eslam hussain hassan, Project engineer

eslam hussain hassan

Project engineer

PMS

Location
Egypt - Cairo
Education
Bachelor's degree, Electrical engineer
Experience
7 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :7 years, 4 Months

Project engineer at PMS
  • Egypt
  • July 2009 to August 2015

1 - Petroleum Marine Service (PMS) from 2009 to present.

A- Project Engineer (On-board PMS-BURULLUS) from 20/07/2014 Till Now.
Project: Multi Role field support VSL
Client: - Burullus Gas company.
Location:-Burullus field (Mediterranean)
• Monitor as PMS Company REP. implementations and adequacy of the project contract
• Control, coordinate and negotiate the operation duties on the Consortium parties (PMS-DEEP TECH).

B- Project Engineer (On-board DSV Seamec Alliance) from 01/05/2014 To 02/07/2015
Project: Hilal offshore development
Client: - GULF OF SUEZ PETROLEUM COMPANY
Location:-GUPCO FIELD (RED SEA)
• Installing 4.5’’ riser clamp at OCT-B
• Debris removal at SEDKI P/F
• Anode sleds relocation at SIDKI P/F
• Install two 18’’ Spool and two 8’’ spool and those spool was Non-metrology Spool.
• Install two 16’’ Spool and blind flange.


C- Project Engineer (On-board DSV Seamec Alliance) from 09/09/2013 To 03/04/2014
Project: DEKA FIELD DEVELOPMENTS
Client:- Belayim Petroleum Company
Location:-Denis field Mediterranean
• Mobilizations
• Installing 24 Mattresses
• Pigging and hydro-test work operation between 16’’ DNW1 P/L and DE 4.4 KM
• Pigging and hydro-test work operation 10’’ Karawan P/L 2.5 Km.
• Free span for P/L DNW1-DE 4.4 Km.
• Pigging and hydro-test work operation for 10’’ Pilo P/L 5.5 Km
• Pigging and hydro-test work operation for 16’’ DS6-DE P/L 900 m.
• Installing DNW1 Plem and cover
• Installing D4 Plem and cover
• Pigging and hydro-test work operation for 16’’ DN-DNW1 3.6 Km.
• Installing 14 spool 16’’ and 4 spool 10’’
• Dewatering and Nitrogen purging for 8.5 Km P/L passing through three Plems (DN, DNW1 and DE)
• Technical office and drawings
D- Project Engineer (BARG:11)
Projects: marine field development (2012-2013)
Client: Belayim Petroleum Company
Location:- (RED SEA)
• 6” and 14” Risers fabrication and installation at RLP, PP-3 113-M2 and 113-M3
• Subsea spools fabrication and installation of 6” and 14” (NON metrology spools )
• Fabricate and install the Metrology spools (tie -in spool )closing spool at both platforms
• Pigging and hydro test for 6" pipeline from top of riser to top of riser
• Pigging and hydro test for 14" pipeline from top of riser to top of riser


F-Working as Maintenance Engineer (2009-2012)

2 - Al alamia oil services & Training co. (for 1 month only)

Electrical engineer at Armed Force
  • Egypt
  • April 2008 to May 2009

a- Responsible for executing designs of the hospital.
b- Quantities surveying for executing works and sending reports to our head office in

Education

Bachelor's degree, Electrical engineer
  • at HTI
  • May 2007

B.Sc. degree in ELECTRICAL ENGINEERING The higher technological institute 10th of Ramadan city may 2007 B.Sc. Grade: Good (71%) Final Project: (Digital Signal Processing & Digital Filters) Excellent

Specialties & Skills

Electrical
microsoft office, MS project, Autocad and PMP

Memberships

PMI
  • PMI ID NO 2214906
  • April 2011

Training and Certifications

PMP (Training)
Training Institute:
NEW HORIZON
Date Attended:
May 2011
Duration:
32 hours