My Projects:-
*King Abdul Aziz Int Airport Jeddah( In process)
*KFD
* CUC Makkah
* Riyadh power plant 10th simple to combined cycle
Major Responsibilities:-
Monitoring and administering the QA/QC Plan or Programme and ensuring incorporated materials on projects are in compliance with the plans and specifications.
Assuring that the work is performed as required by the contract and meets or exceeds the required qualities.
Maintain and update quality documents for offices/sites.
Inspection & testing of all LV GE (General electric) power distribution system.
Inspection & testing of 480V, 4.16KV, 6.6 kV Switchgears, MCC, ATS, LDB panel, and VFD electrical panels.
Testing of GE breakers & ground fault relays & GFR sensor by primary injections
Pre-energizing and preparation for energizing.
Inspection and Monitor the grounding, Lightning and NGR installations
Create forms and formats for offices/sites.
Maintain organization chart & Test, commission documents.
File and inspect activities on sites.
My Projects:-
Rabigh Power Plant13.8kv/ 4.16kv Medium Voltage rabigh Saudi Arabia.
380kv/110kv GIS High Voltage (In Progress) Al-lith
Service Station 13.8kv Masjid-e-Haram Mecca.
Bani-malik Sub Station 13.8kv Jeddah.
13.8kv Station S/S ET-2 Jeddah.
13.8kv Service station S/S Jummom.
13.8kv Service Station S/S Eskan.
Major Responsibilities:-
Testing of Over Current relays ABB, MFAC high impedance relay & auxiliary relays.
Scheme and function testing for Protection & Control Panels.
Verifying overall Interlocking & GIS SF6 Du-Point Test.
Testing and Calibration of Energy Meters, SF6 Gas Leakage Test.
Testing Current & Voltage Transformer by CT analyzer.
Testing MCCB, Circuit Breaker, MCB, Bus Bar & Earth Switch Contact Resistance.
Transducer & Insulation test, Cable High Voltage.
Pre-check of all panels Siemens, ABB, Hyundai and Schneider Electric.
CT & VT loop Switch Gear.
Working on all testing devices such as CT Analyzer Omicron, Severker, Megger, MOM
Freja Primary Injection, Fluke Multi Meter, Clamp on Digital Meter, Micro meter. meter
Tester Megger 5kv, Relay set sverker, Relay set freja 300, CPC-100 Omicron.
Market Awareness:-
Review of Documents, Specifications, Delivery schedules and important milestones
Preparation of Kick-off meeting & Snag list
Attend and comment on Preliminary and Final Handing Over
Coordination with Engineering and making Non Conformance Report (NCR) on material ordering/receiving.
Working on all testing devices such as CT Analyzer Omicron, Severker, Megger, MOM
Coordination / correspondence with customers and client
o Build strategies for maximizing operation.
o Focus on 24/7 working to achieve goal.
Major responsibilities:
* Handles ALCATEL E-10B telephone calls
* Understanding the E-10B, MSAN (HUAWEI) switching system
* Working on BTS 3606E (indoor), dps3900 (outdoor)
* Understanding the phenomena of wireless networking
* Installing cards CMTR, CMPA, CCPM, CECM, BCIM, PSU
* Controlling the alarms in BTS
* Making Long Distance International calls by ITMC
* Understanding the NMS (networking management system)
* Working on E-300software
* Understanding the different types of multiplexing
Market awareness: To establish and maintain contacts with key customers, competitors, local vendors to track market dynamics & collect competitor activities.
FINAL YEAR PROJECT Title: ERP Implementation: Critical Success factors
Final Year Project :- UN MANED SEA SURFACE VECHLE (USV) Ship contains wireless remotely operated; Cameras, GPS, Ultra Sonics & IR Sensor, self-determination, convenient control perform ISR missions and combat applications & Object detection using infra-red/ultra sonic sensors. Auto path tracking by providing latitude and longitude. Design and fabrication of USV (platform) with on board tonnage of 50 kg approx. Route guidance through wireless communication. Video surveillance feature enables us to have continuous video feedback of surrounding of USSV at the base station Third Year Project • Car Parking System using AVR Microcontroller It is an embedded control application for Building Automation. • Controller Based Traffic Control System using 89C51using KEIL software for programming
Intermediate Education (HSC Pre-Engineering) AISHA Baawani College Karachi, Pakistan April 2008