Technical Project Manager
Jabal Omar Development Copmpany
مجموع سنوات الخبرة :20 years, 10 أشهر
Follow up and coordinate with all parties involved in the construction site ( Project Management Co., Consultant and Main Contractor )
Transfer and implement the owner's requirements to the project in an engineering way.
Making sure that all Government requirements are satisfied (Civil Defence, Police, Presidency of Two Holy Mosques, ..... etc )
Establishing agreements and obtaining approvals
Review the project plans and specifications and comment on the building design, scheduling, possible
Cost savings measures and potential construction problems.
Solving all conflicts found in drawings or in site.
Monitoring the project schedule
Managed planning & control of all supply chain activities related to maintenance of production equipment of power generation & water desalination plants.
Dealt with supply chain and procurement plants for facilities including conventional, combined cycle, hydroelectric and solar power plants.
Developed & implemented effective strategies and plans ensuring achievement of all operational goals.
Reported to the Group CEO and managed all aspects of operations & maintenance services for a multi-unit residential community.
Developed & executed strategies and plans to achieve targets for operational efficiency, quality of service, tenant satisfaction and profitability.
Formulated & implemented marketing strategies including promotions, advertisements & pricing and managed leasing program to achieve optimum occupancy level, income & value to community.
Managed all staffing related matters including selection, hiring, training, supervision & rewarding of employees.
Inspected & evaluated works executed by contracts for maintenance of airport facilities including preventive & corrective maintenance (PM/CM) and rush projects
Worked as a member of the engineering team for the project for extension of 2 airport terminals including renewal of airport load centers. Participated in installation & commissioning of chiller plants along with their cooling water towers and potable water & chilled water pumping stations.
Participated in testing & commissioning of air conditioning system, fire rescue system, load testing and pump rooms of the main GACA airways engineering building.
Monitored refurbishing of basic airport infrastructure complying with approved civil aviation standards.
Engaged at the Makkah Clock Tower project working on supply, installation & commissioning of mechanical equipment for 5 towers ranging from 50 t0 80 floors.
Supervised mechanical jobs related to HVAC ducts, chilled water plumbing and firefighting system (as per NFPA standards) adhering to codes & drawings approved by the consultant.
Followed up for approvals of completed jobs by the consultants and tested & connected systems post approval.
Planned & executed all jobs in the assigned area ensuring optimum utilization of materials and maintenance of the area.
هندسة ميكانيكية من قسم الهندسة والعمارة الاسلامية من جامعة ام القرى بمكة المكرمة