Mechanical Engineer
Euro Mechanical
Total years of experience :9 years, 7 Months
Responsible for the execution of various contract releases from the receipt of engineering package/PMR till Project close out. We undertake EPC projects in Oil & Gas field (both Green & brown field)
Achievements:
• Better understanding of welding, welding standards ( ASME - ASME Boiler & Pressure Vessel code & AWS), welding & fabrication methodologies and related documentations
• Deep dived into ASME 31.3 and other design and material standards of pipe, valves & fittings
• Well familiar with ADNOC specification and procedures
Major Projects Involved: ADNOC Offshore Projects
• Various Blanket Contract for Minor Works
Revenue: 30M USD / Year
Project brief: Engineering, Procurement, Fabrication and Site Installation activities for Various Shut down, Inspection Recommendations, PMR, Engineering Package & New Project
• Short Term Blanket Contracts for Well Hook up & Associated works
Contract amount: 12M USD
Project brief: Project brief: Engineering, Procurement, Fabrication and Site Installation activities for Well Hook up & associated works
• Call of Contract for the modification of well flow lines to put wells on production
Contract amount: 50M USD
Project brief: Supply of Hydraulic/Electrical safety shutdown modules and other required accessories including prefabricated piping flow lines and install them
• Modification of Oily Water Drain Ring of the COS Tank 443-S-001, 002 & 005 at Zirku
Contract amount: 18M USD
Project brief: To replace the existing two drain rings of crude oil storage tank with single ring along the modification of bund drain lines, outside the bund, to introduce some valves
• P20054 EPC for Zirku Power Upgrade
Client: Zakum Development Company (ZADCO)
Contract amount: 40M AED
Contractor: ABB SpA Automation Division / Granite LLC
Project brief: Electromechanical Works to install two additional gas turbine generators (Capacity 20.5 MW) and associated equipment
Responsible for Engineering deliverables and vendor & subcontractor management. We construct Utility pipelines and industrial utility plants
Achievements:
Sound knowledge about design principle of Utility pipelines, Pumping stations, District cooling and Waste water treatment plants and related equipment- Static & rotating equipment
Projects Involved:
• Al Raha Beach Development, Abudhabi
Client: Aldar properties
Project Management Consultant: Turner / Parsons, Hyder consulting & Mott MacDonald
End User: Abu Dhabi Municipality (ADM) & Abu Dhabi Sewerage Services Company (ADSSC)
Contract amount: 64 Million AED
Project Brief: We constructed 3 Nos of sewerage and an irrigation pumping station.
• Al Shams District Cooling Plant Expansion; Abudhabi
Client: S & T Cool District Cooling Company.
Consultants: TABREED
Contract amount: 24 Million AED
Project Brief: We expanded the plant from 10000 Ton to 20000 Ton capacity by adding 4 numbers of 2500 Ton centrifugal chillers, 2 Nos of cooling towers, 2 Nos Condenser water pumps, a chilled water pumps, a makeup water pump, transformers, switch gears and related MEP & Civil works
• Dragon Mart Expansion Project; Dubai
Client: Nakheel
Consultants: Dar Al Handasah
Contract amount: 86 Million AED
Project brief: We constructed a main pumping station with irrigation, firefighting & portable pumps and water tanks. Also, we installed underground dry and wet utilities.
• Transmission Pipe Line From Thouban Pumping Station To Masafi; Fujairah
Client: Federal Water and Electricity Authority (FEWA)
Consultants: Federal Water and Electricity Authority (FEWA)
Contract amount: 27 Million AED
Project brief: We installed 16 KM DI pipe (DN 600) with 8 Nos isolation valve, 21 Nos air released valve (DN 150), 12 Nos of washout chamber and 3 Nos of bypass with existing DI pipe (DN 300)
• Al Madina Al Shamaliya Sewerage Treatment Plant, Bahrain
Client: Ministry of Housing, Kingdom of Bahrain
Design Consultants: MWH Khonji
Main contractor: Belhasa projects llc - Wabag JV
Contract amount: 300 Million AED (EPCM contract)
Project brief: Design, Construction, Operation and Maintenance of 40 MLD Sewerage treatment plant (Project No SP/04/2013 - AMAS STP)
Job Summary:
It was a project based job, we constructed T3 container terminal for DP world. Where my part was to supervise and control mechanical subcontractor (Shinryo Corporation; Japan) and coordinate with contractor’s designer (AECOM) & employer representative (Royal haskoning ).
Project : T3-Q10 Container Terminal (Jebel Ali), Marine/ Civil Package; Dubai
Client : Dp World
Main contractor : Toa - Soletanche Bachy JV
Budget : 3.2 billon AED. (EPC Contract)
Employer representative: Royal haskoning
Contractor’s Designer : AECOM
Project summary:
New container terminal is having 4 million TEU capacity, 1, 860 metres of quayside and 70 hectares of yard with 19 highly sophisticated automated 17 meter draft quay cranes and 50 automated rail mounted gantry (RMG) yard cranes. T3, which is set to be the world's largest semi-automated facility, will be at least 30% more carbon efficient than a conventional terminal operation
Scope of MEP:
Diesel power station - 4 x 2.5 MW
Portable pumping station - 200 GPM @ 15M
Firefighting pumping station - 1500 GPM @ 12 Bar
Substation electricity - 11 KV / 400 V
Distribution network - portable water, firefighting, storm water, sewerage, MV, LV and Data
My job mainly focused on design of firefighting systems for building, infrastructure and industrial projects, which includes design, hydraulic calculation, sizing & selection of material and guide to prepare the shop drawing and submission.
Achievement:
• Core understanding of fire chemistry and extinguishing science
• Well versed in design & estimation of fire protection systems
• Better knowledge in materials, production processes and certification of engine, pumps, pipes, valves, fittings and other equipments
• Familiar with UAE fire code, NFPA and other intl. Standards.