Fitz Gerald Castillo, Electrical Engineer

Fitz Gerald Castillo

Electrical Engineer

Qatar Design Consortium

Location
Qatar - Doha
Education
Bachelor's degree, Electrical Engineering
Experience
21 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :21 years, 4 Months

Electrical Engineer at Qatar Design Consortium
  • Qatar
  • My current job since July 2012

Projects Handled:
- Qatar Shell GTL Al Mirqab Tower Refurbishment
- Upgradation of Fire Safety Systems at Ministry of Public Health Building
- Umm Al Houl Power IWPP (Desalination Plant)
- 10 units of G+2 Housing Project (Rasgas Staff Housing Project)
- Rehabilitation and Extension of 4 Health Centers (Primary Health Care Center Corp.)
- Umm Al Houl Independent Water and Power Project (Water Island)
- Upgradation of Fire Safety Systems at Qatar Airways - ITC Building
- Qatar Airways Medical Commission Building
- GWC Proposed Open Storage for NOC RLIC Tract A, B, C & D
- Hamad International Airport Al Safwa Project
• Responsibilities were to maintain the records of all proceedings, correspondence, approvals
and milestones for the Projects assigned.
• Ensure the works are executed in accordance with the drawings and technical specifications.
• Provide design clarifications, corrections or amendments if required as per the site conditions
or as required by the contractor for execution of works.
• Supervise the Execution of works. Carry out regular inspections of installation and materials
to ensure compliance with the Construction Contract documents and statutory requirements.
• Review the project programme submitted by the Contractor, monitor progress in relation to
this programme.
CV

QC at Muhibbah Engineering Bhd
  • Qatar
  • May 2010 to June 2012

Review, update and comment on monthly reports prepared by the Contractor on the progress
of the project and submit to the Client.
• Review shop drawings, samples and other documents submitted by the Contractor, for
compliance with the Construction documents and the design intent.
• Inspect materials delivered to the site to ensure compliance with the Construction Contract
documents and the design intent.
• Implement procedures on site for Quality Assurance and Quality Control and Safety.
• Coordinate and prepare design certification necessary for the completion of the work,
including certification required by the authorities.
• Prepare progressive snagging lists throughout the construction period culminating in a final
list attached to the taking over certificate.
• Valuation of works executed, certification of Contractor’s payments.

QA at ETA Ascon M&E Division
  • United Arab Emirates
  • June 2008 to May 2010

Project: Dubai Metro - a fully automated Light Rail Transit with a total of 70km of lines, and 47
stations (including 9 underground stations)
• Responsibilities were implementation and monitoring of approved Quality Control/ Assurance
Manual for Electro-Mechanical scope of work.
• Attend Inspection of material and equipment arriving on site as per approved Material
Submittals.
CV

QA at Faysal M. Qahtani Sons Co
  • Saudi Arabia
  • June 2006 to December 2007

Perform in-process and final inspection of all MEP activities based on approved Project
Specification, Inspection Test Plan, Method Statements and Engineering drawings.
• Ensure that activities affecting quality will be accomplished under controlled conditions based
on the approved Quality Control Plan.
• Preparation of inspection and testing reports, energization packages and other attachment
required for inspection acceptance and completion reports.
• Prepare snag list of all completed MEP installation.
• Verify and close all raised rectified snag list/ punch list by Site Engineer.
• Issue Non-Conformance Report (NCR) on items that was not done as per the approved
drawings, specification and quality works standard.
• Verify countermeasures and corrective/preventive actions for issued NCR.
• Witness all testing and final commissioning of the project and report all failures and problems
that arise.

Engineer at Samsung Electro-Mechanics Philippines Inc
  • Philippines
  • January 2006 to June 2006

Responsibilities were performing Work Instruction/Process Audit.
• Verify countermeasures and corrective/preventive actions for the non conforming items found
during audit.
• In charge of the documentation and control of all MLCC (Multi Layer Ceramic Capacitor)
related working standards.
• Take Responsibility for the control of GPDM (Global Product Data Management) system.
• Prepares and submit weekly report on working standard status.
• Facilitate the training of new Engineers.

Electrical Engineer at Sunpack Container and Packaging Corp
  • Philippines
  • April 2004 to June 2005

Project: Manufacturing Plant for Pulp Molded Container
• Preparation of load schedule, electrical layouts, shop drawings.
• Prepare material take-off.
• Preparation of manpower work schedule.
• Check all delivered materials if it conforms to the specification.
• Site supervision and coordinate with other trades of discipline.
• Prepare the monthly progress/ status report and monthly statement of billing.
• Reporting to and assisting the project manager on the progress of the project.
• Supervise the pre-commissioning test of the electrical installation prior to handing over.

Deputy Supervisor at Sunpack Container and Packaging Corp
  • Philippines
  • February 2003 to June 2005

Responsibilities were preparing electrical/ mechanical layouts for Maintenance/ Engineering
Department.
• Check mechanical layouts / technical drawings.
• Assure the accuracy of Job Order and Factory Card before releasing to Engineering and
Production Dept.
• Make sure the availability of rubber die/ photo plate and die-cut blades based on the
production schedule.
• Analyze sample product and prepare material analysis of the same.
• Take responsibility of the procurement of sample product.
• Attend customer technical inquiry.
• Facilitate the training of new Engineers.

Trainee Engineer at Fuji-Haya Electric Corp
  • Philippines
  • April 2001 to May 2001

Prepare a single line and three line diagrams of switchgear and panel boards using AutoCAD.

Education

Bachelor's degree, Electrical Engineering
  • at Southern Luzon State University
  • April 2002

in

Specialties & Skills

Inspection
Preparation
Testing
MATERIALS MANAGEMENT
MICROSOFT WORKS
PROGRESS
MECHANICAL
QUALITY
QUALITY CONTROL
SHELL SCRIPTING
ADOBE PHOTODELUXE