مجموع سنوات الخبرة: 22 سنوات, 9 أشهر
مايو 2012
إلى حتى الآن
Managing Quantity Surveyor
في Dar Al Riyadh
البلد :
المملكة العربية السعودية - الرياض
KSA base consultant organization
King Abdullah Financial District, Riyadh: A development will provide more than 1.2 million square meters of mixed-use project comprising residential units, hotels, landscaping.
Duties:
• Manage commercial aspects, contractual issues and prepare the contractual correspondences
• Control of change management on the construction contracts
• Review, assess and issue recommendation on variations and other claims
• Manage the team of 9 quantity surveyors and 9 assistant quantity surveyors
• Finalize the Contractor’s Interim Payment Application and prepares the payment certificate and recommendation for client approval
King Abdullah Financial District, Riyadh: A development will provide more than 1.2 million square meters of mixed-use project comprising residential units, hotels, landscaping.
Duties:
• Manage commercial aspects, contractual issues and prepare the contractual correspondences
• Control of change management on the construction contracts
• Review, assess and issue recommendation on variations and other claims
• Manage the team of 9 quantity surveyors and 9 assistant quantity surveyors
• Finalize the Contractor’s Interim Payment Application and prepares the payment certificate and recommendation for client approval
أكتوبر 2011
إلى مارس 2012
Senior Contract Administrator
في Faithful+Gould
البلد :
المملكة العربية السعودية - جدة
UK base cost consultant organization
Faithful+ Gould provided the cost consultant services to the main contractor Saudi Bin Laden Group)
Jeddah Air Port extension project
Duties:
• Assess the sub-contractor’s variation orders and prepare the recommendation
• Coordinating with site based QSs in order to gather the site progress for main contractor monthly payment
• Negotiating with client consultant representative during the interim payment submission
• Ensure the contractual obligations during the sub-contractor’s interim payment application
• Preparation of cost report
Faithful+ Gould provided the cost consultant services to the main contractor Saudi Bin Laden Group)
Jeddah Air Port extension project
Duties:
• Assess the sub-contractor’s variation orders and prepare the recommendation
• Coordinating with site based QSs in order to gather the site progress for main contractor monthly payment
• Negotiating with client consultant representative during the interim payment submission
• Ensure the contractual obligations during the sub-contractor’s interim payment application
• Preparation of cost report
مايو 2010
إلى سبتمبر 2011
Project Quantity Surveyor
في GECO M&E
البلد :
الإمارات العربية المتحدة - الشارقة
o Tender production, procurement, estimating, BoQ/schedule of rates production.
o Feasibility studies.
o Quantity take off for plumbing, fire fighting, HVAC, BMS, fire alarm, electrical power, lighting, structured cabling and extra low voltage system from relevant drawings with the coordination of specification and other contract documents and BOQ preparation.
o Developing rate break down analysis.
o Identify the variations, evaluation of variations & negotiate with the consultant.
o Final account measurement, preparation & agreement with Client.
o Claim preparation for extension of time and prolongation cost.
o Contractual and technical writing.
o Commercial report/cash flow forecasts.
o Cost plans, measurement/ variation analysis.
o Production and control of sub-contractors accounts.
o Preparing interim and final payment statement.
o Claim management, notification/substantiation.
o Installation of electrical systems such as, power systems (MDB, MCC, SMDB, bus bar, cable tray, trunking and DB fixing), lighting systems, fire alarm and public address system.
o Checking and certifying the material requisitions from site Engineers.
o Provisional sums analyses and finalizes.
o Monitoring the progress of work and prepare report.
o Co-ordination with Consultants/Client & Local Authorities.
o Attending the progress and commercial meetings.
o Feasibility studies.
o Quantity take off for plumbing, fire fighting, HVAC, BMS, fire alarm, electrical power, lighting, structured cabling and extra low voltage system from relevant drawings with the coordination of specification and other contract documents and BOQ preparation.
o Developing rate break down analysis.
o Identify the variations, evaluation of variations & negotiate with the consultant.
o Final account measurement, preparation & agreement with Client.
o Claim preparation for extension of time and prolongation cost.
o Contractual and technical writing.
o Commercial report/cash flow forecasts.
o Cost plans, measurement/ variation analysis.
o Production and control of sub-contractors accounts.
o Preparing interim and final payment statement.
o Claim management, notification/substantiation.
o Installation of electrical systems such as, power systems (MDB, MCC, SMDB, bus bar, cable tray, trunking and DB fixing), lighting systems, fire alarm and public address system.
o Checking and certifying the material requisitions from site Engineers.
o Provisional sums analyses and finalizes.
o Monitoring the progress of work and prepare report.
o Co-ordination with Consultants/Client & Local Authorities.
o Attending the progress and commercial meetings.
