Technical Manger in PVC Pipes Plant
الخليجية لانظمة التعبئة والتغليف
Total years of experience :14 years, 8 Months
Installation for Extrusion PVC and CPVC pipe lines from (1/2 inch to 8 inch) manufacturing by BATTENFELD, Installation PENTA Silos and PLASMEC mixer systems complete installation for the factory, in addition to the accessories unites chillers, pumps, piping system and air compressors.
• Mold maintenance for PVC, CPVC and brass fitting molds.
• Tool Room coordination for mold correction.
• PVC formulations, testing the additives effect on the Extrusion lines.
• Technical support for sales for solving related customer problems.
• QC Testing for PVC pipes.
• Operation for PVC Extrusion lines and parameters setting, I trained at the hands of German processing Engineers.
• Maintenance for the extrusion lines and injection machines.
• Schedule for the preventive maintenance for the equipments.
• Yearly planning of machine maintenance and follow the schedule.
Faculty of Engineering, Alexandria University, (2003-2008). Major: Mechanical Engineering Department. • Graduation project: Project Description: This project (Brake Systems in Cars) The project was a study of types of brakes in vehicles (ABS system, Disc Brake System and Drum Brake System).