إسلام بكير, Divisions Manager

إسلام بكير

Divisions Manager

RISAL

البلد
المملكة العربية السعودية - الخبر
التعليم
ماجستير, Proejct Management
الخبرات
16 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 4 أشهر

Divisions Manager في RISAL
  • المملكة العربية السعودية - الجبيل
  • أشغل هذه الوظيفة منذ مايو 2020

Hydro Jetting, Hydro Milling, Catalyst loading and unloading, Chemical cleaning and Decontamination Services for all ARAMCO, SABIC, SADARA, MAADEN and Saudi Electricity affiliates

Project Manager في AYTB
  • المملكة العربية السعودية - الخبر
  • أشغل هذه الوظيفة منذ يناير 2019

- Clean Fuel Pipe Lines Project (24Inch & 30Inch ) Inside Ras Tanura ARAMCO Refinery, Causeway and Terminal.
- Total 70 KM of Pipe Lines in Brown Field.
- Ensure following ARAMCO Quality and Safety Standards.
- Setting a budget for the project. Review and develop P&L monthly reports for the project and ensure that the expenses are meeting the budget. Monitoring budget reports.
- Maintains open communication with contractors, works with Superintendents to recognize underperforming subcontractors timely with project notifications.
- Manage the day-to-day working, utilization, implementation and technical consultants engaged on client assignments. From ensuring the correct material turns up before a job, to explaining the work ethics and activities to colleagues and contractors.
- Report progress on projects by suitable media to sector management, maintain and update project reporting, checkpoints and financial reporting to a high standard.
- Develop subcontracts, technical and commercial evaluate quotations, monitor contractors’ daily progress, technical and execution guide to project team and contractors.
- Develop contacts with senior staff, directors, and other influential staff within each account during the implementation phase.
- Co-ordinate required support levels and training.
- Produce reports on each project at agreed intervals, and whenever substantive actions are required.
- Arranging and leading on regular team and contractors’ meetings including and not limited to Daily construction coordination meeting, Weekly departmental Constraints meeting and Weekly progress meeting.
- Monitor the mobilization of resources as per the EAC.

Construction Project Manager في ArKAD Engineering and Construction
  • المملكة العربية السعودية - الخبر
  • فبراير 2015 إلى يناير 2019

- ARAMCO OMPP 80 Gas, Oil and Water Injection wells.
- Total 400 KM PipeLines / Flow Lines underground and above ground.
- ARAMCO Master Gas Pipeline Project, 56Inch underground Pipeline 198 KM
- Maintains open communication with contractors, works with Superintendents to recognize underperforming subcontractors timely with project notifications.
- Manage the day-to-day working, utilization, implementation and technical consultants engaged on client assignments. From ensuring the correct material turns up before a job, to explaining the work ethics and activities to colleagues and contractors.
- Report progress on projects by suitable media to sector management, maintain and update project reporting, checkpoints and financial reporting to a high standard.
- Develop subcontracts, technical and commercial evaluate quotations, monitor contractors’ daily progress, technical and execution guide to project team and contractors.
- Develop contacts with senior staff, directors, and other influential staff within each account during the implementation phase.

Senior Project Engineer في GCC KSA / ARAMCO Projects
  • المملكة العربية السعودية - الخبر
  • أبريل 2013 إلى ديسمبر 2014

- Increase East-West Pipeline Capacity Project inside 11 Pump stations and 2 Pressure Reducing Stations.
- Installing 11 Drag Reducing Stations and Daylight 48 Inch Piping inside the Pump stations.
- Interface coordinator with the client (ARAMCO).
- Manage GCC’s planning team on issuing the invoices and Baseline Schedule.
- Monitoring Engineering deliverables, activities and man-hours.
- Submission of all client deliverables.
- Review and Supervise 5 Camps in Engineering and Construction.
- Manage EPC invoices and approval client (ARAMCO).
- Analyze/Monitoring Saudization percentage.
- Contractual reviewing/Monitoring subcontractors’ activity execution.
- Facilitate HAZOP studies, Risk Management implementation, Schedule Optimization, Constructability studies … etc.
- Managing the procurement cycle.
- Review all subcontractors’ commercial/technical bids.
- Manage Resources control (Manpower & Equipment) to meet the execution rates during the project phases.
- Analyze progress for all subcontractors, review progress reports.
- Monitoring vendors’ delivery dates.
- Member of the cost control team (forecasted expenses, manpower).
- Focal point: for any issue regarding procurement, safety and management.
- Certified as a Work permit receiver.
- ARAMCO ID no. 8072571.

site construction manager في NEVERSEL Ltd
  • مصر - الغردقة
  • يوليو 2012 إلى أكتوبر 2013

Installation of two Fixed Roof Tanks in Marsa Allam airport. A1 Jet Fuel Tanks
Installation of full pump station of A1 Jet Fuel in Marsa Allam Airport
CLIENT: CHEVRON AVIATION

Senior Erection Engineer في ASEC ARESCO
  • مصر - بني سويف
  • أكتوبر 2012 إلى فبراير 2013

Responsible for erection two vertical raw mills

Senior Erection Engineer في Energya steel (Al SWEEDI)
  • المملكة العربية السعودية - جدة
  • يوليو 2009 إلى يونيو 2012

1- Installation of Beni Suif Cement Company Rotary Kiln
2- Installation of 3 fans system in Tabuk Cement Company
3- Installation of Steel Structure in SWCC Jeddah KSA
4- Installation of 3 silos in AlMinyah Cement Compnay

Erection Engineer في ASEC ARESCO
  • السودان - أم درمان
  • يناير 2008 إلى يونيو 2009

Responsible for erection Rotary kiln in WAAD AL SHAMAAL cement company

الخلفية التعليمية

ماجستير, Proejct Management
  • في SBS - Swiss Business School
  • فبراير 2021
بكالوريوس, Mechanical Engineering
  • في Faculty of Engineering, Alexandria University
  • يوليو 2007

Graduation Project: Fire fighting Tasks: 1-foam firefighting 2-petroleum tanks fire fighting systems design 3-practical fire fighting project 4-sprinkle system 5-CO2 gas fire fighting system

دبلوم عالي, Advanced Project Management
  • في STANFORD UNIVERSITY
  • يناير 2004

Financial, Interface, HR, Albert Theory, Fish Bone analysis, Portfolio Management, PMP, Stakeholders Satisfactory and Communication with clients

Specialties & Skills

Cost Control
Project Management
Oil and Gas
Primavera P6
Primavera P6
Cost Control
MS word, MS Excel, MS Powerpoint

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس

التدريب و الشهادات

Incident Investigation (تدريب)
معهد التدريب:
Arab Safety Training Center
تاريخ الدورة:
January 2014
المدة:
100 ساعة
Basic Life Support (تدريب)
معهد التدريب:
HATC KSA
تاريخ الدورة:
February 2014
SA WPR (تدريب)
معهد التدريب:
ARAMCO
تاريخ الدورة:
March 2014
المدة:
30 ساعة
Primavera P6.8 (الشهادة)
تاريخ الدورة:
January 2011
Supervisory Management (الشهادة)
تاريخ الدورة:
May 2014
صالحة لغاية:
January 9999
NEBOSH (الشهادة)
تاريخ الدورة:
May 2014
صالحة لغاية:
January 9999

الهوايات

  • Squash, Fencing and horse ridding
    1st Fencing Egyptian team for four years. won many competitions in Squash. won many certificates in horse ridding.