Feras Salim Naser Shadid, Founder and CEO

Feras Salim Naser Shadid

Founder and CEO

Emergence FZE

Lieu
Jordanie - Amman
Éducation
Master, Railway Systems Engineering
Expérience
6 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :6 years, 4 Mois

Founder and CEO à Emergence FZE
  • Émirats Arabes Unis - Dubaï
  • février 2014 à décembre 2016

As selling Building Materials was not that thing that I wanted to pursue in my life, I decided to pursue my passion and dream for creating innovations and technologies to the world. Thus, I have founded Emergence in Parallel to my position to as a Managing Director for Emirates German. We have created unique business models, solutions and products using different form of technology with a focus on Mobility Verticals.

I have built a team of around 12 peoples (+5 depending on some projects), We have established offices in Amman and Dubai, built some capabilities in the following ares:
1) Drone technology.
2) Web and Mobile application developments.
3) Mobility based solutions:
- Assets management solutions.
- Outdoor operations enhancements solutions.
- Hospitality quality mobility solutions.
4) Games and Virtual reality experiences development
5) In Addition to my core expertise in Rail Consultancy in maintenance and operations.

We have developed unique Business Models and execute them and pursue some VC investments for further expansion. Emergence is in a strong position to continue creating unique defensible values.

We have B2C and B2B operations with sustainable accounts on both models.

Owner and Managing Director à Emirates German Building Materials
  • Émirats Arabes Unis - Dubaï
  • février 2014 à juin 2015

I have inherited a difficult business from my Father the late Salim Naser. The business was a building materials company that acts as a distributor for three major German Building Materials Manufacturers. Pfeifer, Jordahl and H-BAU.

In that period:
1) I have hired a transition operations team.
2) Kept the company running and secured group of new projects and orders.
3) Kept the suppliers (Pfeifer, Jordahl and H-BAU) in the house.
4) Positioned the company for a successful exit.

As it was clear that this type of business is not my cup of tea, in a time where construction market and payments are being put on hold, I have positioned the company for a successful and strategic business exit after long negotiations with three major construction groups. Successfully, Sold the company to Ammar Al Kadi Group who has close relationships with Mohammed Hamad Al Mana Group.

Now, the company is fully operational through the staff that I have hired however, under different ownership.

RAMS and Safety Consultant at TUV Rhineland Middle East à Emirates German Building Materials
  • Émirats Arabes Unis - Dubaï
  • novembre 2013 à mars 2014

• Producing systems engineering plans and safety matrices for Doha Green line Metro, these plans include :
o Requirements Management Plans.
o Electromagnetic Compatibility Plan.
o RAMS Management Plan.
o Interface Management Plan.
o Configuration Management Plan.
o Safety Management Plan.

• Working and producing several ISA for Dubai Air Port people Mover and King Abdullah Financial District projects.
• Development and update of Hazard logs.
• My tasks included Directing, advising and supervising the design team regarding RAMS.

Postgraduate Researcher à University of Birmingham
  • Royaume Uni - Birmingham
  • décembre 2012 à novembre 2013

• Research Around the areas of Assets Management and Systems Engineering.
• Particular focus on Data Analysis.

Systems Assurance Consultant à Consolidated Consultants
  • Turkménistan
  • septembre 2010 à novembre 2012

o Responsible for the Supervision of construction of 325 km’s of new track, eight stations, three depots and other facilities.
o Quality Control and Assurance. Gathering products and material approval certificates, the follow up of laboratory analysis of soil and concrete, checking that the construction is built according to designs and specifications.
o Procedure Formulation, creating the procedure for communication and consultancy with the contractor this includes the definition of hold points and mile stones, the staged inspection process, snag lists and non-conformance reports.

Éducation

Master, Railway Systems Engineering
  • à University of Birmingham
  • décembre 2011

o Master dissertation title is “Structural Analysis of A Novel Wind-Blown Sand Railway Protection Technique” o Final Grade: Distinction. o University of Birmingham is the leading university of railway research in UK.

Baccalauréat, Civil Engineering
  • à University of Jordan
  • août 2010

o Final year project title is “A Full Design of a Medium Size Reinforced Concrete Structure

Specialties & Skills

Tender Preperations
Product Creation
Business Development
Marketing
Management

Langues

Arabe
Langue Maternelle
Anglais
Expert