Muhammad Farukh Manzoor, Mechanical Project Engineer

Muhammad Farukh Manzoor

Mechanical Project Engineer

MIA Arabia

Lieu
Arabie Saoudite - AlJubail
Éducation
Baccalauréat, Metallurgical & Materials Engineering
Expérience
11 years, 6 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :11 years, 6 Mois

Mechanical Project Engineer à MIA Arabia
  • Arabie Saoudite - AlJubail
  • Je travaille ici depuis juin 2020

 Scope consists of demolition work of boiler, stack, piping, civil foundations, electrical and instrumentation works and tie-ins of piping.

Project Engineer Mechanical à MIA Arabia
  • Arabie Saoudite - AlHufuf
  • février 2020 à juin 2020

Project: RTR Piping erection and civil works of foundations green and brown field at Hawiyah Gas Plant Expansion Project, KSA
Client: SNAMPROGETTI KSA, Ltd.

 Scope consists of civil foundations, manholes, electrical pull pits fabrication, RTR piping fabrication, erection and hydrotest of RTR lines for systems CSW, Fire Water, Drinking water, OWS line under the direct manpower supply to SNAMPROGETTI
 189 Tie-in Packages, more than 3500 joints and 540 hydrotest packages
 Studying tender documents and giving inputs to estimation department for preparing target budget.
 Site surveys and preparing project execution plan, manpower and resource planning, method statements

Mechanical Project Engineer à MIA Arabia
  • Arabie Saoudite - Riyad
  • mai 2019 à janvier 2020

Project: BACS Riyadh Metro Project (Line-1 and Line-2), KSA
Client: Siemens Arabia Ltd.

 Scope consists of preparing shop drawings, procurement, and installation of REL Emergency Diesel generator exhaust line, cooling water lines, fuel lines and vent lines
 Studying tender documents and preparing BOQ, giving inputs to estimation department for preparing target budget.
 Leading the project from Initiation to shop drawing preparation, procurement, and Construction phase.
 Site surveys and preparing project execution plan, manpower and resource planning, method statement and Diesel generator shop drawings packages
 Focal person for project engineering, planning, and preparing project weekly reports, progress monitoring in real time, resources monitoring etc.
 Monitoring and preparing claim proposals for variation in scope of work, materials, delays, and extension of time.

Project Engineer (Aramco Approved) à Evergreen Contracting Est. Riyadh, KSA
  • Arabie Saoudite - AlHufuf
  • août 2017 à août 2018

Project: BI-10-01256-Feul Gas Pipeline at Hawiyah Gas Plant, KSA
Client: SAGPD, COGEN/Renewable Energy Projects Unit, Saudi Aramco

 Leading the project from Initiation to Pre-Commissioning phase.
 Successful completion of project materials and services procurement, piping fabrication, painting, installation, cleaning, hydro testing and layup of 350 meter 14" on-plot piping and 1.5 Km underground 14" pipeline.
 Liaison with Inspection coverage departments; SAGFPIU (Southern area gas facilities project inspection unit, Udhaliyah, Saudi Arabia), PTSD (Pipeline technical services department).
 Civil/Structural works includes pipeline trench, anchor blocks and pipe supports foundations and erected structures.
 Procurement works includes; Preparation of MR(Aramco material requisitions) for valves, piping, FBE coating, anchor bolts, reinforcement bars, structure, pipe fittings and 14" API 600 valves and subsequent IAPs (Inspection Assignment package),
 Hot-tap, Tie-ins and hydro test packages and getting approval from SAGFPIU and PTSD.
 Reviewing and assisting in preparation of site material requests, project technical submittals and related correspondence logs, RFIs, weekly progress reports, weekly progress and quality MOM.
 56" split tee installation and vertical hot tapping activity package preparation for 56" HUG-1, Seg-2 pipeline to connect it with 14" pipeline
 Installation and testing of ICCP(Impressed current Cathodic protection) and Permanent SACP(Sacrificial anode CP) system.

Project Engineer à Evergreen Contracting Est. Riyadh, KSA
  • Arabie Saoudite - AlHufuf
  • septembre 2015 à juin 2017

Project: BI-10-00879-BTX Filtration systems in Hawiyah, NGL Plant, KSA
Client: SAGPD, Gas and Abqaiq Plants Projects Unit, Saudi Aramco

 Leading the project from Initiation to Pre-Commissioning, Commissioning and successful completion.
 Major works includes: Demolition of asphalt, excavation, laying up filter mat foundations, backfilling and compaction, asphalt roads and concrete paving, erection of ASME pressure vessels (14 meter height, 3.5 meter OD) and structural platforms, supports and process piping installation, conduit works of lights and instruments, instrumentation and KV and ZV installation.
 Working with SAPMT for project planning, site development and purchase specifications of materials
 Responsible for overseeing all project documentation including method statements, technical queries, JSA’s, As-built drawings and material approvals.
 Liaison with clients and subcontractors on regular basis to ensure that project is carried out in accordance with Aramco specifications with due respect to safety, operability and maintainability.
 Tracking of all project activities and dealing with day to day contract and site issues of construction.
 Checking all project drawings and vendor documents for quantity surveying for piping, structure, civil, equipment, painting, scaffolding, insulation, conduits and tubing works.

