Assistant Resident Engineer
Parsons - Qatar
مجموع سنوات الخبرة :14 years, 10 أشهر
Construction of Flood Prevention Scheme (FPS-Phase 3) for Outer Areas, C850/3
Worked as site supervising civil engineer for KAHRAMAA’s phase-13 substation project
End to end responsibility as a representative of client at site for all site related matters.
Constructability checking of all drawings prior to construction at site
Review of shop drawings, material submittals etc sumiited by contractor
1 - Working as Resident Engineer - Civil for FEWA project 83E/2016 - 33/11KV SUBSTATIONS & CABLE WORKS IN NORTH EMIRATES
2- End to end responsibility as a representative of client at site for the completion of project as per Contract requirements
Worked as Civil Engineer for KAHRAMAA’s PH-11 & PH-11 Addendum projects which includes 66/11kV GIS substations and multi storey car park building
a) 66/11kV Grand Hamad Avenue(new) Substation and Multi Storey Car park building, Old Al-Ghanim (B+G+6 building)
b) 66/11kV Montaza-2 Substation
Ensuring that the ongoing works done by contractor and ensuring that works are being executed per the KAHRAMAA specification/QCS/approved drawings/approved method statements/ Inspection and Testing Plan/HSE requirements
Preparing of Daily and weekly progress report for submitting to client
Assists the Senior Resident Engineer as and when required by giving proper inputs/information such as for preparation of monthly & weekly reports, updates for minutes of meeting and any other information required by client
Certification of progress measurement by subcontractors in line with contract terms and conditions after checking the measurements at site
Issuing of Site Instruction to contractor at instances where it seems contractor executing the works are not in line with approved procedures, safety and quality requirements
Study of drawings prior to construction and checking the constructability with respect to site conditions
Witness concrete pouring at all times, checking the quality at site and ensuring that contractor follows concreting work procedure while placing the concrete.
Ensuring that comments made to subcontractor on RFI is being met at site prior to execution
File site history & progress photo as may be required for future
Maintaining the overall Inspection request log, site note log and other project information showing the current status along with supporting documents hyperlinked by using excel.
Maintaining proper track and revision history of all document transmittals by using excel such as drawings/method statements/material submittals etc along with their respective comment sheets and making use of the same for daily reference and monitoring of site activities
Attending weekly progress meeting with Contractor and preparing MOM
Company - Larsen & Toubro Limited
Project Name : MEW/087/2010-2011 —Construction of 8 NOS 132/11kv Substations, Kuwait
Client : Ministry of Electricity & Water
Period : August 2013 to November 2014
Job Profile : Sr. Civil Engineer
Worked as the Sr.Civil Engineer for the Construction of 3 nos 132/11kv substations at Kuwait
Managing of civil subcontractors “M/s Ali Sayegh Contracting & M/s Boodai contracting” at site towards the construction of 132/11kV substations
Monitoring the construction progress against the approved construction schedule
Conducting daily site walk through and ensuring that works are being executed as per approved drawings, specifications, and method statements
Ensuring that Subcontractor’s follows all the procedures of Project Quality Plan (PQP) and ensuring all tests as per Inspection Test Plan (ITP) are conducted.
Issuing site instructions to Subcontractor in case it seems works are being executed not in line with approved procedures, safety and quality
Conducting the inward material and ensuring suitability as per the specifications and approved drawings
Witnessing the tests on concrete, aggregates, steel, soil, water proofing membrane and other construction materials along with client
Witness concrete pouring always and assures that concrete is properly placed in accordance with the concreting work procedure
Ensuring that comments made to subcontractor on RFI is being met at site prior to execution
File site history & progress photo as may be required for future
Ensures that Subcontractor’s staffs are in receipt of the latest revision of approved construction drawings.
Monitor and ensure that comprehensive record of documentation and certification of work is maintained and assist in the satisfactory handover of the completed project to the client.
Maintaining the overall RFI log showing the status along with supporting documents hyperlinked by using excel.
Checking of red marked & as built drawings submitted by Subcontractor before final submission to client
Company - Larsen & Toubro Limited
Project Name: 132/33 kV SUBSTATION at Kalba -Sharjah, U.A.E.
Client : Abu Dhabi Transmission and Despatch Company (TRANSCO)
Consultant : Mott MacDonald (MML)
Period : June 2011 to August 2013 Job Profile -
Job Profile - Sr.Civil Engineer
Civil site in charge for 132/33 kV Kalba substation
Monitoring all civil related activities and arranging resources well in advance.
Ensures that works are being executed in accordance with approved drawings, specification and method statements and with adequate safety measures.
Proposing Construction Material to Client and obtaining approvals in a defined protocol within stipulated time.
Arranging inward material inspection by consultant for civil materials.
Preparation of Method statement for civil works, submitting to client and getting approval for the same
Preparation of construction programs such as two week look ahead schedules and monitoring the progress against the baseline schedule
Co-ordinate with suppliers/sub-contractors for supplying of materials well in time in order to avoid delays in the projects
Negotiation & Order finalization with vendors/subcontractors
Evaluating supplier’s / subcontractor’s performance over a period of time and intimating to management for future business
Attending weekly and monthly meeting with consultant
Preparation of MPCS schedules, DPR, WPR & MPR
Preparation of red mar up drawing and as built drawings.
Closing of all civil snag points within stipulated time
Company - Larsen & Toubro Limited
Project Name : 132/33/11kV NEW RIFFAH II SUBSTATION-Ras Al Khaimah, U.A.E
Client : Federal Electricity & Water Authority (FEWA)
Consultant : Lahmeyer International
Period : March 2010 to June 2011
Job Profile - Sr.Civil Engineer
Responsible for execution of civil works related to construction of 132/33/11kV GIS substation which include substation building, external drainage structures, internal interlock road, precast boundary wall, cable duct banks, surge arrestor foundations, lighting pole pedestals, external asphalt access road and structural steel items like gratings, transformer bay front enclosure and roof truss etc
Ensuring that works in progress such as excavation, backfilling, formwork, rebar works, concreting and other finishing works prior to inspection by consultant/client and recommending corrective measures if any
Preparing inspection request (RFI) to consultant and arranging inspection for all civil activities
Issuing RFC drawings to subcontractor’s and ensures the same is followed for construction purpose.
Checking of all types of materials like structural filling material, aggregates, reinforcement steel etc and their testing.
Ensures that approved method statements are available at worksite for each activity and gives onsite briefing to workforce.
Maintains the overall consumption details of the construction materials and recommends for the periodic testing as per ITP, PQP and specifications.
Keeping record of concrete pour cards, laboratory test results, concrete cube register, RFI log etc.
Coordinating with various subcontractors / specialized agencies etc. for their timely mobilization.
Preparing reconciliation of materials.
Company - Larsen & Toubro Limited
Project Name : 400 kv Kutta-Kozhikode TL Project
Client : Power Grid Corporation of India Ltd (PGCIL)
Period : July 2009 to March 2010
Job Profile - Civil Engineer
Worked as a civil engineer for the construction of transmission line foundations
Checking the subcontractor’s work in accordance with approved drawings and specifications.
Stub setting using total station for different type of Transmission line towers
Arranging for inspection of activities and getting the clearance for concrete pour from client.
Maintaining the concrete pour records and cube results.
Preparation of Measurement book for client invoicing
Subcontractor identification and finalization for different works
Solving of ROW problems.