Network Engineer
Urbane (Pvt) Ltd (Punjab Safe Cities Authority )
Total years of experience :8 years, 2 Months
Department of Operation and Maintenance Service of the Punjab Police Integrated Command, Control and Communication (PPIC3) Centre Project.
Hands on experience Routing & Switching (Department of Operation and Maintenance) Setup i.e. NV Sites, PTSC, JTMS, RLMS, VMS
Working on Routers: AR2240, AR550, AR530
Working on switches: S2700 series .Technical Support Resolving Network Querries relevent to Data Com
HEC Project for smart and safe Universities
Survey of Sites, Planning, documentation, Fiber Laying by using Star Topology, Piping, ducting, Wireless Wifi APs installion, Servillance: IVS Cameras installation
Work at Fiber Optics
Working as a 'Electrical ( Trainee ) Engineer' at Sapphire Electric Power Generation Company Pvt Ltd .
Which is the sub unit of 'Sapphire Group of Companies' Or Sapphire Textile Mills.
Hereby, i'm working at GE Jenbacher Gas Engines with model 320/620 generating Electricity of 14 MW .
Working Niigata Engine operated by using Furnace Oil / Diesel Generating Electricity of 21.2 MW.
Wartsila operating by using of Furnace Oil
Generation of Electricity 25.6 MW .
Working at WAPDA Grid station of 6 MW.
Also working in distribution depart of Electricity at Sapphire Textile Mills.
Having acknowledge and management, documentation of Control room regarding Electricity issues to resolve at Electrical Engineer and Managerial level.
Electrical Power Distribution and
Power consumption inspection Area Manager:-
Working at 132KV Grid Station and further distribution of Electricity in different Processing plants
Acknowledgement regarding electric appliances,
Function of Grid Station & its merits n demerits.
Auto Power Transformers Feeders Relays Bus Bar SF6 Breakers Lightening Arrestor PT CT Rectifiers Batteries. Capacitors Insulators semiconductors Acknowledgement about Safety terms.
Power distribution to the Native villages and cities.
INTERNSHIP:
Six (06) week internship at FESCO (WAPDA) Jhang.
Complete acknowledgement about
Power Generation--High tension distribution
FINAL YEAR PROJECT:-
Power Saver for Industries and Commercial Establishments.
Detail:-
Acknowledgement about Tariff n bulling.
Power Factor correction
Power Factor improvement
Below than unity power factor losses.
P.F merits & demerits
PROJECTS:-
Did a project and research study on doubly fed induction.
Generator systems for wind turbine.
Did FYP a project of Electrical Power and embedded system (Power saver for industries and commercial establishments).
Used Cisco Packet Tracer during lab of digital communication and computer networking.
Have ability to understand Power generated machines.
Have done Cisco Packet Tracer for digital communication and computer networking.
Have done Sim-Electronics and Power-sim in MATLAB.
Have ability to test circuits using Proteus simulation.
Have ability to design circuit PCB layout on Eagle software.
Have done Lab View software for Electronic Circuits.
Have hands on knowledge of Microsoft Word,
Power point and Project and Excel.