Senior Mechanical Site Engineer
South West Architecture
Total years of experience :35 years, 10 Months
• Control and monitor of contractor’s construction activity and assured the project is delivered according to budget, conformed to plan, schedule and quality.
• Review and proofread plans, specifications, codes, shop drawings, material proposals, reports, contractors submitted schedules, change orders, progress reports and billings.
• Inspections and approval of contractor’s construction procedure and installations and materials delivered on site prior to installation and witness to testing and commissioning for all works related to mechanical, plumbing, drainage and fire protection and HVAC.
• Facilitate coordination on site and conduct coordination meetings with the contractors.
• Implements project safety regulations and quality standards on site.
• Detailer designer for HVAC Plumbing for the period Feb. to June of 2008.
• Supervise, coordinate, monitor and control project construction and installation.
• Organized and planned for mechanical and HVAC works on site.
• Report and present project status, costs and schedule information as per requirement of the project and company organization.
• Arranged schedule, manpower distribution, and material requirements on site.
• Prepared and review of shop drawings, prepare material proposals for consultant approval.
• Prepared progress status and attend site meetings..
• Assigned for some time as an engineer in the company's manufacturing /assembling plant of fans and blowers and organizing the material requirements, scheduling and control of quality.
• Supervise, coordinate, monitor and control project construction and installation.
• Organized and planned, arranged schedule and material requirements for mechanical and HVAC, Plumbing and fire fighting works on site.
• Performed material estimates, arrange personnel and analyze project requirements.
• Prepared and review of shop drawings, prepare material proposals for consultant approval.
• Coordinate and issued RFI and propose changes on installation for any discrepancies on site.
• Take part and coordinate the testing and commissioning of the installed system.
• Attend progress and coordination meetings on site.
• Inspection and approval of works and assure quality of works to comply to project requirements for all works related to mechanical such as HVAC, Plumbing, fire fighting, process piping. And ensure work is done on time and within budget limit.
• Supervise contractors activities and installation methodology.
• Issued appropriate action to deviation, changes occurred on site.
• Review and approval of contractor's shop drawings, and material proposals.
• Review and monitor contractor's progress and evaluate progress billings.
• Witnessed, approved and keep records of contractors testing of works on site.
• Conduct coordination meetings among contractors on site.
• Supervise, organized, coordination and planned and control project for mechanical and HVAC, and Plumbing and fire fighting works on site.
• Arranged schedule, manpower distribution, and material requirements on site.
• Review shop drawings and estimate material requirements on site.
• Performed material take off and assisted the estimating department.
• Arranged the preparation and take part in the testing of installed system prior for request for approval of the consultant.
• Attended coordination and progress meetings and prepared progress reports.
• Supervised control and organized the installation of all equipments and building facilities related to mechanical including the layout of production machineries, plumbing and fire fighting system, and compressed air system installation.
• Supervisor in the mechanical department of the assembly section of engine generator sets and multistage submersible pumps.
• Support the design department in producing and development of products as per customer requirements.
• Arranged schedule and material requirements to deliver the product as per specification on due time and within budget.
• Performed periodic maintenance of equipments and factory facilities.
• Prepared and developed shop drawings, and estimate of material quantity for site installation.
•Supervised installation of pipes and both rotating and static equipments like boilers, Engine generator sets and powerhouse system, cooling towers, fuel tanks, pumps, compressors, water treatment plant, HVAC, and factory production machineries.
• Have worked as an engineer in the maintenance department after the construction of of the textile mills.
• Prepared schedule and performed periodic maintenance and monitoring for the optimize performance of equipments.