FARESS TALA, Petroleum Engineers ' i want any opportunity'

FARESS TALA

Petroleum Engineers ' i want any opportunity'

sonatrach

Location
Algeria
Education
Master's degree, service "prodution & drilling"
Experience
4 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :4 years, 11 Months

Petroleum Engineers ' i want any opportunity' at sonatrach
  • dz,4,0
  • September 2015 to September 2016

1/Management company oil & gas offshore & onshore
2/h2s awareness course ' basic and advanced'
3/ Well controil awareness course

Operator at sonatrach with halliburtoin
  • Algeria
  • July 2013 to May 2015

•Work as directed by my immediate superior
•Experience on spotting the above on onshore On Spotting The Above On Onshore locations.
•Familiar with all testing safety and regulations procedures, such as gas detection systems, fire fighting & control sustems Etc
•Run the well testing Program Of Well Testing Calculation
•Hand Calculating Gas, Oil And Water Rates
•Can calibrate all measuring equipment such (Ranarex gravimeter- Senior deniels orifice meter- Pressure controllers- Transfer Pumps- Level controllers - Pressure and Level actuators)

mud logging operator at SONATRACH with schlumberge
  • Algeria
  • May 2012 to April 2013

•Collecting drill cuttings.
•Describing the cuttings (type of minerals present).
• Maintaining a record of drilling parameters (Master Log).
Operating and maintaining a real-time computer-based data acquisition system, the advanced logging system (ALS3B, Anax 500, Geolog), which records all aspects of rig activity
•Assisting the wellsite geologist during coring operations.

assistant spv 'mud logging date' at sonatrach& nabors
  • Algeria
  • June 2011 to June 2012

•Processing and interpretation of different types of borehole geophysics data particularly Vertical.
•Profile (VSP) which includes Check shots, Rig source, Offset VSP and related products such as sonic calibration and synthetic seismogram
•supporting and coaching team, and doing a technical review, also I am doing a follow up of a monthly BHS Activity in Algeria.
•Prediction of fracture orientation using Shear VSP data processing.
•Shear profile computation forme VSP data and Rock Types Analysis

Education

Master's degree, service "prodution & drilling"
  • at university algerian API
  • June 2015

I’m a petroleum engineer who graduated from Algerian university, faculty of engineering –petroleum department with very well (GPA 3.85)

Master's degree, drilling
  • at university
  • June 2013

Summary my dessertation All alternatives for drilling conventionally should be exhausted before committing to floating mud cap drilling, as it is a very high risk technique. The well is on the verge of being uncontrolled at any time during the drilling operation. When mud cap drilling is anticipated, specific well control procedures should be in place prior to penetrating the loss zone. It should be matched with the characteristics of the zone. Successful use of a floating mud cap can result in the penetration of the loss zone without setting an extra string of casing

Specialties & Skills

Production
English
Logging
senior loggin
senioe mudlogging
Drilling
logging
logging
engineer petroleum
DUEA english
DUEA production
floorman
senior well testing
derrickman
roustabout

Languages

English
Expert

Memberships

ANADARCO
  • SUPERVISURE
  • March 2014

Training and Certifications

world learning (Certificate)
Date Attended:
March 2012
Valid Until:
May 2013

Hobbies

  • career petroleum drilling
    Mud logging Engineering surveys Logging tools: Induction and later log (HDIL-DLL-RTEX) Coring& DST Well testing & coiled tubing onshore site investigation Liner cementing guidelines.