Control room operator في Dubai electricity and water authority
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ أكتوبر 2011

Control room operations of Siemens v94.3a gas turbine, alstom steam turbine, DOOSAN HRSG, and plant utilities like Natural gas receiving, conditioning and distributions, DM WATER produtiin and distribution, DFO tanks farm operations, ccw, acw, air compressor, public Water distribution and etc.

Field Operator في Samsung C & T
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ يوليو 2010

Operations of
HRSG, Duct burner system, Diverter damper system
Condensate system, Feed water system, Condensate pre-heating system, HP steam system, LP steam system, IP steam system
BOP systems i.e. closed cooling water system, Compressed air system, Condenser side and Water box side vacuum creation system, Rubber ball cleaning system, Demineralised water production system, Gas turbine Fuel oil system, Sump drains, and Fire water system

Field Operator في Korea Plant services and Engineering
  • باكستان
  • يناير 2010 إلى يوليو 2010

Operation activities of gas turbine GE MS9001E with GE experts.
Having fully hand on experience of operation of gas turbine From HMI and experience of all turbine operating sequence and perform activities online and offline compressor washing, water injection and intake filter cleaning system
Operation of HRSG at start up shut down and transients.
Operation of BOP like closed cycled cooling water system, Aux. cooling water system, Main cooling water system, cooling Towers, Air Compressor etc

Assistant Plant Operator في CHASHMA Nuclear Power Project (CHASNUPP)
  • باكستان
  • نوفمبر 2006 إلى يناير 2010

Operation of turbine and its auxiliaries systems such as Condensate system, Feed water system, Turbine Lube Oil system, Electro Hydraulic control oil system, Circulating cooling water system, Closed Loop and Open loop cooling water system, Generator Rotor and Stator Cooling Water system, Turbine Glands sealing system, Extractions steam, Normal and Emergency Drain system etc.
Operation as Utility Operator: Compressed air system, Hydrogen distribution system, Nitrogen Compression and distribution system, Hot water production and distribution system and demineralised water production system

الخلفية التعليمية

بكالوريوس, Computer Science
  • في Virtual University of Pakistan
  • سبتمبر 2009

CGPA = 3.23

دبلوم, Power Plant Engineering
  • في KANUPP institue of Nuclear Power Engineering
  • نوفمبر 2006

Marks Obtained = 79% Major Subjects: Turbine Generator and auxiliaries, Heat and Thermodynamics, Fluid Mechanics, Mechanical and Electrical Equipments, Plant Operating Systems, Instruments, industrial Safety etc

دبلوم, Chemical
  • في Punjab Board of Technical Education
  • يونيو 2005
الثانوية العامة أو ما يعادلها, Science
  • في Board of intermediate and secondary education
  • يونيو 2002

Specialties & Skills

اللغات

الانجليزية
متوسط