Fady Daowd, Sr. Interior Architect

Fady Daowd

Sr. Interior Architect

Classical Palace

Location
Qatar - Doha
Education
Bachelor's degree, Bachelor of Interior Architectural
Experience
20 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 11 Months

Sr. Interior Architect at Classical Palace
  • Qatar - Doha
  • My current job since May 2013
Senior Interior Architect / Team Leader at Classical Palace
  • France
  • May 2013 to April 2014

05/2013 - To date
Classical Palace - Doha - Qatar

Senior Interior Architect / Team Leader
Duties:
• Participated in all phases of the interior architectural design of mixed-use developments, various types of buildings for projects undertaken by the firm starting from concept design till handing over the project - in Qatar.

• Responsible for reviewing and responding to all clarifications, materials and shop drawings submittals in compliance with tender specification and project requirements to ensure the quality of works in accordance with the time frames and mile stones.

• Responsible for monitoring and managing site supervision team in compliance with the Project Specification and QCS, checking of documentations related to the works and reviewing of the contractor's monthly valuations and reports.

• Preparation of all required control logs to monitor the contractor and subcontractors performance for the sequence of work and to identify delayed activities to deploy all required efforts and corrective actions.

• Coordinating activities of various trades to ensure the execution of works in proper way and complying with the design and Projects documents.

• Preparing drafts of site instructions and all clients' requirements.

• Preparing replies on the consultants and subcontractors correspondences.

• Preparing and conducting regular weekly, bi-weekly and coordination meetings with client, consultant and suppliers to monitor and enhance the quality and performance of executed works.

• Monitoring the material deliveries to site to ensure the quality and compliance with approved material submittals.

• Responsible for snagging/de-snagging and preparation for handing over requirements such as the as built drawings operation and maintenance manuals, warranties, and spare parts.

• Responsible for preparing handover completion certificates and related closing out documents.


• New Rayyan Palace - Ancillary buildings (21 Building) - Construction cost US$ 18 Million.
Consultant: Arab Architects.

• Qatar Tennis Court - The Emiri Enclosure - Construction cost US$ 4 Million.
Design and built project (from concept design to hand over)

• Banush Club - QAFCO - Messaeid - Construction cost US$ 2 Million.
Design development, preparing shop drawings and material submission and approval.

• Mohamed El Sulaity Villa - on going project.
Design Concept and furniture selection.

• Ghanem El Kawary villa - on Going project
Participate in the design concept.

Head of interior design & Associate Partner at Classical Palace
  • India
  • January 2004 to April 2012

01/2004 - 04/2012
Designers Consultant & Associates
Head of interior design & Associate Partner.
Duties:
Put the conceptual design for several types of projects by making sketches and moods for my clients that meets their needs in their properties, also supervise the rendering team to make sure that the design is as I wanted to be, then work with the FF&E department to make the write selections for the design spirit, then finally visit the site several times to make sure of the details and execution phase.


• Abu Nawas Hotel-Tunis Designers Consultants JV Agora Architects - Construction cost US$ 45Million.
Developer: LAICO (Libyan African Investment Company)

• LIBYA HOTEL (2-FEBRUARY HOTEL) -Togo - Construction cost US$ 50Million.
Developer: LAICO (Libyan African Investment Company)

• Libya Hotel, Bangui-Central Africa - Construction cost US$ 25Million.
Developer: LAICO (Libyan African Investment Company)

• LAICO Okoume Palace Libreville Hotel, Libreville GABON - Construction cost US$ 60Million.
• Developer: DAMA for Engineering and Technology.

• Sonesta Hotel Extension, Egypt - Construction cost US$ 20Million.
Developer: Sakkara Group Company.

• Lybia Hotel, Bissau- Africa - Construction cost US$ 20Million.
Developer: LAICO (Libyan African Investment Company)

• Novotel Kigali, Rwanda - Africa - Construction cost US$ 20Million.
Developer: SOPROTEL S.A.R.L. (Hotels and Tourism Promotion Investment Company)

• Mojito Floating Hotel - Egypt - Construction cost US$ 10Million.
Developer: Sakkara Group Company.

• Concerto Floating Hotel - Egypt - Construction cost US$ 10Million.
Developer: Extension Travel Company.

• Sonesta Nile Goddes- Floating Hotel - Egypt - Construction cost US$ 15Million.
Developer: Sakkara Group Company.

Some other different types of projects varies from hospitality, residential buildings, palaces, private residential villas and hospitals that I worked in however I think the above projects is enough to show my experience field - if the rest of references is required please do not hesitate to request it as it is all available with details.

at IPhoto Plus
  • January 2011 to December 2011

• AutoCAD 2D/ 3D R 2011- (AIA Standards)
• Photoshop CS 4
• Freehand 11.0
• IPhoto Plus 6.0

at 3D Max R
  • January 2011 to December 2011

• 3D Max R. 2011
• Power Point presentation

Graphic Designer at Time Creation - Graphic Agency
  • June 2002 to December 2003

06/2002 - 12/2003
Time Creation - Graphic Agency
Graphic Designer
IT/SOFTWARE TOOLS

Education

Bachelor's degree, Bachelor of Interior Architectural
  • at Faculty of Fine Arts
  • July 2002
Bachelor's degree, Fine Arts
  • January 2002

BSc. Interior Architectural - Fine Arts, 2002

Specialties & Skills

ARCHITECTURAL
ASSOCIATE
AUTO CAD
CLIENTS
CLOSING
CONCEPT DESIGN
CONCEPTUAL DESIGN
CONCERTO
DESIGN DEVELOPMENT
INTERIOR DESIGN

Languages

Arabic
Beginner
English
Beginner
French
Beginner