrical Engineering - Control & Instrumentation
الخبرات
16 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 5 أشهر

Senior Electrical & Instrument Engineer في Petroneeds Services International (PSI) Co.
  • السودان - الخرطوم
  • أشغل هذه الوظيفة منذ فبراير 2012

Electrical and Instrumentation Engineer in all of the project phases as a key project team member. I'm in charge of the following responsibilities: \n(1) During the Engineering: \n• Analyzing the project needs and requirements with the market accessibility. \n• Carrying the necessary technical discussions with PMC/Owner \n• Attending, directing and following up with the engineering subcontractor to generate deliverables. \n• Review engineering documents to make sure that the design meets the project objectives and all recognized industrial codes and standards. \n• Creation of conceptual and basic (initial) design for the project. \n• Preparation of specification and other documents. \n• Reporting the status to the engineering team leader. \n \n(2) During the Procurement phase: \n• Sending RFQs to vendors with all approved supporting documents. \n• Direct communication with vendors for technical views. \n• Making Technical Bid Evaluation (TBE) for all offers. \n• Follow with third-party inspector (TPI) to make sure that all materials and other components are in compliance with the project’s specifications and requirements. \n• Self-inspection of the arrived materials. \n• Acquisition of material documentations. \n \n(3) During the Construction: \n• Prepare Work Execution Plan (WEP); and required tools and equipments to avoid any delay. \n• Task assignments for E and I team and coordinate with other disciplines to finalize the job in time. \n• Arrange the activities based on priority. \n• Make sure all works are in compliance with engineering documents. \n• Laying, glanding and termination of all cables as per engineering documents. \n• Prepare construction records (such as MIRs, RFIs, STQs, checklist … etc.). \n• Inspection and installation of all E and I facilities properly. \n• Testing all installed equipments prior to start-up. \n• Make logic test for system to ensure the effectiveness of the system respond. \n• Killing the punch lists for E and I system and prepare the Mechanical Completion Dossiers (MCDs). \n• Pre-commissioning, recording and reporting for E and I facilities. \n \n(4) During the Commissioning phase: \n• Checking all facilities are ready for start-up. \n• Following with vendors to cover all requirements and to make sure that all E and I facilities are ready for initial operation. \n• Task assignments for E and I team to be ready for commissioning. \n• Start-up all E and I facilities and monitor the operation of plant to reach the stabilization state. \n• Readings are recorded periodically. \n• Commitment with the approved commissioning procedure and vendor recommendations. \n• Executing the Performance Test (PT) and list the readings; and prepare the documentations. \n• Supporting the Client’s staff for operation and maintenance prior the handover. \n• Training Client’s staff and operator to deal with Custody Transfer Metering Skid and Compact Substation.

E&I Proposal Engineer في Higleig Petroleum Services & Investment Co. Ltd.
  • السودان - الخرطوم
  • أبريل 2010 إلى فبراير 2012

During this period, I was in charge of the following responsibilities: \n1. Review the tender documents to get well-idea about the project. \n2. Extract my partition of work scope and check it to make clarification or to coordinate with other sections if needed. \n3. Preparation all required documents (datasheet, specification, drawings, criteria... etc) with RFQ letter to send them to the vendor (manufacturer) for offering. \n4. Till arrival of offers, calculation and estimation of all required materials to complete this work shall be done and formed as MTO, BOQ. \n5. After arrival of offers, the offers status will be the most important step by revise all effects (cost, warranty, quality, shipment, payment term ... etc). \n6. Putting time schedule which includes procurement, construction and commissioning period. \n7. Estimation of all required manpower, equipments & tools. \n8. Design of some systems if they are not available in tender documents such as lighting system, earthing, lightning protection system. \n9. Calculation of electrical loads (power rating) to help in various uses. \n10. Making site visit to collect data if needed.

Elect. Trainee في IDEA for Engineering Services (one of SWITCHGROUP)
  • السودان - الخرطوم
  • نوفمبر 2010 إلى ديسمبر 2010

Installation of generator set with all accessories and other works (cable laying, termination, glanding, installation bus-bar if needed, installation transfer switch or ATS automatic transfer switch if needed ... etc).

Assis. IT Engineer في Sudan-infra for IT Solutions
  • السودان - الخرطوم
  • مايو 2006 إلى أغسطس 2008

Analyzing equipment performance records to determine the need for repair or replacement. \n- Windows OS installation, updating drivers, software installation. \n- Coordinate with suppliers and with purchasing departments to facilitate purchases. \n- Assembly, configure and test computer hardware, networking software and OS software. \n- Diagnose hardware and software problems and replace defective components. \n- Computer maintenance and troubleshooting. \n- Preparation of thesis and researches for customers and colleges. \n- Work as course instructor for minor courses. \n- Monitor network performance to determine whether adjustments need to be made. \n- Perform data backups and disaster recovery operations. \n- Recommend changes to improve systems and network configurations and determine hardware or software requirements related to such changes.

Elect. Trainee في National Electricity Corporation (NEC) Sudan
  • السودان - الخرطوم
  • أكتوبر 2007 إلى نوفمبر 2007

During this period, I've rotated to 3 sections as mentioned below: \n1. Overhead Lines (OHLs). \n2. Cables. \n3. Sub-station.

الخلفية التعليمية

بكالوريوس, Electrical Engineering - Control & Instrumentation
  • في Sudan University of Science & Technology
  • أكتوبر 2009

Specialties & Skills

Instrumentation
Installation
Commissioning
Preparation
Wonderware
Self-study abilities
MS Office automation (Word,Excel,Powerpoint)
High interpersonal skills and perfect teamwork abilities
Ability to work under stress and for long periods in remote or rural locations
Operating System (Windows) installation & update drivers.
Generally, perfect skills in computer applications
Operational industry standards,regulation & API guidelines for design & selection of instrumentation
Using HART Communicator for logic test, instruments loop checking and adjusting.
Installation of equipment in hazardous areas
Familiar with smart measurement devices (multi-meter, earth tester, mA source … etc).
Follow up all safety, engineering and project procedures
Project Execution Plan (PEP)
Job Safety Analysis (JSA)
MS Project
HAZOP Study

اللغات

العربية
متمرّس
الانجليزية
متوسط

العضويات

Sudanese Society Engineering
  • Engineer
  • November 2009
Saudi Council of Engineers
  • Engineer with License No.: 298907
  • July 2016

التدريب و الشهادات

Effective Technical Reporting (الشهادة)
تاريخ الدورة:
October 2013
صالحة لغاية:
October 2013
General Industry Occupational Safety & Health Administration (OSHA) (الشهادة)
تاريخ الدورة:
July 2013
صالحة لغاية:
July 2013
Certified Automation Engineer (CAE) (الشهادة)
تاريخ الدورة:
June 2011
صالحة لغاية:
July 2011
PLC Advnaced Course - I (الشهادة)
تاريخ الدورة:
October 2010
صالحة لغاية:
October 2010
Control System (الشهادة)
تاريخ الدورة:
September 2008
صالحة لغاية:
September 2008
Electrical Power System (الشهادة)
تاريخ الدورة:
September 2008
صالحة لغاية:
September 2008