Muhammed Farhan Sharif, Testing & Commissioning ,Quality Control Engineer

Muhammed Farhan Sharif

Testing & Commissioning ,Quality Control Engineer

GEDAC ELECTRIC

Location
Saudi Arabia - Jeddah
Education
Master's degree, PROJECT MANAGEMENT
Experience
5 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :5 years, 2 Months

Testing & Commissioning ,Quality Control Engineer at GEDAC ELECTRIC
  • Saudi Arabia - Jeddah
  • March 2015 to October 2017

My Projects:-
*King Abdul Aziz Int Airport Jeddah( In process)
*KFD
* CUC Makkah
* Riyadh power plant 10th simple to combined cycle

Major Responsibilities:-

 Monitoring and administering the QA/QC Plan or Programme and ensuring incorporated materials on projects are in compliance with the plans and specifications.
 Assuring that the work is performed as required by the contract and meets or exceeds the required qualities.
 Maintain and update quality documents for offices/sites.
 Inspection & testing of all LV GE (General electric) power distribution system.
 Inspection & testing of 480V, 4.16KV, 6.6 kV Switchgears, MCC, ATS, LDB panel, and VFD electrical panels.
 Testing of GE breakers & ground fault relays & GFR sensor by primary injections
 Pre-energizing and preparation for energizing.
 Inspection and Monitor the grounding, Lightning and NGR installations
 Create forms and formats for offices/sites.
 Maintain organization chart & Test, commission documents.
 File and inspect activities on sites.

Testing & Commissioning engineer at QUALITY MAKERS
  • Saudi Arabia - Jeddah
  • November 2012 to February 2015

My Projects:-
 Rabigh Power Plant13.8kv/ 4.16kv Medium Voltage rabigh Saudi Arabia.
 380kv/110kv GIS High Voltage (In Progress) Al-lith
 Service Station 13.8kv Masjid-e-Haram Mecca.
 Bani-malik Sub Station 13.8kv Jeddah.
 13.8kv Station S/S ET-2 Jeddah.
 13.8kv Service station S/S Jummom.
 13.8kv Service Station S/S Eskan.

Major Responsibilities:-

Testing of Over Current relays ABB, MFAC high impedance relay & auxiliary relays.
Scheme and function testing for Protection & Control Panels.
Verifying overall Interlocking & GIS SF6 Du-Point Test.
Testing and Calibration of Energy Meters, SF6 Gas Leakage Test.
 Testing Current & Voltage Transformer by CT analyzer.
Testing MCCB, Circuit Breaker, MCB, Bus Bar & Earth Switch Contact Resistance.
Transducer & Insulation test, Cable High Voltage.
Pre-check of all panels Siemens, ABB, Hyundai and Schneider Electric.
CT & VT loop Switch Gear.
Working on all testing devices such as CT Analyzer Omicron, Severker, Megger, MOM
Freja Primary Injection, Fluke Multi Meter, Clamp on Digital Meter, Micro meter. meter
Tester Megger 5kv, Relay set sverker, Relay set freja 300, CPC-100 Omicron.



Market Awareness:-

Review of Documents, Specifications, Delivery schedules and important milestones
Preparation of Kick-off meeting & Snag list
Attend and comment on Preliminary and Final Handing Over
Coordination with Engineering and making Non Conformance Report (NCR) on material ordering/receiving.
Working on all testing devices such as CT Analyzer Omicron, Severker, Megger, MOM
Coordination / correspondence with customers and client

Internee at pakistan tele communicaion company ltd
  • Pakistan - Karachi
  • July 2012 to August 2012

o Build strategies for maximizing operation.
o Focus on 24/7 working to achieve goal.

Major responsibilities:
* Handles ALCATEL E-10B telephone calls
* Understanding the E-10B, MSAN (HUAWEI) switching system
* Working on BTS 3606E (indoor), dps3900 (outdoor)
* Understanding the phenomena of wireless networking
* Installing cards CMTR, CMPA, CCPM, CECM, BCIM, PSU
* Controlling the alarms in BTS
* Making Long Distance International calls by ITMC
* Understanding the NMS (networking management system)
* Working on E-300software
* Understanding the different types of multiplexing

Market awareness: To establish and maintain contacts with key customers, competitors, local vendors to track market dynamics & collect competitor activities.

Education

Master's degree, PROJECT MANAGEMENT
  • at SIKKIM MANIPAL UNIVERSITY
  • August 2015

FINAL YEAR PROJECT Title: ERP Implementation: Critical Success factors

Bachelor's degree, Electronics
  • at INDUS UNIVERSITY
  • June 2012

Final Year Project :- UN MANED SEA SURFACE VECHLE (USV)  Ship contains wireless remotely operated; Cameras, GPS, Ultra Sonics & IR Sensor, self-determination, convenient control perform ISR missions and combat applications & Object detection using infra-red/ultra sonic sensors. Auto path tracking by providing latitude and longitude.  Design and fabrication of USV (platform) with on board tonnage of 50 kg approx. Route guidance through wireless communication.  Video surveillance feature enables us to have continuous video feedback of surrounding of USSV at the base station Third Year Project • Car Parking System using AVR Microcontroller It is an embedded control application for Building Automation. • Controller Based Traffic Control System using 89C51using KEIL software for programming

High school or equivalent, Engineering
  • at AISHA Baawani College
  • July 2007

Intermediate Education (HSC Pre-Engineering) AISHA Baawani College Karachi, Pakistan April 2008

Specialties & Skills

Comissioning
Project Management
Testing
Education
CABLING
CLIENTS
ENGINEER
FORECASTING
INTERNET MARKETING
MARKETING

Languages

Hindi
Beginner
Urdu
Beginner
Arabic
Beginner
English
Beginner

Training and Certifications

workshop (Certificate)
Date Attended:
April 2010
Valid Until:
April 2010