o Project Name: Upgrade Abqaiq filed Water Injection System.
o Company: Nesma and Partners.
o Location: Abqaiq GOSP#2, GOSP#5.
o Client: Saudi Aramco.
o Position: Commissioning Manager.
o Project Description:
o New Water oil Separator (WOSEP), GOSP#2.
o Salt Water Injection Pumps, GOSP#2, GOSP#5.
o Sea Water Injection Pumps, GOSP#5.
o Sea Water intake Pipe line (QUAD-1), to GOSP#5.
o Electrical and Utility Power Networks.
o East and West Pipe line Flanks.
o Sectionalizing Valve Station for east and West Flanks.
o New 69/13.8 KV Substation in GOSP#5.
o Fire Station.
o Security Gate House and Security System.
Project Description:
Pre-Commissioning, Commissioning, Start-Up and Performance Tests
of FBC, GSRC Projects including Residential Buildings ( 13-Bildings)
and Utility Support facilities as per Followings, -
115/13.8KV Electrical source substation fed from FGP Plant
Substation, 380/115 KV.
Emergency Power Supply System and Generators.
Chiller Plant and chilled/ HVAC systems.
Potable, Irrigation, Raw water, Fire Water, Drainage Plants and
Networks.
Electrical and Utility Power Networks.
STP Plant.
Community, Recreation and Diwaniya Centers.
Medical Clinic and Laundry.
Fire Station.
Security Gate House and Security System.
Project Description:
Pre-Commissioning, testing, commissioning and energize of the
Following:
380KV GIS System 13 Feeders, 2-Incomers and 1- Bus
Coupler.
115KV GIS 10 Feeders, 2- Incomers . and 1- Bus
coupler.
115/13.8 KV 50/66MVA Power Transformers .
13.8/115KV 45MVA Power Transformers.
115/11 KV 20MVA Power Transformers.
13.8 KV, 11KV, 480V Switchgears.
Control and Protection Systems.
SAS, SCADA and RTU Systems.
Fire alarm and Protection Systems.
HVAC Systems.
Project Name: Abqaiq Power Cogen-Plan Gas Turbine Generator & HRSG.
o Company : Alfanar.
o Location: Abqaiq, Eastern Region.
o Client : Saudi National Grid(SEC NG), Saudi Aramco.
o Position: Testing and Commissioning Team Leader.
o Project Description:
Testing and Commissioning of the Followings:
Interface of Abqaiq Substation 230/115KV, Jawatha
and Al-Uqauir 380/115KV Substations.
Al-Uqair 380KV/115 KV BSP.
PSA system and interface with Dispatcher.
Open/Closed Loop Checks and Verification.
Line Stability and end to end Tests.
Project Description:
Pre-Commissioning, Testing and Commissioning of the 5- Substations,
each consists of:
115KV GIS 8 Feeders, 2- Incomers . and 1- Bus coupler.
115/ 13.8 KV 50/66MVA Power Transformers .
13.8 KV, 480V Switchgears.
Control and Protection System.
SAS and RTU System.
Fire alarm and Protection Systems.
HVAC Systems.
Project Description:
Pre-Commissioning, Commissioning, Start-Up, Warranty of Al-Qassim
Power Plant which consists of:
12 No’s of Gas Turbine Frame#5 7-EA Mark-2 Speed-troncic
Controller.
6 No’s 11/13.8 Kv 50/67MVA power Transformers.
13.8Kv, 4.16Kv, 11Kv, 480V Switchgears and MCC, s.
DCS and SCADA and RTU systems.
Power Plant Automation and DCS system.
GT’s and Power System Protection Systems.
Integration of interface with Generation Dispatcher Center.
Water Treatment Plant.
Fuel Oil Treatment and Forwarding Plants.
Air Compressors Plant.
Fire water Plant.
Control and Scada Buildings.
Administration Buildings.
13.8/115/KV Substation.
Fire alarm and Protection Systems, Telephone, DATA, Systems.
Project Name: Madina Bulk Plant
o Company : Arabian Bemco Contracting.
o Location: Al-Madina, Western Region.
o Client : Saudi Aramco.
o Position: Testing and Commissioning Senior Engineer.
o Project Description:
Pre-Commissioning, Commissioning, of the Following:
Oily Water Sump Pumps,
Fire Water Pumps (motor Driven and Diesel Generator Driven).
Diesel Loading Pumps.
Gasoline, Kerosene Pumps.
Oil Transfer Pumps.
Raw Water System.
Emergency Diesel Generator.
Foam Skids, and Storage Tanks
33KV, New Transmission Line.
33KV, 480 V, 220V Switchgears.
Switchgear Building, Loading Pumps Station Building, admin
and Control Buildings.
Project Description:
GT, GE-7FA, 173 MW, 6.9 KA, 3600 RPM.
Power Transformers (18 KV/230 KV, 240 MVA OLTC).
Combined Static Start Excitation System (LCI/EX).
Packed Control Compartments (GE-PEECC) wiht related MCC’s
Switchgears, C.B’s, Disconnect and Earth Switches.
Gas compressor skids.
Service and Instrumentation Air Compressors Skids
Hydrogen Generation Plant skids, GE supplied.