Project Engineer à Evergreen Contracting Est. Riyadh, KSA
  • Arabie Saoudite - AlHufuf
  • janvier 2013 à juillet 2015

Projects: 1) BI-10-01202-Blowers upgrading project, Hawiyah Gas Plant, KSA
2) Installation of Turbocharger technology-HGP, KSA
Client: Hawiyah Gas Plant, Saudi Aramco

 Leading the project from Initiation to Pre-Commissioning, MCC, Commissioning and demobilization.
 DMW air blower’s installation in three Sulfur recovery trains, two in each and associated works of piping, civil, structure, electrical wiring, instrumentation and DCS/ESD.
 Installation of ERI technology generators and turbines in GT Area.
 Presenting the weekly project progress to Aramco PSU.
 Defining the procedures and plan of modification items relating to blower foundation, structural and piping systems
 Project time estimation, scheduling, execution and monitoring
 Preparing bill of materials for piping, civil and structural materials.

Mechanical Engineer à Evergreen Contracting Est. Riyadh, KSA
  • Arabie Saoudite - Province de l'Est
  • octobre 2012 à janvier 2013

Project: CHF project of ARAMCO, Manifa, KSA
Client: Tecnicas Reunidas

 Completed the piping and Ducts work of the area MACC-01 (Main air cooler condenser) in the COGEN area.
 Completed enormous test packages and reinstatement work of the Piping systems.

Mechanical Supervisor à Global Sources for General Contracting, Jubail, KSA
  • Arabie Saoudite - Province de l'Est
  • mai 2012 à octobre 2012

Project: CHF project of ARAMCO, Manifa, KSA
Client: Saipem

 Supervising the pre-fabrication and installation of piping spool assemblies from material through to final review of test packs along with structural supports works.

Mechanical Supervisor à Kanooz Industrial Services, Jubail, KSA
  • Arabie Saoudite - AlJubail
  • avril 2012 à mai 2012

Project: Annual Turnaround of Petrokemya, Jubail, KSA
Client: SABIC

 Sand blasting and coating activities of pre-fabricated spools in the workshop.
 Dealing with the Maintenance activities of the piping systems.
 Dismantling of the structures for miscellaneous maintenance activities.

Assistant Mechanical Engineer à Arab Iron and Steel Company, Dammam, KSA
  • Arabie Saoudite - Dammam
  • janvier 2012 à avril 2012

Project: Construction Phase of Arab Steel, Dammam, KSA
Client: Al-Tuwairqi Holding

 Dealing with Electric Arc Furnace piping drawings, Quantity surveying, MTO extraction, fabrication and erection.
 Construction of isometric drawings from plan drawings for site.

Éducation

Baccalauréat, Metallurgical & Materials Engineering
  • à University of Engineering & Technology, Lahore
  • octobre 2011

Bachelor of Engineering in Metallurgical & Materials Engineering

Etudes secondaires ou équivalent, Engineering
  • à Govt. Civil Lines College
  • juin 2007

Intermediate in Pre-Engineering

Etudes secondaires ou équivalent, Metric (Science)
  • à BISE
  • mai 2005

Metriculation in Science

Specialties & Skills

Job Planning
English speaking
Project Management
Team Leadership
Construction Project Management
Project Management
International Standards
Auto Cad
Microsoft Project 2007
MS Office
Construction Project Management

Langues

Anglais
Expert
Urdu
Expert
Arabe
Débutant

Adhésions

Saudi Engineering council
  • Materials Engineer
  • July 2016
Pakistan Engineering council
  • Metallurgical and Materials Engineer
  • November 2011

Formation et Diplômes

Saudi Aramco Approval for Project Engineer (Certificat)
Date de la formation:
May 2017
Primavera P6 (Certificat)
Date de la formation:
June 2011
Valide jusqu'à:
August 2011
Turbocharger Technology Hawiya Gas plant, Appreciation certificate (Certificat)
Date de la formation:
May 2015
Valide jusqu'à:
January 9999
Blowers Upgrading project Appreciation certificate (Certificat)
Date de la formation:
May 2015
Valide jusqu'à:
January 9999