SITE ENGINEER
AIA GROUP
Total years of experience :15 years, 3 Months
• Perform field quality control observations and assessments.
• Inspect and assess the quality of materials being used for construction projects.
• Calculate the quantity of material, supplies and equipment needed for each individual project.
• Oversee the work of field staff to ensure efficacy of work procedures.
• Ensure compliance to project specifications.
• Make sure that all construction activities are being carried out in accordance to preset safety rules.
• Ensure availability of resources and materials at all times.
• Provide recommendations for repair work and make sure that deadlines are compiled to.
• Determine project feasibility and direct all resources to the site in a time efficient manner.
• Prepare period reports and assessments for each project phase.
• Discussing requirements with the client and other professional (e.g. architects).
• Ability to communicate effectively with the field staff and project leadership on relevant quality and safety procedure.
• prepare purchase orders to obtain materials, tools, and equipment
• Experience in progress and productivity measurement
• Preparation of Schedules at pre tendering stage.
• able to identify, analyses and solve problems
• good oral and written communication skills
• aptitude for computing and design
• practical and creative
• able to accept responsibility
• Preparing tender and contract documents, including bills of quantities with the architect and/or the client
• Performing risk, value management and cost control
• Preparing and analyzing costing for tenders
• Create, maintain, review and administer construction schedules and plans
• Gathers and analyzes information to prepare reports on the progress of projects
• familiar with KSA Building Codes and Standards.
• Read and analyze project Bill of quantity, specifications and plans/drawings.
• Prepare an estimated bill of Quantity for design and build projects only.
• Analyze and validate an existing BOQ and note any differences.
• Estimate the required time and cost of a potential project.
• Prepare an initial bid package for management final review.
•Redesigned some elements in construction.
•Create project time schedule with critical path