يوليو 2008
إلى مايو 2010
Quantity Surveyor- MEP
في Faithful+Gould
البلد :
الإمارات العربية المتحدة - دبي
Projects
Since July, 2008, have been in post contract work for:
• 74 Stories, world’s 11th tallest, office tower at Jumaira Lake Towers, MEP value 200 million AED and total value of 900 million AED , and Infrastructural works.
• 39 Stories Au and Ag Office towers at Jumaira Lake Towers, Dubai, MEP value 80 million AED
Project Consultant Quantity Surveyor (MEP), responsible for following
o Evaluation & Certification of Contractor’s & Consultant’s` Payment applications,
o Assessing and evaluating the contractual entitlement of the Contractor for Claims and Variations,
o Joint measurements of electrical, mechanical, security, and structured cabling ( telecom services) system services,
o Review and evaluate all documents regards on claim of payment submitted by the contractor to ensure that in proper format base in contract agreement with specified company procedure,
o Prepare detailed construction bill of materials for pre-construction and post-construction project such as mechanical, electrical and plumbing (MEP) and also fire protection including documentation in support of financial cost Consolidate MEP Take-off and Delivered Quantity to Control and monitor the Delivered and Undelivered material,
o Review and when required, conducts joint inspection with the Consultant for the approval of variation order.
Since July, 2008, have been in post contract work for:
• 74 Stories, world’s 11th tallest, office tower at Jumaira Lake Towers, MEP value 200 million AED and total value of 900 million AED , and Infrastructural works.
• 39 Stories Au and Ag Office towers at Jumaira Lake Towers, Dubai, MEP value 80 million AED
Project Consultant Quantity Surveyor (MEP), responsible for following
o Evaluation & Certification of Contractor’s & Consultant’s` Payment applications,
o Assessing and evaluating the contractual entitlement of the Contractor for Claims and Variations,
o Joint measurements of electrical, mechanical, security, and structured cabling ( telecom services) system services,
o Review and evaluate all documents regards on claim of payment submitted by the contractor to ensure that in proper format base in contract agreement with specified company procedure,
o Prepare detailed construction bill of materials for pre-construction and post-construction project such as mechanical, electrical and plumbing (MEP) and also fire protection including documentation in support of financial cost Consolidate MEP Take-off and Delivered Quantity to Control and monitor the Delivered and Undelivered material,
o Review and when required, conducts joint inspection with the Consultant for the approval of variation order.
فبراير 2007
إلى يوليو 2008
Project Quantity Surveyor
في Thermo
البلد :
الإمارات العربية المتحدة - دبي
Projects
Since July, 2008, have been in post contract work for:
• 74 Stories, world’s 11th tallest, office tower at Jumaira Lake Towers, MEP value 200 million AED and total value of 900 million AED , and Infrastructural works.
• 39 Stories Au and Ag Office towers at Jumaira Lake Towers, Dubai, MEP value 80 million AED
Project Consultant Quantity Surveyor (MEP), responsible for following
o Evaluation & Certification of Contractor’s & Consultant’s` Payment applications,
o Assessing and evaluating the contractual entitlement of the Contractor for Claims and Variations,
o Joint measurements of electrical, mechanical, security, and structured cabling ( telecom services) system services,
o Review and evaluate all documents regards on claim of payment submitted by the contractor to ensure that in proper format base in contract agreement with specified company procedure,
o Prepare detailed construction bill of materials for pre-construction and post-construction project such as mechanical, electrical and plumbing (MEP) and also fire protection including documentation in support of financial cost Consolidate MEP Take-off and Delivered Quantity to Control and monitor the Delivered and Undelivered material,
o Review and when required, conducts joint inspection with the Consultant for the approval of variation order.
Since July, 2008, have been in post contract work for:
• 74 Stories, world’s 11th tallest, office tower at Jumaira Lake Towers, MEP value 200 million AED and total value of 900 million AED , and Infrastructural works.
