Maintenance and spare parts warehouse Manager
pelliconi egypt (multinational company)
Total years of experience :12 years, 7 Months
my job is a maintenance and spare parts warehouse manager at PELLICONI Egypt (multi - international) factory
For the metal crowns production for the glass bottles.
Responsibilities: -
1. Manage the cycle of electrical and mechanical maintenance for the machines.
2. Apply the preventive maintenance schedule.
3. Do a connection between pelliconi Italy and Egypt for the maintenance working.
4. Responsible for the warehouse of the spare parts and mange it by SIGIP (before) and SAP (now) system.
5. Arrange with the outsources for some working as welding, IT, Turning workshops…. etc.
6. Arrange with EL-HAGGAR for the monthly maintenance for the compressors (Kaiser).
7. I am doing all the maintenance for the chillers (electric, water and refrigerant circuits).
may job is an electric maintenance engineer in KIRIZI factory
For the engineering products, El-Abor city, El-Qualubea.
- Working in control (classical & PLC) and power applications.
- Working in electric drives (LENZE, LS and Telemecanique ALTIVAR) and applity to control in the motors by its.
- Working in the cooling units (Chillers) (maintenance and design control circuit for it).
- Working in Plastic Injection machines (NEGRI-BOSSI and HITIAN).
- Design and execute electric panels.
Bachelor of Engineering and Technology in elec. engineering, June 2011 * University: Banha University. * Faculty: Faculty of Engineering and technology. * Department: Control. * Specialization: Control. * Graduation Grade: Good - '' 69.26 % ''. * Graduation Project Grade: Excellent.
* Egyptian high school: El-koba Secondary School, graduated June 2006. * Accumulated score: 91.95 %.