QC /QA and QHSE Manager
Sino-Tharwa Drilling Company
Total years of experience :22 years, 8 Months
Follow up all third party companies which applied NDT on RIGS Parts
Such as lugs, equipment, substructure and sheaves.
Preparing the WPS with the supporting PQR.
Inspection all materials which installing in the rigs.
Preparing and Reviewing WPS and PQR according to Project Specification and Codes (ASME IX &ASME B31.3.)
Witness of welder qualification tests including all NDT& mechanical tests.
Conducting Welders Performance Qualifications (WPQ).
Fabrication & erection stain steel pipes according to ASME B31.3.
Fabrication & erection low alloys pipes according to ASME B31.3.
Fabrication (B 165(UNS N04400)) pipes according to ASME B31.3.
Performing NDE for fabrication and weld of critical and non-critical pipes as per Project Specification and Codes (ASME IX &ASME B31.3).
Performing Quality inspections in accordance with the ITP (i.e. Pressure Test, Painting, Coating, Insulation, and PWHT).
Performing Visual Inspection according to ASME B31.3
Performing Ultrasonic Inspection Tests according to ASME B31.3
Performing Dye-Penetrant Inspection Tests according to (ASME B31.3
Performing Magnetic-Particle Inspection Tests according to ASME B31.3
Radiographic Film Interpretation according to ASME B31.3
Reviewing of construction documents, such as NDE & PWHT Reports, Project Procedures and Test Packages.
Fabrication & erection all carbon steel pipes & tanks
Carries out dimensional inspection on the items before and after welding
Applying the WPS with the supporting PQR for each joint.
Carries out inspection VT& RT & PT on welding.
Fit up for all joints & Visual inspection for all welds
Follow up NDT inspection according to ASME B31.1 (Power Piping )
Release tests and test package for carbon steel lines
Follow up NDT inspection according to API 650 Code (Oil Storage Tanks)
Carries out all inspection VT & RT & PT on welding of tanks
Fabrication & erection all carbon steel pipes
Fabrication & erection all polyethylene pipes
Fabrication & erection all fibreglasses pipes
Fabrication & erection all ductile iron pipes
Carries out dimensional inspection on the items before and after welding
Applying the WPS with the supporting PQR for each joint.
Carries out inspection on welding.
Fit up for all joints & Visual inspection for all welds
Follow up NDT inspection according to ASME B31.1 (Power Piping )
Release tests and test package for carbon steel lines.
Fit up for all joints & Visual inspection for all welds
Follow up NDT inspection according to ASME B31.1 (Piping Process
Carries out dimensional inspection on the items before and after welding
Applying the WPS with the supporting PQR for each joint.
Carries out inspection on welding.
Fit up for all joints & Visual inspection for all welds
Follow up NDT inspection according to ASME B31.1 (Power Piping )
Release tests and test package for carbon steel lines
*Applying NDT Inspection (RT &PT) according to manufactories codes
*Preparing RT reports & PT reports according to manufactories codes
* Preparing WPS & PQR & Welder Certificate according to manufactories codes.
حصلت علي درجه البكالوريوس بنسبه مئويه متراكمه 59.5 %