• 39 Stories Au and Ag Office towers at Jumaira Lake Towers, Dubai, MEP value 80 million AED
Project Consultant Quantity Surveyor (MEP), responsible for following
o Evaluation & Certification of Contractor’s & Consultant’s` Payment applications,
o Assessing and evaluating the contractual entitlement of the Contractor for Claims and Variations,
o Joint measurements of electrical, mechanical, security, and structured cabling ( telecom services) system services,
o Review and evaluate all documents regards on claim of payment submitted by the contractor to ensure that in proper format base in contract agreement with specified company procedure,
o Prepare detailed construction bill of materials for pre-construction and post-construction project such as mechanical, electrical and plumbing (MEP) and also fire protection including documentation in support of financial cost Consolidate MEP Take-off and Delivered Quantity to Control and monitor the Delivered and Undelivered material,
o Review and when required, conducts joint inspection with the Consultant for the approval of variation order.
فبراير 2006
إلى يناير 2007
Quantity Surveyor
في BK Gulf
البلد :
الإمارات العربية المتحدة - دبي
Projects
Three month pre contract and 8 month post contract woks.
• Retail village & Water parks at Atlantis, Palm Jumairah in Dubai UAE on the area of 40 acres, with the MEP Value of 700 Million AED.
Quantity Surveyor, responsible for following,
o Quantity Surveyor (MEP) responsible for following:
o Feasibility studies and quantity take off,
o Identify the variations & negotiate with the consultant,
o Evaluation of variations,
o Monthly interim valuation,
o Checking and certifying the material requisitions from site Engineers,
o Price estimation and sub contractor work finalization
Three month pre contract and 8 month post contract woks.
• Retail village & Water parks at Atlantis, Palm Jumairah in Dubai UAE on the area of 40 acres, with the MEP Value of 700 Million AED.
Quantity Surveyor, responsible for following,
o Quantity Surveyor (MEP) responsible for following:
o Feasibility studies and quantity take off,
o Identify the variations & negotiate with the consultant,
o Evaluation of variations,
o Monthly interim valuation,
o Checking and certifying the material requisitions from site Engineers,
o Price estimation and sub contractor work finalization
مايو 2001
إلى يناير 2006
Quantity Surveyor cum Electrical engineer
في Civil Tech
البلد :
سريلانكا
Projects
Had been in pre and post contract services notably for: .
• Construction of 10 stories Hathisan Telecom & Administration building in Colombo on the Area of 2000 square meters,
• Construction of 6 stories khaleel Shopping complex building in Colombo,
• Small scale housing schemes in Srilanka.
Quantity Surveyor cum Electrical Engineer, responsible for following
o Feasibility studies and quantity take off,
o Evaluation of variations & Identify the variations & negotiate with the consultant,
o Installation of electrical systems such as, Power systems (MDB, MCC, SMDB, Bus bar, Cable tray, Trunking and DB fixing), Lighting systems, Fire Alarm and Public Address System,
o Checking and certifying the material requisitions from site Engineers,
o Monitoring the progress of work and prepare report,
o Co-ordination with Consultants/Client & Local Authorities,
o Planning and co-ordination with other trades and suppliers,
o Preparing shop drawings for fire alarms .power, lighting and telecommunication,
o Designing lightning protection systems.
Had been in pre and post contract services notably for: .
• Construction of 10 stories Hathisan Telecom & Administration building in Colombo on the Area of 2000 square meters,
• Construction of 6 stories khaleel Shopping complex building in Colombo,
• Small scale housing schemes in Srilanka.
Quantity Surveyor cum Electrical Engineer, responsible for following
o Feasibility studies and quantity take off,
o Evaluation of variations & Identify the variations & negotiate with the consultant,
o Installation of electrical systems such as, Power systems (MDB, MCC, SMDB, Bus bar, Cable tray, Trunking and DB fixing), Lighting systems, Fire Alarm and Public Address System,
o Checking and certifying the material requisitions from site Engineers,
o Monitoring the progress of work and prepare report,
o Co-ordination with Consultants/Client & Local Authorities,
o Planning and co-ordination with other trades and suppliers,
o Preparing shop drawings for fire alarms .power, lighting and telecommunication,
o Designing lightning protection systems.
انشر على فيسبوك
انشر على تويتر
مشاركة عبر البريد الإلكتروني