Works under the technical direction of the Construction Manager and full coordination with Design Team to provide assistance in the supervision of the works undertaken by contractors, review and comments on contractor’s progress reports, supervise and assist in the technical supervision of the inspection engineers.
Key Projects:
Jeddah Stormwater Drainage Program (JSDP):
3rd phase of JSDP: Wadi Kura’a And Muraikh Project: Construction of a 365m long 11m high rock filled geomembrane system covered, a 8.91km unlined trapezoidal channel excavated into existing ground and a 34.09km concrete lined trapezoidal and vertical wall channel excavated into existing ground.
2nd phase of JSDP: KASC Project: Construction of a new 1000m long concrete 6-cells box culvert, outfall connection with an existing open channel and a 230m2 junction box.
2nd phase of JSDP: GHA-2 Project: Construction of a new 1000m long dam, (2) saddle dams and basin. Installation of a1000m hydraulic cut off wall through granite. Construction of new 6700m concrete channel and 3400m earthen channel with 13 road crossings. This included major utility relocation work.
1st phase of JSDP: Umm Al Khair: Construction of a new 1066m long dam and basin with capacity of 1.82 million m3. Installation of a1100m hydraulic cut off wall through granite. Construction of new 750m channel and which included major utility relocation work and tunneling.
1st phase of JSDP: Al Samer: Rehabilitation of existing dam. Construction of a new 3000m channel with major utility works.
Assures the quality of work and be completely familiar with the plans, specifications, particular specifications and construction methods for the phases of the work.
- Planning, developing and implementing PR strategies
- Organising events and exhibitions.
Helping the construction manager in the daily report and monitoring some of the daily activities.